0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Shropshire

Solar panels in Telford, sized to your roof.

A 12-panel roof in Telford makes about 6,120 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Telford

What a roof in Telford can generate

Telford's best month is July, at 119.1 kWh per kWp; December manages 33. Over the year that comes to 962 kWh per kWp, 1% above our Shropshire county estimate.

Map showing Telford in Shropshire A simplified outline map of Shropshire with neighbouring counties shown faintly, and a pin marking the location of Telford.
Telford in Shropshire

Generation per kWp, month by month

Telford, 962 kWh per kWp a year
Telford, monthly generation per kWp Bar chart, twelve months January to December. Peak July at 119 kWh/kWp. Lowest December at 33 kWh/kWp. Full values are in the table below this chart. 137 0 JFMAMJJASOND 119
Show the monthly figures
Telford, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January34.5
February50.9
March82.9
April109
May119
June116
July119
August105
September89.5
October61.4
November41.1
December33

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

6,120kWh a year, 12 panels
760kWh in July, the peak
210kWh in December

For scale: 962 kWh per kWp in Telford against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Telford 4% above it.

How Telford compares

Telford is one of 9 Shropshire towns we track, and it ranks 5th of 9 for solar yield. The House of Commons Library settlement data classes it as a large town of 164,570 people. At 962 kWh per kWp a year, a typical 12 panel system here pays for itself in around 7.3 years on the 12p scenario: £868 of year one benefit against £6,360 installed, £247 of that benefit from cutting 26.32p imports with your own generation.

These are starting numbers, not a quote. The calculator below opens on Telford's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.

Telford sits within Telford and Wrekin, its local planning authority, and the House of Commons Library classes it as a large town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£868
£72 a month · payback 7.3 yrs
System price, installed
£6,360
Simple payback
7.3 yrs
Generates a year
6,118 kWh
Exported
5,182 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Modelled for Telford at 52.68394, -2.46632 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.

Local grid

Connecting solar to the Telford network

Telford sits in National Grid Electricity Distribution's West Midlands licence area, so NGED is the network operator (DNO) any solar panels or battery here are registered with.

Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to NGED within 28 days of commissioning, with no prior approval.

Anything bigger is a G99 case and is applied for first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.

Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Aerial view of a residential UK street where several homes have black solar panels fitted to rear roof pitches
Several homes on the same street, all now fitted with solar.
Beyond solar

Adding a heat pump or an EV charger in Telford

A heat pump in Telford

Solar and a heat pump pull in opposite directions through the year: Telford's roofs make 1,010 kWh from November to February on a 12-panel system, and 2,920 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.

The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in Telford

A 12-panel roof in Telford makes about 760 kWh in July. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.

The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).

EV charging explained

Local detail

What else is true of Telford

Telford was designated a new town in 1968, extending the earlier Dawley New Town of 1963, and most of its housing was built from the late 1960s through the early 1990s, starting with the Sutton Hill estate in 1967. That means Telford's roofs are mostly post-1968 new-town stock rather than older Victorian terraces, typically giving more consistent, lower-density layouts with modern roof forms and fewer of the shading and access problems that come with a Victorian terrace row.

Telford sits in National Grid Electricity Distribution territory, on its West Midlands licence. National Grid Electricity Distribution's own published Guaranteed Standard is 45 working days for a low voltage generation quotation, with a complete application acknowledged within 10 working days; most single home systems use the quicker 28-day G98 route instead. Telford and Wrekin Council is the planning authority, with eight conservation areas including Wellington, Newport and the Severn Gorge.

The council declared a Climate Emergency on 25 July 2019 and has committed to carbon neutrality for its own operations by 2030, one of the earlier declarations among the councils Clearline covers. It has already fitted a 37.4kW solar system at Oakengates Theatre, expected to generate around 33,540kWh a year, and new Nuplace housing at Southwater Way and Granville, Donnington is being built with solar panels fitted as standard from day one.

Planning authority: Telford and Wrekin Council

Sources: telford.gov.uk · sustainabletelfordandwrekin.com

FAQs

Telford solar questions

What could a roof in Telford generate?

PVGIS puts a roof in Telford at 962 kWh per kWp a year, 2.63 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,120 kWh a year, most of it between April and September.

What would 12 solar panels cost in Telford?

£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Telford differs is output: about 6,120 kWh a year from that system.

Do I need permission from the DNO for solar in Telford?

Usually not in advance. NGED, the network operator for Telford, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. "See our DNO explainer.

How much would export pay on a system in Telford?

It is exported. With typical use and no battery, about 5,182 kWh of the 6,120 kWh a 12-panel system makes in Telford goes to the grid, around £622 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.

Do solar panels work in winter in Telford?

Yes, at a lower level. PVGIS gives Telford 33 kWh per kWp in December and 34.5 in January, so a 12-panel system makes about 210 kWh and 220 kWh in those months, against 760 kWh in July. Winter output mostly covers daytime use rather than exporting.

How Telford compares with its neighbours

Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.

TownkWh per kWp a yearvs Telford
Telford962this town
Shifnal965+3 kWh
Newport (Telford and Wrekin)959−3 kWh
Bridgnorth961−1 kWh
Shrewsbury969+7 kWh
Codsall947−15 kWh
Perton960−2 kWh

Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.

Also for Telford: Solar panels in Telford from OVO Solar & Battery

All of Shropshire

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Telford. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.