0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Glamorgan

Solar panels in Aberdare, with the numbers shown.

About 5,980 kWh a year from 12 panels in Aberdare, £6,360 installed, with your system designed on a free 30-minute video call.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Aberdare

What a roof in Aberdare can generate

Aberdare's best month is May, at 119.9 kWh per kWp; December manages 27.8. Over the year that comes to 940 kWh per kWp, level with our Glamorgan county estimate.

Map showing Aberdare in Glamorgan A simplified outline map of Glamorgan with neighbouring counties shown faintly, and a pin marking the location of Aberdare.
Aberdare in Glamorgan

Generation per kWp, month by month

Aberdare, 940 kWh per kWp a year
Aberdare, monthly generation per kWp Bar chart, twelve months January to December. Peak May at 120 kWh/kWp. Lowest December at 27.8 kWh/kWp. Full values are in the table below this chart. 138 0 JFMAMJJASOND 120
Show the monthly figures
Aberdare, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January31.2
February48.8
March85.9
April111
May120
June115
July115
August100
September88.8
October57
November39.1
December27.8

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

5,980kWh a year, 12 panels
760kWh in May, the peak
180kWh in December

For scale: 940 kWh per kWp in Aberdare against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Aberdare 2% above it.

How Aberdare compares

Among the places we publish figures for, Aberdare is one of 32 Glamorgan towns we track, and it ranks 29th of 32 for solar yield. It is a medium town in the House of Commons Library classification, with 38,502 residents, and its roofs see 2.57 peak sun hours a day across the year. That drives the standard 12 panel model to 5,978 kWh of generation, of which around 5,042 kWh is exported at 12p for £605 a year, with £247 saved on electricity you would otherwise buy at 26.32p.

Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Aberdare's own yield.

Aberdare sits within Rhondda Cynon Taf, its local planning authority, and the House of Commons Library classes it as a medium town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£852
£71 a month · payback 7.5 yrs
System price, installed
£6,360
Simple payback
7.5 yrs
Generates a year
5,978 kWh
Exported
5,042 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

The figures use PVGIS for the centre of Aberdare (51.7154, -3.45216), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.

Local grid

Connecting solar to the Aberdare network

Aberdare sits in National Grid Electricity Distribution's South Wales licence area, so NGED is the network operator (DNO) any solar panels or battery here are registered with.

Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to NGED within 28 days of commissioning, with no prior approval.

Anything bigger is a G99 case and is applied for first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.

Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Aerial view of a large flat-roof solar array of around ninety panels on a modern brick home
A flat-roof array of around 90 panels, fitted for a large modern home.
Beyond solar

Beyond the panels: heating and car charging in Aberdare

A heat pump in Aberdare

Solar and a heat pump pull in opposite directions through the year: Aberdare's roofs make 930 kWh from November to February on a 12-panel system, and 2,860 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.

The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in Aberdare

From April to September, 69% of a Aberdare roof's yearly output arrives, peaking at about 760 kWh in May on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.

The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).

EV charging explained

FAQs

Solar in Aberdare: your questions answered

What could a roof in Aberdare generate?

PVGIS puts a roof in Aberdare at 940 kWh per kWp a year, 2.57 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 5,980 kWh a year, most of it between April and September.

What would 12 solar panels cost in Aberdare?

£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Aberdare differs is output: about 5,980 kWh a year from that system.

Do I need permission from the DNO for solar in Aberdare?

Usually not in advance. NGED, the network operator for Aberdare, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. "See our DNO explainer.

How much would export pay on a system in Aberdare?

It is exported. With typical use and no battery, about 5,042 kWh of the 5,980 kWh a 12-panel system makes in Aberdare goes to the grid, around £605 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.

Do solar panels work in winter in Aberdare?

Yes, at a lower level. PVGIS gives Aberdare 27.8 kWh per kWp in December and 31.2 in January, so a 12-panel system makes about 180 kWh and 200 kWh in those months, against 760 kWh in May. Winter output mostly covers daytime use rather than exporting.

How Aberdare compares with its neighbours

The six closest towns we publish, run through the identical PVGIS query as Aberdare.

TownkWh per kWp a yearvs Aberdare
Aberdare940this town
Mountain Ash948+8 kWh
Merthyr Tydfil942+2 kWh
Treorchy925−15 kWh
Rhondda882−58 kWh
Tonypandy956+16 kWh
Porth961+21 kWh

PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.

Also for Aberdare: Solar panels in Aberdare from OVO Solar & Battery

All of Glamorgan

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Aberdare. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.