E.ON Next Flex Export v1: 6p/kWh
Checked directly against E.ON Next's own tariff page on 28 October 2026. Suppliers are named factually; this is not a partnership or an endorsement.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
The rate, and who can get it
The rate
6p/kWh.
Variable SEG rate, no exit fees.
Source: eonnext.com, checked 28 October 2026.
Who can get it
- Renewable generation system (e.g. solar) up to 5MW
- Open to new and existing customers
- Smart export meter with half-hourly data consent required
None required: open to new and existing customers regardless of import supplier.
Does this pair with a Clearline installation?
Yes, in principle. E.ON Next does not require the solar or battery to be installed by E.ON Next itself for this rate.
| Package | System, installed | Export income, year one | Total year one benefit | Simple payback |
|---|---|---|---|---|
LONGi solar only | £6,360 | £297 | £543 | 11.7 yrs |
Solar + Duracell Dura16 | £10,810 | £201 | £877 | 12.3 yrs |
Solar + Tesla Powerwall 3 | £12,710 | £201 | £877 | 14.5 yrs |
Standard 12 panel, 6.36 kWp system, national mean yield, 2,700 kWh typical use, run through the same model as every county page. Your free design call prices your actual roof.
Every installation is carried out by our teams, who hold:
How E.ON Next Flex Export v1 compares
The highest all-day rate we checked across every supplier is Good Energy's Solar Savings Exclusive at 25p/kWh. This tariff pays 6p/kWh, 19p below that. Compare all 35 on one page →
Other export tariffs
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
E.ON Next Flex Export v1 questions, answered
How much does E.ON Next pay on Flex Export v1?
6p/kWh, as published on E.ON Next's own tariff page and checked 28 October 2026.
Who can get Flex Export v1?
Renewable generation system (e.g. solar) up to 5MW. Open to new and existing customers. Smart export meter with half-hourly data consent required.
Does this work with a Clearline installation?
Yes, in principle. E.ON Next does not require the solar or battery to be installed by E.ON Next itself for this rate.
Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.





