HomeExport rates › Octopus Energy SEG standard

Octopus Energy

Octopus Energy SEG standard: 4.1p/kWh

Checked directly against Octopus Energy's own tariff page on 3 September 2026. Suppliers are named factually; this is not a partnership or an endorsement.

The rate, and who can get it

The rate

4.1p/kWh.

Source: octopus.energy, checked 3 September 2026.

Who can get it

  • Renewable generation technology must be MCS or FlexiOrb certified
  • Meter capable of half-hourly export readings required (typically a smart meter)
  • Total installed capacity of 5MW or less (50kW or less for micro-CHP)
  • Generating system must be located in Great Britain
  • Cannot also be receiving Feed-in Tariff export payments

None required -- open to households whose electricity import is with any supplier.

The Clearline honesty check

Does this pair with a Clearline-arranged installation?

Yes, in principle. Octopus Energy does not require the solar or battery to be installed by Octopus Energy itself for this rate.

Effect of Octopus Energy SEG standard on payback per package, standard 12 panel system
PackageSystem, installedExport income, year oneTotal year one benefitSimple payback
LONGi solar only£6,360£203£44914.2 yrs
Solar + Duracell Dura16£10,810£138£81513.3 yrs
Solar + Tesla Powerwall 3£12,710£138£81515.6 yrs

Standard 12 panel, 6.36 kWp system, national mean yield, 2,700 kWh typical use, run through the same model as every county page. Your free design call prices your actual roof.

See solar, installed

Every installation is carried out by teams holding:

  • MCS certified
  • TrustMark registered
  • NAPIT registered
  • NICEIC registered
  • RECC member
  • Which? Trusted Trader

How Octopus Energy SEG standard compares

The highest flat rate we checked across every supplier is Good Energy's Solar Savings Exclusive at 25p/kWh. This tariff pays 4.1p/kWh, 20.9p below that. Compare all 26 on one page →

FAQs

Octopus Energy SEG standard questions, answered

How much does Octopus Energy pay on SEG standard?

4.1p/kWh, as published on Octopus Energy's own tariff page and checked 3 September 2026.

Who can get SEG standard?

Renewable generation technology must be MCS or FlexiOrb certified. Meter capable of half-hourly export readings required (typically a smart meter). Total installed capacity of 5MW or less (50kW or less for micro-CHP). Generating system must be located in Great Britain. Cannot also be receiving Feed-in Tariff export payments.

Does this work with a Clearline-arranged installation?

Yes, in principle. Octopus Energy does not require the solar or battery to be installed by Octopus Energy itself for this rate.

Free, no obligation

Get your free quote

Takes about two minutes. We work out your options, then confirm your free remote design call, on video, at a time that suits you. It starts with your roof and your numbers, and the design is built around them rather than around a product someone needs to shift.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

Call 07782 219224

Free, no obligation. No home visit needed.

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of installation teams. See our privacy notice.