Solar panels in Maidstone, with the numbers shown.
About 6,720 kWh a year from 12 panels in Maidstone, £6,360 installed, with your system designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in Maidstone can generate
Maidstone's best month is July, at 129.7 kWh per kWp; December manages 38.3. Over the year that comes to 1,056 kWh per kWp, 2% below our Kent county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 38.7 |
| February | 53.2 |
| March | 89.4 |
| April | 119 |
| May | 126 |
| June | 128 |
| July | 130 |
| August | 115 |
| September | 101 |
| October | 69.7 |
| November | 48.4 |
| December | 38.3 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 1,056 kWh per kWp in Maidstone against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Maidstone 14% above it.
How Maidstone compares
Maidstone is one of 44 Kent towns we track, and it ranks 23rd of 44 for solar yield. The House of Commons Library settlement data classes it as a large town of 116,187 people. At 1,056 kWh per kWp a year, a typical 12 panel system here pays for itself in around 6.8 years on the 12p scenario: £940 of year one benefit against £6,360 installed, £247 of that benefit from cutting 26.32p imports with your own generation.
These are starting numbers, not a quote. The calculator below opens on Maidstone's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Planning applications in Maidstone go to its own council, and the House of Commons Library classes it as a large town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Maidstone at 51.26826, 0.52357 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
Connecting solar to the Maidstone network
Maidstone sits in UK Power Networks' South East England licence area, so UK Power Networks is the network operator (DNO) any solar panels or battery here are registered with.
G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, UK Power Networks only has to be told within 28 days after the system is commissioned.
A bigger inverter or battery output needs a G99 application in advance. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Maidstone
A heat pump in Maidstone
Solar and a heat pump pull in opposite directions through the year: Maidstone's roofs make 1,140 kWh from November to February on a 12-panel system, and 3,170 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Maidstone
From April to September, 68% of a Maidstone roof's yearly output arrives, peaking at about 820 kWh in July on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Maidstone
Guidance is nationwide, so the benchmarks hold in Maidstone: repair costs, service scope, and when the inverter is the real fault.
Common questions about solar in Maidstone
What could a roof in Maidstone generate?
PVGIS puts a roof in Maidstone at 1,056 kWh per kWp a year, 2.89 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,720 kWh a year, most of it between April and September.
How much are solar panels in Maidstone?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Maidstone before a battery. What Maidstone changes is the return, about 6,720 kWh a year from that system, and your design call prices your actual roof.
Do I need permission from the DNO for solar in Maidstone?
Usually not in advance. UK Power Networks, the network operator for Maidstone, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator. "See our DNO explainer.
How much can I earn from exporting solar in Maidstone?
With typical use and no battery, a 12-panel system in Maidstone exports about 5,779 kWh a year. At 12p per kWh that is roughly £694; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Do solar panels work in winter in Maidstone?
Yes, at a lower level. PVGIS gives Maidstone 38.3 kWh per kWp in December and 38.7 in January, so a 12-panel system makes about 240 kWh and 250 kWh in those months, against 820 kWh in July. Winter output mostly covers daytime use rather than exporting.
How Maidstone compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Maidstone |
|---|---|---|
| Maidstone | 1,056 | this town |
| Bearsted | 1,055 | −1 kWh |
| Larkfield | 1,059 | +3 kWh |
| Kings Hill | 1,059 | +3 kWh |
| Snodland | 1,051 | −5 kWh |
| Chatham | 1,043 | −13 kWh |
| Gillingham (Medway) | 1,047 | −9 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Maidstone: Solar panels in Maidstone from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Maidstone
Sourced, dated and written by us. The same ground we cover on your free call.
Why solar panels stop working, and how to work out which one it is
There is an order to this, and it starts at the inverter display rather than the roof.
Read the guide →GivEnergy in administration: what owners should do now
The sourced timeline, the warranty position, and the owner's checklist for this month.
Read the guide →How time of use charging windows actually work
How a cheap overnight window is metered and billed, and what a battery does inside it.
Read the guide →The Boiler Upgrade Scheme, explained
A fixed amount, claimed on your behalf by our installation teams, with a real deadline on the £9,000 version.
Read the guide →Will energy prices keep rising, and by how much
The January forecasts jumped fast. What is confirmed, what is guessed, and whether solar is a real hedge.
Read the guide →NAPIT, NICEIC and competent person schemes: who tells building control about your solar
Solar work is notifiable. A competent person scheme means your installation team notifies, not you.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.