EV chargingWhat an EV charger installation actually involves
Fitting a home charger is a half day on the wall and a fortnight of paperwork behind the scenes. Here is what your installation team is actually checking, what the network operator needs to know, and where jobs get held up.
Updated 4 August 2026 · written by the Clearline guidance team

On this page
- The five things that decide whether your job is simple
- The main fuse is the number that matters
- Load balancing, and why it is the cheapest fix in the job
- What your DNO needs, and when
- The day itself, step by step
- Earthing, and the earth rod question
- The paperwork you should end up holding
- What it costs
- Where jobs actually get delayed
The five things that decide whether your job is simple
- Your main fuse rating. 60A, 80A or 100A, and it decides whether load management is needed.
- Whether your supply is looped. One service cable shared with a neighbour limits the headroom available to you.
- The cable run. Distance from the consumer unit to the mounting position, and what it has to cross to get there.
- Consumer unit capacity. Whether there is a spare way and whether the board is suitable for a new dedicated circuit.
- What else is on the supply. An electric shower, a heat pump or a second charger all eat the same headroom.
None of these are exotic. All of them are why a competent installation team wants photographs of your meter box and consumer unit before quoting, rather than giving a price over the phone.
The main fuse is the number that matters
A 7kW charger draws 32A continuously. Your incoming main fuse is rated at 60A, 80A or 100A, and that rating determines whether the charger can simply be added or whether it has to be managed. On a 100A supply, approval for a standard 7.4kW charger is typically automatic and free, and comes back within one to five working days.
Older 60A supplies are not a dead end. In most cases the charger can still be fitted safely using load management rather than a full supply upgrade, which is a far cheaper outcome than it sounds when someone first tells you your fuse is too small. It is worth asking for that option explicitly before agreeing to any upgrade work.
Looped supplies are the other common surprise
A looped supply is where one service cable feeds two neighbouring houses. It was normal practice for decades and it is not a fault, but it constrains how much load your property can take. Your Distribution Network Operator may need to unloop the supply before a charger goes in, and that is network work with its own lead time.
Load balancing, and why it is the cheapest fix in the job
Load balancing works the same way solar surplus tracking does, through a CT clamp. The clamp goes around the incoming mains and measures total household current in real time. The charger then throttles its own output to keep the total demand inside the supply limit, so when the oven, the kettle and the shower are all running the car charges more slowly, and when the house goes quiet it returns to full speed.
Dynamic load management responds within about 1.5 seconds, which is fast enough that you never notice it happening. Adding CT-based load balancing typically costs £40 to £100. Set against a supply upgrade, that is the best value line item in the whole quote. On the Zappi, dynamic load balancing is a built-in optional setting to limit the current drawn from the supply or the grid, and the unit is supplied with the clip-on grid sensor to do it.
A small fuse is a reason for load balancing, not a reason to give up
The instinct when told a 60A supply cannot take a 32A charger is to price a supply upgrade. In most homes the correct answer is a CT clamp and dynamic load management for a fraction of the cost, giving full charging speed whenever the house is quiet, which is exactly when you charge anyway.
What your DNO needs, and when
Your Distribution Network Operator owns the cables in your street. Most domestic single phase chargers follow a connect-and-notify route: the installer fits the charger and notifies the DNO afterwards, typically within 28 days. There is usually no direct DNO fee for a standard notification. Larger or constrained installations follow an apply-first route instead, which means permission before connection rather than notification after it.
This is the same family of process that governs solar and battery connections, and if you are fitting more than one technology it is worth putting them through together rather than making three separate approaches. County pages on this site name the relevant network operator for your area, and you can reach yours from the coverage map.
The day itself, step by step
Survey and quote
Photographs or a visit covering the meter box, main fuse rating, consumer unit, proposed charger position and cable route. This is where a fixed price becomes possible.
Dedicated circuit installed
A new circuit from the consumer unit to the charger, correctly protected. The Zappi, for example, calls for a 32A Curve B breaker. Cable route, clipping and any drilling happen here.
Charger mounted and CT clamp fitted
The unit goes on the wall, the CT clamp goes around the incoming mains for load balancing and, where relevant, for solar surplus tracking.
Testing, commissioning and connection
Electrical testing, the app set up, tariff integration configured if your supplier supports it, and the default off-peak schedule confirmed.
Certification and notification
Your electrical installation certificate, building control notification through the installation team's competent person scheme, and the DNO notification.
Earthing, and the earth rod question
Older installations sometimes needed a separate earth rod driven into the ground to protect against a PEN fault on a PME supply. Modern units have made that largely historic. myenergi states the Zappi includes PEN fault technology as standard with no earth rod required, and its datasheet cites compliance with the relevant clause of BS 7671:2018 Amendment 1 for EV installations. If an installation team proposes an earth rod, it is fair to ask why the charger's own protection is not sufficient.
The paperwork you should end up holding
- An electrical installation certificate for the new circuit.
- Confirmation that the work was notified to building control, either through a registered competent person scheme such as NICEIC or NAPIT, or directly to your local authority.
- Confirmation that the DNO notification was submitted, and any reference it generated.
- The manufacturer warranty registration for the unit itself.
- If a grant applied, the grant reference and the deduction shown on your invoice.
Charger installation is notifiable electrical work. That is not a formality: it is the difference between a compliant installation and a problem at the point of sale or insurance claim. Use a registered competent person or make sure local building control has been notified.
What it costs
A typical 7kW smart charger installation lands at £800 to £1,200, made up of roughly £400 to £700 for the unit and £400 to £500 for labour. London and the South East commonly run £900 to £1,500. Complex jobs, meaning long cable runs, groundworks or a consumer unit upgrade, reach £1,200 to £1,500 or more.
The grant position is narrower than most people expect. The chargepoint grant covers renters, flat owners and landlords, plus households with only on-street parking using an approved cross-pavement solution, and the cap rose from £350 to £500 per socket on 1 April 2026. Owner-occupied houses with driveways get nothing, because the scheme that covered them closed in April 2022. You need off-street parking, or an approved cross-pavement solution, and an approved installer.
Get the survey questions answered before anyone quotes you. The free remote design call covers your fuse, your supply and your options in twenty minutes.
Get your free quote →Where jobs actually get delayed
Two things, almost every time. The first is a looped supply discovered at survey, which puts network work in front of the installation. The second is a consumer unit that cannot take another circuit safely, which turns a charger job into a board replacement. Both are found by a proper survey and neither is found by a phone call, which is the argument for getting eyes on the meter box early.
Clearline gives independent guidance and does not install. All installation work, certification and DNO notification are carried out by an MCS-certified installation team for your area.
Installation questions, answered
Do I need DNO approval for a home EV charger?
Most domestic single phase chargers follow a connect-and-notify route, where the installer fits the charger and notifies the Distribution Network Operator afterwards, typically within 28 days. Larger or constrained installations need permission before connection instead. There is usually no direct DNO fee for a standard notification.
How long does DNO approval take?
On a 100A supply, approval for a standard 7.4kW charger is typically automatic and free, coming back within one to five working days. Constrained supplies, looped supplies or larger installations take longer because the network operator has to assess capacity or carry out work first. Your installation team submits this on your behalf.
What happens if my main fuse is too small?
In most homes, nothing dramatic. Older 60A supplies can usually still take a charger safely using load management rather than a full supply upgrade, and CT-based load balancing typically costs £40 to £100. Ask for that option specifically before agreeing to any supply upgrade work.
What is load balancing on an EV charger?
A CT clamp around the incoming mains measures your total household current in real time, and the charger throttles its output to keep total demand inside the supply limit. Dynamic load management reacts within about 1.5 seconds, so the car charges more slowly when the house is busy and returns to full speed when it is quiet. It is what allows a 32A charger to sit safely on a supply that could not otherwise take it.
How much does it cost to install an EV charger?
A typical 7kW smart charger installation is £800 to £1,200, roughly £400 to £700 for the unit and £400 to £500 for labour. London and the South East commonly run £900 to £1,500, and complex jobs involving long cable runs, groundworks or a consumer unit upgrade reach £1,200 to £1,500 or more. Prices checked August 2026.
Do I still need an earth rod for an EV charger?
Usually not. Modern units include built-in PEN fault protection, and myenergi states the Zappi requires no earth rod on a PME supply, citing compliance with the relevant BS 7671 clause for EV installations in its datasheet. If an installation team proposes an earth rod, ask why the charger's own protection is not being relied on.
Is EV charger installation notifiable work?
Yes. It must be carried out by a registered competent person under a scheme such as NICEIC or NAPIT, or notified to your local building control. You should end up with an electrical installation certificate and confirmation that the notification was made.
See the numbers next: Tesla Powerwall 3, installed, or what a battery costs.
Figures and specifications in this guide are sourced below and were checked on the date shown. Rates and product specifications change; we confirm the current picture on your free design call.
Sources
- Typical installed cost of a 7kW smart charger, unit and labour split, and regional variation totalskills.co.uk
- Installed cost ranges including complex jobs heatable.co.uk
- DNO connect-and-notify route, 28 day notification and absence of a standard notification fee selectra.co.uk
- Main fuse ratings, automatic approval timescales on a 100A supply, and load management on 60A supplies bestchargers.co.uk
- Load management as an alternative to a supply upgrade where the main fuse is small altrinchamelectricalservices.co.uk
- Looped supplies, unlooping and finite headroom on a 100A single phase supply selectra.co.uk
- Load balancing mechanics, 1.5 second dynamic response and £40 to £100 typical cost wepoweryourcar.com
- CT clamp based energy management for EV chargers ecoharmony.co.uk
- myenergi Zappi v2.1 datasheet Rev 2.1.5, 32A Curve B breaker requirement, dynamic load balancing setting and supplied grid sensor myenergi.com
- myenergi Zappi PEN fault protection with no earth rod required myenergi.com
- Charger installation as notifiable work requiring a registered competent person or building control notification elec-mate.com
- EV chargepoint grant eligibility for renters, flat owners and landlords, and the cross-pavement route find-government-grants.service.gov.uk
- Grant cap increase from £350 to £500 per socket on 1 April 2026 expertsure.com
- Closure of the Electric Vehicle Homecharge Scheme to owner occupiers with driveways in April 2022 totalskills.co.uk
Read next
Home EV charger types and speeds, explained properly
Granny cable, 7kW wall unit or 22kW three phase. What each adds per hour, and which you need.
Read the guide →Smart charge point regulations, explained
Why your charger arrives pre-set to charge overnight, and why it waits before it starts.
Read the guide →Solar installation day: exactly what happens, hour by hour
The week before, the day itself hour by hour, and the paperwork that follows.
Read the guide →