Home › Export rates › OVO Energy SEG Install Exclusive
OVO EnergyOVO Energy SEG Install Exclusive: up to 20p/kWh
Checked directly against OVO Energy's own tariff page on 3 September 2026. Suppliers are named factually; this is not a partnership or an endorsement.
The rate, and who can get it
The rate
Up to 20p/kWh.
- 20p/kWh, solar and battery installed by ovo
- 15p/kWh, solar only installed by ovo
Source: ovoenergy.com, checked 3 September 2026.
Who can get it
- Installed capacity under 30kW
- Electricity supply must be with OVO
- OVO must install the solar panels and/or battery
- MCS-certified system, or equivalent
- Smart meter required
- Battery schematics diagram required if a battery is installed
- Application approval takes around 4 weeks per OVO's own page
Electricity supply must be with OVO; solar and/or battery must be installed by OVO.
Does this pair with a Clearline-arranged installation?
No. OVO Energy pays this rate only when it installs the solar and/or battery itself, not when a separate installation team does the work.
Because OVO Energy must install the system itself to pay this rate, it sits outside a Clearline-arranged installation and no payback table is shown here.
Every installation is carried out by teams holding:
How OVO Energy SEG Install Exclusive compares
The highest flat rate we checked across every supplier is Good Energy's Solar Savings Exclusive at 25p/kWh. This tariff pays up to 20p/kWh, 5.0p below that. Compare all 26 on one page →
Other export tariffs
OVO Energy SEG Install Exclusive questions, answered
How much does OVO Energy pay on SEG Install Exclusive?
Up to 20p/kWh. 20p/kWh (solar and battery installed by ovo), 15p/kWh (solar only installed by ovo).
Who can get SEG Install Exclusive?
Installed capacity under 30kW. Electricity supply must be with OVO. OVO must install the solar panels and/or battery. MCS-certified system, or equivalent. Smart meter required. Battery schematics diagram required if a battery is installed. Application approval takes around 4 weeks per OVO's own page.
Does this work with a Clearline-arranged installation?
No. OVO Energy pays this rate only when it installs the solar and/or battery itself, not when a separate installation team does the work. The live table on the export rates hub shows which tariffs do.
Get your free quote
Takes about two minutes. We work out your options, then confirm your free remote design call, on video, at a time that suits you. It starts with your roof and your numbers, and the design is built around them rather than around a product someone needs to shift.





