0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Leicestershire

Solar panels in Thurmaston, priced before anyone visits.

About 6,260 kWh a year from 12 panels in Thurmaston, £6,360 installed, with your system designed on a free 30-minute video call.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Thurmaston

Sunlight in Thurmaston, in numbers

Thurmaston's best month is July, at 121.1 kWh per kWp; December manages 35.3. Over the year that comes to 985 kWh per kWp, level with our Leicestershire county estimate.

Map showing Thurmaston in Leicestershire A simplified outline map of Leicestershire with neighbouring counties shown faintly, and a pin marking the location of Thurmaston.
Thurmaston in Leicestershire

Generation per kWp, month by month

Thurmaston, 985 kWh per kWp a year
Thurmaston, monthly generation per kWp Bar chart, twelve months January to December. Peak July at 121 kWh/kWp. Lowest December at 35.3 kWh/kWp. Full values are in the table below this chart. 139 0 JFMAMJJASOND 121
Show the monthly figures
Thurmaston, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January35.8
February50.7
March84.7
April111
May120
June117
July121
August109
September92.9
October63
November44.2
December35.3

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

6,260kWh a year, 12 panels
770kWh in July, the peak
220kWh in December

Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 985, Thurmaston is 6% above it.

How Thurmaston compares

Small towns rarely get published solar figures, so here are the numbers for Thurmaston. It is one of 26 Leicestershire towns we track, and it ranks joint 19th of 26 for solar yield, a town of 9,749 people in the House of Commons Library settlement data. PVGIS gives its roofs 985 kWh per kWp a year, 2.70 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £886 of year one benefit, £247 of it from your own generation and £639 from export at 12p.

Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Thurmaston's own yield.

Any planning application in Thurmaston sits with Charnwood, and its official House of Commons Library settlement class is small town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£886
£74 a month · payback 7.2 yrs
System price, installed
£6,360
Simple payback
7.2 yrs
Generates a year
6,265 kWh
Exported
5,328 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Generation is modelled from PVGIS satellite data for Thurmaston's own coordinates (52.67769, -1.0931), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.

Local grid

The network operator for Thurmaston

National Grid Electricity Distribution (NGED) owns and runs the local electricity network in Thurmaston, as part of its East Midlands licence area.

For a typical home the paperwork is light: a system of up to 3.68kW per phase goes through G98, which means NGED is notified within 28 days of switch-on rather than asked beforehand.

Larger systems go through G99 instead, applied for before installation. On timing: NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.

Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Wide aerial view of a UK new-build housing estate with several homes already fitted with solar panels
A new-build estate where solar is already spreading, roof by roof.
Beyond solar

Beyond the panels: heating and car charging in Thurmaston

A heat pump in Thurmaston

In December, the darkest month here, 12 panels in Thurmaston make about 220 kWh. That is when a heat pump runs hardest, so its running cost in Thurmaston comes down to the tariff and the flow temperature rather than the roof.

The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in Thurmaston

Summer is where a car earns its place. In July, 12 panels in Thurmaston make about 770 kWh, against roughly 70 kWh a typical home uses in daylight that month on our calculator's typical-use settings, so there is surplus a smart charger can put into the car instead of exporting it.

If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.

EV charging explained

Already got panels?

Solar panel servicing and repair in Thurmaston

The same sourced benchmarks apply in Thurmaston as everywhere we cover: honest repair pricing and what a service should include.

FAQs

Common questions about solar in Thurmaston

How much electricity do solar panels make in Thurmaston?

About 6,260 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Thurmaston: 985 kWh per kWp, or 2.70 peak sun hours a day on average. July is the strongest month, at about 770 kWh.

What does a typical solar system cost in Thurmaston?

Solar is priced at £1,000 per kWp installed wherever you live, so a 12-panel, 6.36 kWp system costs £6,360 in Thurmaston, exactly as it would anywhere else, before any battery. Location changes what the system makes, not what it costs: here that is about 6,260 kWh a year. The final figure comes from your roof on the design call.

Which DNO covers Thurmaston, and what does it need from me?

National Grid Electricity Distribution (NGED) covers Thurmaston. A home system of up to 3.68kW per phase is notified to NGED within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.

What happens to the solar I do not use in Thurmaston?

Around £639 a year at 12p per kWh, for the roughly 5,328 kWh a 12-panel system in Thurmaston exports with typical use. Rates vary by supplier and some need their own tariff; the export rates table is dated and sourced.

How much solar does Thurmaston get in December?

December is the low point: about 220 kWh from a 12-panel system in Thurmaston, on PVGIS data, rising to 770 kWh in July. From November to February the same system makes about 1,060 kWh in total, which is why a battery charged off-peak does more of the work in winter.

How Thurmaston compares with its neighbours

The six closest towns we publish, run through the identical PVGIS query as Thurmaston.

TownkWh per kWp a yearvs Thurmaston
Thurmaston985this town
Birstall981−4 kWh
Syston985level
Leicester994+9 kWh
Mountsorrel978−7 kWh
Sileby978−7 kWh
Oadby1,005+20 kWh

Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.

All of Leicestershire

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Thurmaston. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.