Solar panels in Burton upon Trent, designed on a free call.
A 12-panel roof in Burton upon Trent makes about 6,150 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Sunlight in Burton upon Trent, in numbers
Burton upon Trent's best month is May, at 119.3 kWh per kWp; December manages 33.1. Over the year that comes to 967 kWh per kWp, 2% above our Staffordshire county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 35.3 |
| February | 50.8 |
| March | 84.6 |
| April | 109 |
| May | 119 |
| June | 116 |
| July | 119 |
| August | 106 |
| September | 90.7 |
| October | 61.9 |
| November | 42.4 |
| December | 33.1 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 967, Burton upon Trent is 5% above it.
How Burton upon Trent compares
Burton upon Trent is one of 44 Staffordshire towns we track, and it ranks joint 4th of 44 for solar yield. The House of Commons Library settlement data classes it as a large town of 81,363 people. At 967 kWh per kWp a year, a typical 12 panel system here pays for itself in around 7.3 years on the 12p scenario: £872 of year one benefit against £6,360 installed, £247 of that benefit from cutting 26.32p imports with your own generation.
These are starting numbers, not a quote. The calculator below opens on Burton upon Trent's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Any planning application in Burton upon Trent sits with East Staffordshire, and its official House of Commons Library settlement class is large town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Burton upon Trent (52.80469, -1.64035), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
NGED and your Burton upon Trent connection
Burton upon Trent is served by National Grid Electricity Distribution (NGED): the town's centre falls inside its East Midlands licence area on NESO's boundary map.
Most home systems stay within 3.68kW per phase of inverter output, which puts them on G98, a notification to NGED within 28 days of switch-on. Panel count does not decide it; the inverter and any battery do.
Above that, G99 means applying before the work is booked. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Burton upon Trent
A heat pump in Burton upon Trent
Heating demand peaks when solar is weakest. In Burton upon Trent, a 12-panel system makes about 210 kWh in December and 220 kWh in January, a fraction of its 760 kWh in May, which is why a heat pump here is costed on its tariff first.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Burton upon Trent
Burton upon Trent's May output, about 760 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Burton upon Trent
If a system in Burton upon Trent is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.
Common questions about solar in Burton upon Trent
How much energy would 12 solar panels make in Burton upon Trent?
Burton upon Trent averages 2.65 peak sun hours a day, which PVGIS turns into 967 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 6,150 kWh, 68% of it between April and September.
Is solar more expensive in Burton upon Trent?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Burton upon Trent, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,150 kWh a year here, which is what drives payback.
Who is the network operator in Burton upon Trent, and do I need a G99 application?
The operator is National Grid Electricity Distribution (NGED). Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. Your design call checks which route yours needs.
What could I earn from exporting in Burton upon Trent?
On the 12p export scenario, a 12-panel system in Burton upon Trent sends about 5,213 kWh a year to the grid, worth around £626. The export rates table compares what each supplier pays.
How does solar perform in Burton upon Trent in the winter months?
December is the weakest month in Burton upon Trent: about 210 kWh from 12 panels, against 760 kWh in May. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.
How Burton upon Trent compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Burton upon Trent |
|---|---|---|
| Burton upon Trent | 967 | this town |
| Swadlincote | 971 | +4 kWh |
| Hilton | 967 | level |
| Woodville | 971 | +4 kWh |
| Ashby-de-la-Zouch | 982 | +15 kWh |
| Derby | 980 | +13 kWh |
| Lichfield | 973 | +6 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Burton upon Trent: Solar panels in Burton upon Trent from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Burton upon Trent
Sourced, dated and written by us. The same ground we cover on your free call.
Why your inverter is smaller than your panel array, and why that is correct
More panel capacity than inverter capacity is a deliberate design choice.
Read the guide →Tesla Powerwall 3 vs Duracell Dura16: which fits your home?
The two packages we actually price, compared on the numbers that decide it.
Read the guide →How time of use charging windows actually work
How a cheap overnight window is metered and billed, and what a battery does inside it.
Read the guide →Heat pump running costs versus a gas boiler, assumptions shown
Four numbers decide it: seasonal efficiency, flow temperature, tariff and heat demand.
Read the guide →Why tariff choice moves payback more than kit choice
Identical kit, five times the export income. The tariff decision worked through with August 2026 rates.
Read the guide →NAPIT, NICEIC and competent person schemes: who tells building control about your solar
Solar work is notifiable. A competent person scheme means your installation team notifies, not you.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.