Octopus Flux: 28.90p to 31.75p/kWh at peak
Checked directly against Octopus Energy's own tariff page on 28 October 2026. Suppliers are named factually; this is not a partnership or an endorsement.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
The rate, and who can get it
The rate
28.90p to 31.75p peak, 16:00 to 19:00, by region.
- 28.90p to 31.75p/kWh, peak 16:00 to 19:00
- 10.60p to 11.64p/kWh, standard
- 4.50p to 4.94p/kWh, 02:00 to 05:00
No exit fees or tie-ins; Octopus's own page states the customer is 'free to switch tariffs or change suppliers at any time'. Flux is a flexible tariff, so rates can change.
Source: octopus.energy, checked 28 October 2026.
Who can get it
- Smart meter providing half-hourly readings required (SMETS2, or a Secure SMETS1)
- A solar system and a home battery, per Octopus's stated eligibility list; Octopus's page says it works with all solar and battery systems
- Must be an Octopus Energy customer for both import and export (export is onboarded through Outgoing Octopus first)
- An Export MPAN is required; Octopus can apply for one if the household does not have it
- MCS documentation for the solar system is required before the switch completes
Combined import-and-export tariff: Flux prices both directions on the same three-band structure. It is not paired with a separate Octopus import product, and the export rates above only apply on Flux.
All 14 regions, p/kWh
| Region | 02:00 to 05:00 | Standard, the rest of the day | Peak, 16:00 to 19:00 |
|---|---|---|---|
A: Eastern England | 4.72p | 11.12p | 30.33p |
B: East Midlands | 4.50p | 10.60p | 28.90p |
C: London | 4.72p | 11.11p | 30.31p |
D: Merseyside and North Wales | 4.94p | 11.64p | 31.75p |
E: West Midlands | 4.54p | 10.70p | 29.18p |
F: North East England | 4.52p | 10.64p | 29.01p |
G: North West England | 4.70p | 11.07p | 30.19p |
H: Southern England | 4.70p | 11.06p | 30.16p |
J: South East England | 4.77p | 11.23p | 30.64p |
K: South Wales | 4.71p | 11.10p | 30.26p |
L: South Western England | 4.72p | 11.11p | 30.30p |
M: Yorkshire | 4.54p | 10.70p | 29.18p |
N: Southern Scotland | 4.63p | 10.91p | 29.75p |
P: Northern Scotland | 4.67p | 11.01p | 30.03p |
Read from Octopus Energy's published rates on 28 October 2026. Export is not subject to VAT, so these figures are the same with or without it. They move with the supplier's flexible rates: Octopus Energy changed them on 19 October 2026, so treat them as a snapshot. Source: octopus.energy.
This is the export side. See the full import rates, windows and eligibility on the Octopus Energy Flux tariff page →
Does this pair with a Clearline installation?
Yes, in principle. Octopus Energy does not require the solar or battery to be installed by Octopus Energy itself for this rate. A battery is still a condition of the tariff, whoever installs it.
Because the rate depends on the time of day and your region, we have not run it through the payback model; see the flat-rate tariffs on the export rates hub for a modelled figure.
Every installation is carried out by our teams, who hold:
How Octopus Flux compares
The highest all-day rate we checked across every supplier is Good Energy's Solar Savings Exclusive at 25p/kWh. Compare all 35 on one page →
Other export tariffs
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Octopus Energy Flux questions, answered
How much does Octopus Energy pay on Flux?
It depends on your region. Peak, 16:00 to 19:00: 28.90p to 31.75p/kWh. Standard, the rest of the day: 10.60p to 11.64p/kWh. 02:00 to 05:00: 4.50p to 4.94p/kWh. Rates read from Octopus Energy's published rates on 28 October 2026; they change with the supplier's flexible rates.
Who can get Flux?
Smart meter providing half-hourly readings required (SMETS2, or a Secure SMETS1). A solar system and a home battery, per Octopus's stated eligibility list; Octopus's page says it works with all solar and battery systems. Must be an Octopus Energy customer for both import and export (export is onboarded through Outgoing Octopus first). An Export MPAN is required; Octopus can apply for one if the household does not have it. MCS documentation for the solar system is required before the switch completes.
Does this work with a Clearline installation?
Yes, in principle. Octopus Energy does not require the solar or battery to be installed by Octopus Energy itself for this rate. A battery is still a condition of the tariff, whoever installs it.
Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.





