Solar panels in Stranraer, sized to your roof.
A 12-panel roof in Stranraer makes about 6,430 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in Stranraer can generate
PVGIS puts Stranraer at 1,011 kWh per kWp a year, 5% above our Wigtownshire county estimate. 72% of it arrives between April and September, peaking in May.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 27.6 |
| February | 50.5 |
| March | 87.6 |
| April | 122 |
| May | 138 |
| June | 132 |
| July | 129 |
| August | 117 |
| September | 88.6 |
| October | 59.2 |
| November | 36 |
| December | 23.6 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 1,011, Stranraer is 9% above it.
How Stranraer compares
Small towns rarely get published solar figures, so here are the numbers for Stranraer. It is the only Wigtownshire town we track so far, with county rankings to follow as its neighbours land, a town of 9,642 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,011 kWh per kWp a year, 2.77 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £906 of year one benefit, £247 of it from your own generation and £659 from export at 12p.
These are starting numbers, not a quote. The calculator below opens on Stranraer's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Stranraer sits within Dumfries and Galloway, its local planning authority, and the House of Commons Library classes it as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Stranraer (54.90364, -5.02758), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
Connecting solar to the Stranraer network
Stranraer sits in SP Energy Networks' South and Central Scotland licence area, so SP Energy Networks is the network operator (DNO) any solar panels or battery here are registered with.
Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to SP Energy Networks within 28 days of commissioning, with no prior approval.
Anything bigger is a G99 case and is applied for first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Stranraer
A heat pump in Stranraer
Solar and a heat pump pull in opposite directions through the year: Stranraer's roofs make 880 kWh from November to February on a 12-panel system, and 3,280 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
Scottish homes apply through Home Energy Scotland rather than the Boiler Upgrade Scheme: up to £7,500 in grant for a heat pump, up to £7,500 more as an optional interest-free loan, and a £1,500 uplift for rural and island homes (checked 28 September 2026).
Charging an EV in Stranraer
A 12-panel roof in Stranraer makes about 880 kWh in May. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Stranraer
Guidance is nationwide, so the benchmarks hold in Stranraer: repair costs, service scope, and when the inverter is the real fault.
Stranraer solar questions
What could a roof in Stranraer generate?
PVGIS puts a roof in Stranraer at 1,011 kWh per kWp a year, 2.77 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,430 kWh a year, most of it between April and September.
How much are solar panels in Stranraer?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Stranraer before a battery. What Stranraer changes is the return, about 6,430 kWh a year from that system, and your design call prices your actual roof.
Do I need permission from the DNO for solar in Stranraer?
Usually not in advance. SP Energy Networks, the network operator for Stranraer, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator. "See our DNO explainer.
How much can I earn from exporting solar in Stranraer?
With typical use and no battery, a 12-panel system in Stranraer exports about 5,493 kWh a year. At 12p per kWh that is roughly £659; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Do solar panels work in winter in Stranraer?
Yes, at a lower level. PVGIS gives Stranraer 23.6 kWh per kWp in December and 27.6 in January, so a 12-panel system makes about 150 kWh and 180 kWh in those months, against 880 kWh in May. Winter output mostly covers daytime use rather than exporting.
How Stranraer compares with its neighbours
How the towns nearest Stranraer compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Stranraer |
|---|---|---|
| Stranraer | 1,011 | this town |
| Ayr | 899 | −112 kWh |
| Stewarton | 941 | −70 kWh |
| Prestwick | 900 | −111 kWh |
| Troon | 906 | −105 kWh |
| Cumnock | 838 | −173 kWh |
| Irvine | 902 | −109 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also for Stranraer: Solar panels in Stranraer from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Stranraer homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
How long does a solar inverter last, and when does replacing it make sense?
The one component you should expect to replace, and the decision tree when it goes.
Read the guide →Sigenergy SigenStor review: the 5-in-1 tower examined
The 5-in-1 tower reviewed by a site that does not sell it, warranty arithmetic included.
Read the guide →Three phase and EV charging: what actually changes
Three phase buys 22kW charging. Most cars cannot use it, and load balancing usually solves the real problem.
Read the guide →Which homes suit a heat pump, and which need work first
The trial data says no property type is unsuitable. Design quality decides the outcome.
Read the guide →What the Smart Export Guarantee actually is
The scheme obliges suppliers to pay above zero, and leaves the rate to them.
Read the guide →What MCS certification actually is, and why your export payments depend on it
The badge that decides whether your solar earns export payments. It cannot be added later.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.