Your MCS certificate: what it shows, when it arrives, and how a Smart Export Guarantee supplier uses it

The MCS certificate is a single document, created by your installation team from the MCS Installations Database, that proves your solar system was designed, installed and commissioned to MCS standards. It is what a supplier asks for before paying you for exported electricity, and it is far easier to get right in the first month than to recover years later.

Updated 25 September 2026 · written by the Clearline guidance team · 7 min read

13 dated sources, listed in full below Plain English, written to explain before anyone quotes Figures recomputed at every update, never recycled
Aerial view of a large red-brick community building with two separate solar arrays across its roofline

The short answer

Your MCS certificate proves the solar system on your roof was designed, installed and commissioned to industry recognised standards, using only MCS certified products, by an MCS certified installation team. Your installation team creates it, not MCS; it should reach you within days of commissioning, and it is what a supplier asks for when you apply for a Smart Export Guarantee tariff. Treat it as part of the value of the system, not admin.

This guide covers the certificate itself. For the scheme, read what MCS certification actually is; for vetting a firm, read how to check an MCS certificate is genuine.

One document, three conditions

MCS will only certify an installation commissioned by an MCS certified installation team, using an MCS certified product, with a commissioning date after 15 July 2009. Miss one and no certificate can exist. MCS also states a certificate is not a mandatory or legal requirement, which is why some cheap quotes quietly leave it out.

Who issues it and when it should arrive

MCS does not post certificates to homeowners. Every MCS installation must be registered on the MCS Installations Database, the MID, a central record of every MCS certified small scale low carbon installation in the UK, used by DESNZ and Ofgem to inform policy and regulation. Your installation team logs in and generates the certificate from it. Access is for certified installation teams, so you cannot search it yourself.

The timescale is short. MCS tells consumers the installation team is required to issue the certificate to you directly, and that this should be within 10 days of commissioning; its own guidance for installation teams says 10 working days, and teams on the redeveloped MCS scheme have a 30 day window. Late certificates can still be raised, but the installation team must give a reason and every late submission is recorded in the MID.

Ask for it at handover, not later

It normally arrives by email or in the handover pack. If nothing has come within a month of commissioning, chase the installation team in writing and quote the commissioning date. Do not wait for the export tariff application to find out.

What the certificate must show

MCS lists three things a certificate confirms: the type and model of the installed technology, the installation company and its certification details, and confirmation that the system complies with MCS Standards. Behind those sit the fields a supplier will ask you to read out.

Field on the certificateWhy it mattersWho can correct it
Address, postcode and MPAN
Ties the certificate to your property and supply
Your installation team, with MCS Helpdesk approval for an address change
Commissioning date
Starts the clock for the certificate and export eligibility
Your installation team, with commissioning paperwork and Helpdesk approval
DNC, EAG and TIC
Declared net capacity, estimated annual generation, total installed capacity
Your installation team, or MCS on the team's behalf with evidence
Product details
Confirms MCS certified panels, inverter or battery were used
Your installation team, or MCS with evidence
Meter make, model and serial
Matches the certificate to the meter the supplier reads
Your installation team, or MCS with evidence
Meter readings and Compliance Certificates
Recorded at commissioning
Cannot be amended by MCS

Source: MCS Certificate Queries and MCS's MID guidance for installation teams, accessed 18 August 2026.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

How the certificate is used for a Smart Export Guarantee tariff

The Smart Export Guarantee launched on 1 January 2020, after the Feed-in Tariff closed to new applicants from 1 April 2019. Suppliers set their own rate, contract length and terms; Ofgem's one floor is that the rate must be above zero, and payments come from export meter readings. You apply to a SEG licensee directly, and it need not be your import supplier.

Ofgem's guidance for generators says every application must show three things: the installation and the installation team are suitably certified, there is an export meter capable of half hourly readings, and there is an export MPAN, a 13 digit reference separate from your import MPAN. For solar PV up to 50kW both the installation and the installation team must be certified. That normally means an MCS certificate, although Ofgem recognises that other schemes may be equivalent to MCS, and suppliers such as Octopus Energy and British Gas name Flexi-Orb alongside it; a supplier that cannot see certification is not obliged to pay you.

In practice the certificate goes in with a small bundle. Octopus Energy asks for the MCS or Flexi-Orb certificate, a working smart meter and the DNO letter or email approving the export MPAN; it applies to the DNO for that MPAN itself and calls it the longest part of the process, which can take weeks. British Gas asks for the MCS, Flexi-Orb or accreditation certificate, G98 or G99 proof of grid connection, a smart meter recording export every 30 minutes and bank details; set up can take up to four weeks, and it pays every three months, within 28 days of your latest reading.

Rates move. On 18 August 2026 the published SEG rates at those two suppliers ran from 3p/kWh for non customers to 12p/kWh for households buying their import electricity from the same supplier, with conditions at the top end. See the export rates comparison and why the best export rates have conditions.

Step 1

Gather the DNO paperwork

The G98 notification or G99 approval and the DNO's response. Systems never notified to the DNO can add several weeks. See G98 versus G99.

Step 2

Complete the supplier's SEG form

Upload the certificate and DNO documents. Every supplier needs half hourly export readings from a smart meter; Octopus also wants a first reading and a photograph of the meter.

Step 3

Wait for the export MPAN

The supplier cannot pay until it can read the export meter. This is the slow part, so apply the day the certificate lands.

Step 4

Declare your Feed-in Tariff position

SEG export cannot be paid alongside FiT export payments; a FiT generation only arrangement is fine. Suppliers check the Central FIT Register.

If the certificate is missing or the installation team has gone

The first call is always the original installation team, for a first copy, a replacement or a correction. MCS will only generate a copy on the installation team's behalf if the installation team is no longer MCS certified or no longer trading, and only for the current system owner or their legal representative.

To find out whether a certificate exists at all, phone the MCS Customer Support Helpdesk on 0333 103 8130 with the technology type, the full installation address including postcode, and proof you live there: a utility bill or bank statement under three months old, a Council Tax letter or P45 or P60 under twelve months old, or a photo driving licence.

A copy from MCS costs £30 plus VAT, £36 in total, covering one copy with any number of amendments. MCS assesses your evidence, emails a PayPal payment request and provides the certificate within 10 working days of payment. Refunds can be requested within 14 days via mcshelpdesk@mcscertified.com.

What MCS cannot do

If a certified installation team used certified products but never raised a certificate, MCS says it is unable to help in raising a new one. There is no retrospective route, and MCS warns a copy certificate is no guarantee of access to any government incentive scheme. Buying a house with solar? Ask for the certificate before exchange.

One point on contact. From May 2026 the MCS Customer Insights team has been contacting selected homeowners to verify certificates, only from 0333 103 8198 or insights@mcscertified.com. Anyone else phoning about your MCS certificate, especially asking for money or bank details, is not MCS.

How to avoid delays

  • Get it in writing at quote stage that the job will be MCS certified and you will receive the certificate.
  • Check the address, MPAN, commissioning date, capacity figures and meter serial against your quote the day it arrives, and file it with the G98 or G99 documents and the DNO response.
  • Apply for the export tariff immediately; the export MPAN wait starts when the supplier applies to the DNO.
  • If you sell, hand the certificate to the buyer. The next owner inherits the export route only if the paperwork exists.

The certificate is easiest to get right before the deposit is paid. The free remote design call is where the paperwork gets checked before it becomes a problem, and nobody on the call sells you an installation.

Get my free quote →

Every system is installed and commissioned by our MCS-certified, fully insured installation teams, and our job is to check the paperwork, certificate included, before any money changes hands.

MCS, Ofgem, Octopus Energy and British Gas pages checked 18 August 2026. Supplier rates and requirements change; confirm with the supplier before you apply.

FAQs

MCS certificate questions, answered

Who issues the MCS certificate for solar panels?

Your installation team does, not MCS. The installation team registers the job on the MCS Installations Database and generates the certificate from it. MCS tells consumers it should be issued to you directly within 10 days of commissioning; teams on the redeveloped scheme have a 30 day window.

What does an MCS certificate show?

The type and model of technology installed, the installation company and its certification details, and confirmation the system complies with MCS Standards. It also carries your address, postcode and MPAN, the commissioning date, the declared net capacity, estimated annual generation and total installed capacity, the product details and the meter make, model and serial number.

Can I look up my MCS certificate online?

No. The MCS Installations Database is open to MCS certified installation teams, not the public. To check whether a certificate exists for your address, phone the MCS Customer Support Helpdesk on 0333 103 8130 with the technology type, the full address and proof that you live there.

How much does a copy of an MCS certificate cost?

If the installation team can still supply it, ask them first. If the installation team is no longer MCS certified or no longer trading, MCS will provide a copy to the current system owner or their legal representative for £30 plus VAT, £36 in total, within 10 working days of payment. Refunds can be requested within 14 days.

Do I need an MCS certificate to get Smart Export Guarantee payments?

For solar PV up to 50kW, Ofgem requires both the installation and the installation team to be suitably certified, and an MCS certificate is the standard evidence. Ofgem also recognises that other schemes may be equivalent to MCS, and suppliers such as Octopus Energy and British Gas accept Flexi-Orb. Without certification a supplier is not obliged to pay you, though a few choose to; Octopus Energy describes itself as one of the rare suppliers offering its export tariff without an MCS certificate.

My installation team went bust and never sent the certificate. What can I do?

It depends on whether the certificate was ever raised. If it exists on the MCS database, MCS can issue a copy because the team is no longer trading. If the team never created it, MCS says it cannot raise a new certificate for you, and there is no retrospective route. Phone the helpdesk first to find out which position you are in.

Can I keep my Feed-in Tariff and still join a SEG tariff?

You cannot claim SEG export payments while receiving FiT export payments. If your FiT arrangement covers generation only, a SEG export tariff can sit alongside it, and MCS notes that some suppliers let you keep your FiT tariff and sign on to their SEG export tariff. You will be asked to confirm your FiT export status on the application.

Figures and specifications in this guide are sourced below and were checked on the date shown. Rates and product specifications change; we confirm the current picture on your free design call.

Sources
  • MCS, MCS Certificate Queries: what the certificate is, the three conditions, 10 day issue, certificate fields, copy process, helpdesk, fee, proof of address mcscertified.com
  • MCS, MID guidance for installation teams: the MCS Installations Database, 10 working day duty, late submissions, amendable fields mcscertified.com
  • MCS Installation Database (MID) login homepage: installation-team access, helpdesk contact certificate.microgenerationcertification.org
  • MCS, Smart Export Guarantee consumer page: eligibility, certificate requested at sign up, Feed-in Tariff closure mcscertified.com
  • MCS, Smart Export Guarantee for installation teams mcscertified.com
  • MCS, Your Renewable Installation: Customer Insights verification contacts from May 2026 mcscertified.com
  • Ofgem, Smart Export Guarantee scheme page: launch date, eligible technologies, rates above zero, licensee terms ofgem.gov.uk
  • Ofgem, SEG Generators: applying to a SEG licensee, capacity limits ofgem.gov.uk
  • Ofgem, SEG Guidance for Generators landing page, published 12 December 2019 ofgem.gov.uk
  • Ofgem, SEG Guidance for Generators PDF, December 2019: certification, export meter and MPAN requirements, FIT interaction ofgem.gov.uk
  • Octopus Energy, Smart Export Guarantee tariff page: documents required, export MPAN process, rates on 18 August 2026 octopus.energy
  • Octopus Energy, FAQs about Outgoing Octopus: MCS certificate, DNO documents, meter types octopus.energy
  • British Gas, Smart Export Guarantee tariff: paperwork, set up time, payment cycle, rates on 18 August 2026 britishgas.co.uk
Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.