Solar panels in Bishop's Stortford, priced before anyone visits.
Twelve panels (6.36 kWp) here make about 6,580 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Bishop's Stortford roof makes, month by month
Bishop's Stortford's best month is July, at 125.9 kWh per kWp; December manages 35.6. Over the year that comes to 1,035 kWh per kWp, 2% above our Hertfordshire county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 38.9 |
| February | 53.2 |
| March | 89.5 |
| April | 117 |
| May | 124 |
| June | 125 |
| July | 126 |
| August | 113 |
| September | 98.8 |
| October | 68.3 |
| November | 47.2 |
| December | 35.6 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Bishop's Stortford makes 1,035 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Bishop's Stortford is 12% above it.
How Bishop's Stortford compares
Among the places we publish figures for, Bishop's Stortford is one of 27 Hertfordshire towns we track, and it ranks 1st of 27 for solar yield. It is a medium town in the House of Commons Library classification, with 44,071 residents, and its roofs see 2.84 peak sun hours a day across the year. That drives the standard 12 panel model to 6,583 kWh of generation, of which around 5,646 kWh is exported at 12p for £678 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
These are starting numbers, not a quote. The calculator below opens on Bishop's Stortford's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Any planning application in Bishop's Stortford sits with East Hertfordshire, and its official House of Commons Library settlement class is medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Bishop's Stortford at 51.86756, 0.15954 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
The network operator for Bishop's Stortford
On NESO's licence-area map, Bishop's Stortford is in East England, which UK Power Networks operates. That makes UK Power Networks the network operator for any system fitted here.
Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to UK Power Networks within 28 days of commissioning, with no prior approval.
Larger systems go through G99 instead, applied for before installation. On timing: Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Bishop's Stortford
A heat pump in Bishop's Stortford
In December, the darkest month here, 12 panels in Bishop's Stortford make about 230 kWh. That is when a heat pump runs hardest, so its running cost in Bishop's Stortford comes down to the tariff and the flow temperature rather than the roof.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Bishop's Stortford
Summer is where a car earns its place. In July, 12 panels in Bishop's Stortford make about 800 kWh, against roughly 70 kWh a typical home uses in daylight that month on our calculator's typical-use settings, so there is surplus a smart charger can put into the car instead of exporting it.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Bishop's Stortford
The same sourced benchmarks apply in Bishop's Stortford as everywhere we cover: honest repair pricing and what a service should include.
Common questions about solar in Bishop's Stortford
How much electricity do solar panels make in Bishop's Stortford?
About 6,580 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Bishop's Stortford: 1,035 kWh per kWp, or 2.84 peak sun hours a day on average. July is the strongest month, at about 800 kWh.
What does a typical solar system cost in Bishop's Stortford?
Solar is priced at £1,000 per kWp installed wherever you live, so a 12-panel, 6.36 kWp system costs £6,360 in Bishop's Stortford, exactly as it would anywhere else, before any battery. Location changes what the system makes, not what it costs: here that is about 6,580 kWh a year. The final figure comes from your roof on the design call.
Which DNO covers Bishop's Stortford, and what does it need from me?
UK Power Networks covers Bishop's Stortford. A home system of up to 3.68kW per phase is notified to UK Power Networks within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
What happens to the solar I do not use in Bishop's Stortford?
Around £678 a year at 12p per kWh, for the roughly 5,646 kWh a 12-panel system in Bishop's Stortford exports with typical use. Rates vary by supplier and some need their own tariff; the export rates table is dated and sourced.
How much solar does Bishop's Stortford get in December?
December is the low point: about 230 kWh from a 12-panel system in Bishop's Stortford, on PVGIS data, rising to 800 kWh in July. From November to February the same system makes about 1,110 kWh in total, which is why a battery charged off-peak does more of the work in winter.
How Bishop's Stortford compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Bishop's Stortford |
|---|---|---|
| Bishop's Stortford | 1,035 | this town |
| Stansted Mountfitchet | 1,028 | −7 kWh |
| Sawbridgeworth | 1,034 | −1 kWh |
| Harlow | 1,032 | −3 kWh |
| Great Dunmow | 1,055 | +20 kWh |
| Ware | 1,018 | −17 kWh |
| Buntingford | 1,026 | −9 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Bishop's Stortford: Solar panels in Bishop's Stortford from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Bishop's Stortford
Sourced, dated and written by us. The same ground we cover on your free call.
Best solar panels UK 2026: what the datasheets actually say
One pick per job, the specs behind each, and what moves payback more than the badge.
Read the guide →Tesla Powerwall 3 against the alternatives, and where each one wins
The strongest single box in the market, and the houses it is still wrong for.
Read the guide →Three phase and EV charging: what actually changes
Three phase buys 22kW charging. Most cars cannot use it, and load balancing usually solves the real problem.
Read the guide →Sizing a heat pump: what a proper survey covers
Sized by calculation, not by rule of thumb. What the survey covers, and what guessing costs.
Read the guide →What the Smart Export Guarantee actually is
The scheme obliges suppliers to pay above zero, and leaves the rate to them.
Read the guide →Your MCS certificate: what it shows, when it arrives, and how a Smart Export Guarantee supplier uses it
The document your export payments hang on. Who issues it, what it shows, and how to get a copy.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.