0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Wigtownshire, Scotland

Solar and batteries in Wigtownshire, sized to your roof.

A 12-panel roof in Wigtownshire makes about 6,150 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Wigtownshire

Wigtownshire's solar year

From 23.7 kWh per kWp in December to 133.3 in May: a roof in Wigtownshire makes 5.6 times as much in its best month as in its darkest, and 967 kWh per kWp across the year.

Map showing Wigtownshire A simplified outline map of Wigtownshire with neighbouring counties shown faintly, and a pin marking the location of Wigtownshire.
Wigtownshire

Generation per kWp, month by month

Wigtownshire, 967 kWh per kWp a year
Wigtownshire, monthly generation per kWp Bar chart, twelve months January to December. Peak May at 133 kWh/kWp. Lowest December at 23.7 kWh/kWp. Full values are in the table below this chart. 153 0 JFMAMJJASOND 133
Show the monthly figures
Wigtownshire, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January26.3
February48.9
March84.6
April117
May133
June127
July124
August109
September82.8
October56.5
November35.1
December23.7

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

6,150kWh a year, 12 panels
850kWh in May, the peak
150kWh in December

Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 967, Wigtownshire is 5% above it.

How Wigtownshire compares

Wigtownshire ranks 33rd of the 85 counties we track for solar yield, 15% above the Scotland average of our estimates. At 2.65 peak sun hours a day the sums lean on a healthy mix: £247 of the year one benefit here comes from solar you use yourself, with export at 12p adding £626.

Every figure here assumes a clear, south-facing roof at 35 degrees in the middle of Wigtownshire. Yours will differ; the calculator below lets you test panels, batteries and export rates first.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£872
£73 a month · payback 7.3 yrs
System price, installed
£6,360
Simple payback
7.3 yrs
Generates a year
6,150 kWh
Exported
5,213 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Generation from PVGIS v5.2 (European Commission JRC, SARAH3), retrieved August 2026 for a representative point in Wigtownshire (54.8844, -4.7467), assuming 1 kWp, 14% system loss, 35 degree pitch, due south. Import valued at 26.32p/kWh (Ofgem price cap average, Oct to Dec 2026); off-peak charging at 8.5p/kWh where used (a supplier's published off-peak rate, checked September 2026); export at the scenario you pick, from the dated tariff table. Prices are installed pricing, August 2026, standard installations; 530W LONGi panels at £1,000 per kWp. Estimates for illustration, not a quote: your free design call prices your actual roof.

Local grid

Who runs the grid in Wigtownshire

On NESO's licence-area map, the middle of Wigtownshire falls in South and Central Scotland, which SP Energy Networks operates, and so do all the towns we cover in the county.

Most home systems stay within 3.68kW per phase of inverter output, which puts them on G98, a notification to SP Energy Networks within 28 days of switch-on. Panel count does not decide it; the inverter and any battery do.

A bigger inverter or battery output needs a G99 application in advance. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator.

Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

A stone-built UK bungalow with a full all-black solar panel array across the roof pitch
An all-black panel array fitted flush across a stone bungalow's roof.
Beyond solar

Beyond the panels: heating and car charging in Wigtownshire

A heat pump in Wigtownshire

A heat pump does most of its work from November to February. Over those four months, 12 panels in Wigtownshire make about 850 kWh, against 3,130 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.

Scottish homes apply through Home Energy Scotland rather than the Boiler Upgrade Scheme: up to £7,500 in grant for a heat pump, up to £7,500 more as an optional interest-free loan, and a £1,500 uplift for rural and island homes (checked 28 September 2026).

How heat pumps work

Charging an EV in Wigtownshire

From April to September, 72% of a Wigtownshire roof's yearly output arrives, peaking at about 850 kWh in May on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.

If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.

EV charging explained

FAQs

Solar in Wigtownshire: your questions answered

What does a solar panel system produce in Wigtownshire?

Each kWp of panels in Wigtownshire makes 967 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,150 kWh, from about 150 kWh in December up to 850 kWh in May.

What would 12 solar panels cost in Wigtownshire?

£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Wigtownshire differs is output: about 6,150 kWh a year from that system.

Would a system in Wigtownshire need approval from the network operator?

Wigtownshire is on SP Energy Networks' network (South and Central Scotland licence area). Systems up to 3.68kW per phase of inverter output follow G98: SP Energy Networks is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator. Our G98 vs G99 guide explains both routes.

How much would export pay on a system in Wigtownshire?

It is exported. With typical use and no battery, about 5,213 kWh of the 6,150 kWh a 12-panel system makes in Wigtownshire goes to the grid, around £626 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.

Is solar worth it in Wigtownshire in winter?

It works, but the year is lopsided. 72% of a Wigtownshire roof's output lands between April and September; the four months from November to February give about 850 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.

Towns we cover in Wigtownshire

One Wigtownshire town has its own page so far, with a yield worked out for its own centroid.

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Wigtownshire. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.