Solar panels in Durrington and Bulford.
Twelve panels here make about 6,650 kWh a year for £6,360 installed, designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Sunlight in Durrington and Bulford, in numbers
PVGIS puts Durrington and Bulford at 1,045 kWh per kWp a year, 1% above our Wiltshire county estimate. 67% of it arrives between April and September, peaking in May.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 41 |
| February | 54.6 |
| March | 92.9 |
| April | 119 |
| May | 127 |
| June | 124 |
| July | 126 |
| August | 111 |
| September | 97.8 |
| October | 67.5 |
| November | 48 |
| December | 36.9 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Durrington and Bulford makes 1,045 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Durrington and Bulford is 13% above it.
How Durrington and Bulford compares
Small towns rarely get published solar figures, so here are the numbers for Durrington and Bulford. It is one of 20 Wiltshire towns we track, and it ranks 2nd of 20 for solar yield, a town of 9,585 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,045 kWh per kWp a year, 2.86 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £932 of year one benefit, £247 of it from your own generation and £685 from export at 12p.
Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Durrington and Bulford's own yield.
Planning applications here go through Wiltshire; nationally, the House of Commons Library classes Durrington and Bulford as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Durrington and Bulford (51.19473, -1.75469), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
The network operator for Durrington and Bulford
Scottish and Southern Electricity Networks (SSEN) owns and runs the local electricity network in Durrington and Bulford, as part of its Southern England licence area.
For a typical home the paperwork is light: a system of up to 3.68kW per phase goes through G98, which means SSEN is notified within 28 days of switch-on rather than asked beforehand.
Above that, G99 means applying before the work is booked. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.
Sources: NESO DNO licence areas (3 May 2024); SSEN, micro-generation connections page, checked 25 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in Durrington and Bulford
A heat pump in Durrington and Bulford
Heating demand peaks when solar is weakest. In Durrington and Bulford, a 12-panel system makes about 230 kWh in December and 260 kWh in January, a fraction of its 810 kWh in May, which is why a heat pump here is costed on its tariff first.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Durrington and Bulford
Durrington and Bulford's May output, about 810 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Durrington and Bulford
If a system in Durrington and Bulford is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.
Solar in Durrington and Bulford: your questions answered
How much energy would 12 solar panels make in Durrington and Bulford?
Durrington and Bulford averages 2.86 peak sun hours a day, which PVGIS turns into 1,045 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 6,650 kWh, 67% of it between April and September.
Is solar more expensive in Durrington and Bulford?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Durrington and Bulford, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,650 kWh a year here, which is what drives payback.
Who is the network operator in Durrington and Bulford, and do I need a G99 application?
The operator is Scottish and Southern Electricity Networks (SSEN). Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW. Your design call checks which route yours needs.
What could I earn from exporting in Durrington and Bulford?
On the 12p export scenario, a 12-panel system in Durrington and Bulford sends about 5,710 kWh a year to the grid, worth around £685. The export rates table compares what each supplier pays.
How does solar perform in Durrington and Bulford in the winter months?
December is the weakest month in Durrington and Bulford: about 230 kWh from 12 panels, against 810 kWh in May. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.
How Durrington and Bulford compares with its neighbours
The six closest towns we publish, run through the identical PVGIS query as Durrington and Bulford.
| Town | kWh per kWp a year | vs Durrington and Bulford |
|---|---|---|
| Durrington and Bulford | 1,045 | this town |
| Amesbury | 1,044 | −1 kWh |
| Tidworth | 1,044 | −1 kWh |
| Salisbury | 1,056 | +11 kWh |
| Andover | 1,037 | −8 kWh |
| Devizes | 1,025 | −20 kWh |
| Marlborough | 1,017 | −28 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also for Durrington and Bulford: Solar panels in Durrington and Bulford from OVO Solar & Battery
Also near Durrington and Bulford
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Guides worth reading before your call
Sourced, dated and written by us. The same ground we cover on your free call.
What the January price cap means for solar, and what it does not
The whole-bill forecast is gas-led. What solar actually competes with is smaller, and mostly unpublished.
Read the guide →Which battery size band does your home fall into?
Where UK homes actually land, why oversizing costs you, and what shifts the band.
Read the guide →How time of use charging windows actually work
How a cheap overnight window is metered and billed, and what a battery does inside it.
Read the guide →What are the disadvantages of a heat pump? Six honest ones
Six real disadvantages, worth planning around rather than a reason to rule one out.
Read the guide →Why the best export rates always carry conditions
The top export rates are acquisition offers. Here is how to price the condition.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.