Solar panels in Abertillery, priced before anyone visits.
Twelve panels (6.36 kWp) here make about 6,020 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Abertillery roof makes, month by month
PVGIS puts Abertillery at 947 kWh per kWp a year, 5% below our Monmouthshire county estimate. 70% of it arrives between April and September, peaking in May.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 29.8 |
| February | 47.3 |
| March | 82.1 |
| April | 111 |
| May | 121 |
| June | 119 |
| July | 121 |
| August | 105 |
| September | 89.3 |
| October | 56.3 |
| November | 38 |
| December | 28.1 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 947, Abertillery is 2% above it.
How Abertillery compares
Small towns rarely get published solar figures, so here are the numbers for Abertillery. It is one of 16 Monmouthshire towns we track, and it ranks 15th of 16 for solar yield, a town of 10,337 people in the House of Commons Library settlement data. PVGIS gives its roofs 947 kWh per kWp a year, 2.59 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £857 of year one benefit, £247 of it from your own generation and £610 from export at 12p.
Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Abertillery's own yield.
Any planning application in Abertillery sits with Blaenau Gwent, and its official House of Commons Library settlement class is small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Abertillery at 51.73309, -3.13395 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
The network operator for Abertillery
Abertillery is served by National Grid Electricity Distribution (NGED): the town's centre falls inside its South Wales licence area on NESO's boundary map.
Most home systems stay within 3.68kW per phase of inverter output, which puts them on G98, a notification to NGED within 28 days of switch-on. Panel count does not decide it; the inverter and any battery do.
Larger systems go through G99 instead, applied for before installation. On timing: NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in Abertillery
A heat pump in Abertillery
Heating demand peaks when solar is weakest. In Abertillery, a 12-panel system makes about 180 kWh in December and 190 kWh in January, a fraction of its 770 kWh in May, which is why a heat pump here is costed on its tariff first.
Grant support in Wales comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Abertillery
Summer is where a car earns its place. In May, 12 panels in Abertillery make about 770 kWh, against roughly 70 kWh a typical home uses in daylight that month on our calculator's typical-use settings, so there is surplus a smart charger can put into the car instead of exporting it.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Abertillery
The same sourced benchmarks apply in Abertillery as everywhere we cover: honest repair pricing and what a service should include.
Solar in Abertillery: your questions answered
How much electricity do solar panels make in Abertillery?
About 6,020 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Abertillery: 947 kWh per kWp, or 2.59 peak sun hours a day on average. May is the strongest month, at about 770 kWh.
What does a typical solar system cost in Abertillery?
Solar is priced at £1,000 per kWp installed wherever you live, so a 12-panel, 6.36 kWp system costs £6,360 in Abertillery, exactly as it would anywhere else, before any battery. Location changes what the system makes, not what it costs: here that is about 6,020 kWh a year. The final figure comes from your roof on the design call.
Which DNO covers Abertillery, and what does it need from me?
National Grid Electricity Distribution (NGED) covers Abertillery. A home system of up to 3.68kW per phase is notified to NGED within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
What happens to the solar I do not use in Abertillery?
Around £610 a year at 12p per kWh, for the roughly 5,086 kWh a 12-panel system in Abertillery exports with typical use. Rates vary by supplier and some need their own tariff; the export rates table is dated and sourced.
How much solar does Abertillery get in December?
December is the low point: about 180 kWh from a 12-panel system in Abertillery, on PVGIS data, rising to 770 kWh in May. From November to February the same system makes about 910 kWh in total, which is why a battery charged off-peak does more of the work in winter.
How Abertillery compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Abertillery |
|---|---|---|
| Abertillery | 947 | this town |
| Abersychan | 958 | +11 kWh |
| Newbridge | 999 | +52 kWh |
| Pontypool | 993 | +46 kWh |
| Ebbw Vale | 945 | −2 kWh |
| Blackwood | 987 | +40 kWh |
| Bargod | 985 | +38 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for Abertillery: Solar panels in Abertillery from OVO Solar & Battery
Also near Abertillery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Abertillery
Sourced, dated and written by us. The same ground we cover on your free call.
What the January price cap means for solar, and what it does not
The whole-bill forecast is gas-led. What solar actually competes with is smaller, and mostly unpublished.
Read the guide →Does a standalone battery actually pay back?
No panels means one job: buy cheap, use later. The tariff decides whether it pays.
Read the guide →Three phase and EV charging: what actually changes
Three phase buys 22kW charging. Most cars cannot use it, and load balancing usually solves the real problem.
Read the guide →What MCS certification actually buys you on a heat pump job
The gate on the £7,500 grant, the design standard behind your running costs, and the noise sign-off.
Read the guide →Why the best export rates always carry conditions
The top export rates are acquisition offers. Here is how to price the condition.
Read the guide →HIES explained: what the badge actually protects, and when
What HIES protects: deposits up to 25 percent capped at 5,000 pounds, and your workmanship guarantee.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.