Home › Export rates › E.ON Next Export Exclusive v3
E.ON NextE.ON Next Export Exclusive v3: 13p/kWh
Checked directly against E.ON Next's own tariff page on 3 September 2026. Suppliers are named factually; this is not a partnership or an endorsement.
The rate, and who can get it
The rate
13p/kWh.
Source: eonnext.com, checked 3 September 2026.
Who can get it
- Import energy tariff with E.ON Next, excluding time-of-use tariffs such as Next Drive
- Residential customers only
- Renewable generation system (e.g. solar) up to 15kW
- Open to both new and existing customers
- Smart export meter with half-hourly data consent required
Import energy tariff must be with E.ON Next, excluding time-of-use tariffs (e.g. Next Drive).
Does this pair with a Clearline-arranged installation?
Yes, in principle. E.ON Next does not require the solar or battery to be installed by E.ON Next itself for this rate.
| Package | System, installed | Export income, year one | Total year one benefit | Simple payback |
|---|---|---|---|---|
| LONGi solar only | £6,360 | £643 | £890 | 7.1 yrs |
| Solar + Duracell Dura16 | £10,810 | £643 | £1,193 | 9.1 yrs |
| Solar + Tesla Powerwall 3 | £12,710 | £643 | £1,193 | 10.7 yrs |
Standard 12 panel, 6.36 kWp system, national mean yield, 2,700 kWh typical use, run through the same model as every county page. Your free design call prices your actual roof.
Every installation is carried out by teams holding:
How E.ON Next Export Exclusive v3 compares
The highest flat rate we checked across every supplier is Good Energy's Solar Savings Exclusive at 25p/kWh. This tariff pays 13p/kWh, 12.0p below that. Compare all 26 on one page →
Other export tariffs
E.ON Next Export Exclusive v3 questions, answered
How much does E.ON Next pay on Export Exclusive v3?
13p/kWh, as published on E.ON Next's own tariff page and checked 3 September 2026.
Who can get Export Exclusive v3?
Import energy tariff with E.ON Next, excluding time-of-use tariffs such as Next Drive. Residential customers only. Renewable generation system (e.g. solar) up to 15kW. Open to both new and existing customers. Smart export meter with half-hourly data consent required.
Does this work with a Clearline-arranged installation?
Yes, in principle. E.ON Next does not require the solar or battery to be installed by E.ON Next itself for this rate.
Get your free quote
Takes about two minutes. We work out your options, then confirm your free remote design call, on video, at a time that suits you. It starts with your roof and your numbers, and the design is built around them rather than around a product someone needs to shift.





