Solar panels in Stevenston, designed on a free call.
A 12-panel roof in Stevenston makes about 5,630 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Sunlight in Stevenston, in numbers
PVGIS puts Stevenston at 886 kWh per kWp a year, 4% above our Ayrshire county estimate. 73% of it arrives between April and September, peaking in May.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 22.2 |
| February | 42.5 |
| March | 74.2 |
| April | 109 |
| May | 128 |
| June | 117 |
| July | 117 |
| August | 102 |
| September | 75.2 |
| October | 51.4 |
| November | 29.8 |
| December | 18.9 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 886 kWh per kWp in Stevenston against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Stevenston 4% below it.
How Stevenston compares
Small towns rarely get published solar figures, so here are the numbers for Stevenston. It is one of 11 Ayrshire towns we track, and it ranks 7th of 11 for solar yield, a town of 8,608 people in the House of Commons Library settlement data. PVGIS gives its roofs 886 kWh per kWp a year, 2.43 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £811 of year one benefit, £247 of it from your own generation and £564 from export at 12p.
Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Stevenston's own yield.
Planning applications here go through North Ayrshire; nationally, the House of Commons Library classes Stevenston as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Stevenston (55.64067, -4.75712), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
SP Energy Networks and your Stevenston connection
SP Energy Networks owns and runs the local electricity network in Stevenston, as part of its South and Central Scotland licence area.
What decides the paperwork is the inverter and battery output, not the number of panels. Up to 3.68kW per phase, a system follows G98: SP Energy Networks is notified within 28 days of commissioning and nothing has to be approved first.
Above that, G99 means applying before the work is booked. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in Stevenston
A heat pump in Stevenston
Heating demand peaks when solar is weakest. In Stevenston, a 12-panel system makes about 120 kWh in December and 140 kWh in January, a fraction of its 810 kWh in May, which is why a heat pump here is costed on its tariff first.
In Scotland, Home Energy Scotland offers a grant of up to £7,500 towards a heat pump, an optional interest-free loan of up to £7,500 on top, and £1,500 more for rural and island homes (Home Energy Scotland, checked 28 September 2026).
Charging an EV in Stevenston
Stevenston's May output, about 810 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Stevenston
If a system in Stevenston is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.
Solar in Stevenston: your questions answered
How much energy would 12 solar panels make in Stevenston?
Stevenston averages 2.43 peak sun hours a day, which PVGIS turns into 886 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 5,630 kWh, 73% of it between April and September.
Is solar more expensive in Stevenston?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Stevenston, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 5,630 kWh a year here, which is what drives payback.
Who is the network operator in Stevenston, and do I need a G99 application?
The operator is SP Energy Networks. Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator. Your design call checks which route yours needs.
What could I earn from exporting in Stevenston?
On the 12p export scenario, a 12-panel system in Stevenston sends about 4,698 kWh a year to the grid, worth around £564. The export rates table compares what each supplier pays.
How does solar perform in Stevenston in the winter months?
December is the weakest month in Stevenston: about 120 kWh from 12 panels, against 810 kWh in May. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.
How Stevenston compares with its neighbours
The six closest towns we publish, run through the identical PVGIS query as Stevenston.
| Town | kWh per kWp a year | vs Stevenston |
|---|---|---|
| Stevenston | 886 | this town |
| Saltcoats | 885 | −1 kWh |
| Ardrossan | 885 | −1 kWh |
| Kilwinning | 912 | +26 kWh |
| Irvine | 902 | +16 kWh |
| Troon | 906 | +20 kWh |
| Kilmarnock | 888 | +2 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also for Stevenston: Solar panels in Stevenston from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Guides worth reading before your call
Sourced, dated and written by us. The same ground we cover on your free call.
Back contact solar panels, explained for a UK roof
What back contact changes on a roof, compared fairly with TOPCon, with the makers' own claims labelled.
Read the guide →Does a standalone battery actually pay back?
No panels means one job: buy cheap, use later. The tariff decides whether it pays.
Read the guide →Charging an EV from your own solar
Every surplus kWh is 3.6 to 5 miles. Whether that beats a 7p overnight rate is arithmetic.
Read the guide →Do you need to replace your radiators for a heat pump?
Some change, most do not. The room by room arithmetic that decides which.
Read the guide →Why tariff choice moves payback more than kit choice
Identical kit, five times the export income. The tariff decision worked through with August 2026 rates.
Read the guide →NAPIT, NICEIC and competent person schemes: who tells building control about your solar
Solar work is notifiable. A competent person scheme means your installation team notifies, not you.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.