Solar panels in Gillingham (Medway), sized to your roof.
About 6,660 kWh a year from 12 panels in Gillingham (Medway), £6,360 installed, with your system designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Gillingham (Medway)'s solar year
From 37.3 kWh per kWp in December to 129.1 in July: a roof in Gillingham (Medway) makes 3.5 times as much in its best month as in its darkest, and 1,047 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 38.5 |
| February | 51.1 |
| March | 88.4 |
| April | 119 |
| May | 125 |
| June | 127 |
| July | 129 |
| August | 115 |
| September | 101 |
| October | 69.3 |
| November | 48 |
| December | 37.3 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Gillingham (Medway) makes 1,047 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Gillingham (Medway) is 13% above it.
How Gillingham (Medway) compares
Gillingham (Medway) is one of 44 Kent towns we track, and it ranks 34th of 44 for solar yield. The House of Commons Library settlement data classes it as a large town of 114,176 people. At 1,047 kWh per kWp a year, a typical 12 panel system here pays for itself in around 6.8 years on the 12p scenario: £933 of year one benefit against £6,360 installed, £247 of that benefit from cutting 26.32p imports with your own generation.
These are starting numbers, not a quote. The calculator below opens on Gillingham (Medway)'s own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Medway is the planning authority covering Gillingham (Medway), which the House of Commons Library classes as a large town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Gillingham (Medway) (51.3706, 0.57593), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
Who runs the grid in Gillingham (Medway)
The distribution network operator (DNO) for Gillingham (Medway) is UK Power Networks, which runs the South East England licence area.
G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, UK Power Networks only has to be told within 28 days after the system is commissioned.
A bigger inverter or battery output needs a G99 application in advance. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Gillingham (Medway)
A heat pump in Gillingham (Medway)
A heat pump does most of its work from November to February. Over those four months, 12 panels in Gillingham (Medway) make about 1,110 kWh, against 3,150 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Gillingham (Medway)
A 12-panel roof in Gillingham (Medway) makes about 820 kWh in July. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Gillingham (Medway)
Faults, servicing and ageing inverters follow the same economics in Gillingham (Medway) as anywhere else, and the guides below price them plainly.
Common questions about solar in Gillingham (Medway)
What does a solar panel system produce in Gillingham (Medway)?
Each kWp of panels in Gillingham (Medway) makes 1,047 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,660 kWh, from about 240 kWh in December up to 820 kWh in July.
How much are solar panels in Gillingham (Medway)?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Gillingham (Medway) before a battery. What Gillingham (Medway) changes is the return, about 6,660 kWh a year from that system, and your design call prices your actual roof.
Would a system in Gillingham (Medway) need approval from the network operator?
Gillingham (Medway) is on UK Power Networks' network (South East England licence area). Systems up to 3.68kW per phase of inverter output follow G98: UK Power Networks is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator. Our G98 vs G99 guide explains both routes.
How much can I earn from exporting solar in Gillingham (Medway)?
With typical use and no battery, a 12-panel system in Gillingham (Medway) exports about 5,722 kWh a year. At 12p per kWh that is roughly £687; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Is solar worth it in Gillingham (Medway) in winter?
It works, but the year is lopsided. 68% of a Gillingham (Medway) roof's output lands between April and September; the four months from November to February give about 1,110 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.
How Gillingham (Medway) compares with its neighbours
The six closest towns we publish, run through the identical PVGIS query as Gillingham (Medway).
| Town | kWh per kWp a year | vs Gillingham (Medway) |
|---|---|---|
| Gillingham (Medway) | 1,047 | this town |
| Chatham | 1,043 | −4 kWh |
| Hoo St Werburgh | 1,057 | +10 kWh |
| Rochester | 1,043 | −4 kWh |
| Snodland | 1,051 | +4 kWh |
| Bearsted | 1,055 | +8 kWh |
| Sittingbourne | 1,073 | +26 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also for Gillingham (Medway): Solar panels in Gillingham (Medway) from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Gillingham (Medway) homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
Do solar panels work in winter? Yes, just less than summer
Panels run on light, not sunshine. Cloud turns them down, not off. What that means for an awkward roof.
Read the guide →Does a standalone battery actually pay back?
No panels means one job: buy cheap, use later. The tariff decides whether it pays.
Read the guide →Three phase and EV charging: what actually changes
Three phase buys 22kW charging. Most cars cannot use it, and load balancing usually solves the real problem.
Read the guide →How an air source heat pump actually works
It moves heat rather than making it. The cycle, the efficiency numbers and the trade-offs.
Read the guide →Which tariffs are actually built for battery charging
A battery buys cheap and uses dear. The tariff decides how much that is worth.
Read the guide →How to check an MCS certificate is genuine, before the deposit leaves your account
A logo proves nothing. Certification is business specific, technology specific and checkable.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.