Solar panels in Aldridge, with the numbers shown.

A 12-panel roof in Aldridge makes about 6,080 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Aldridge

What a roof in Aldridge can generate

PVGIS puts Aldridge at 956 kWh per kWp a year, 1% above our Staffordshire county estimate. 68% of it arrives between April and September, peaking in July.

Map showing Aldridge in Staffordshire A simplified outline map of Staffordshire with neighbouring counties shown faintly, and a pin marking the location of Aldridge.
Aldridge in Staffordshire

Generation per kWp, month by month

Aldridge, 956 kWh per kWp a year
Aldridge, monthly generation per kWp Bar chart, twelve months January to December. Peak July at 118 kWh/kWp. Lowest December at 34.5 kWh/kWp. Full values are in the table below this chart. 136 0 JFMAMJJASOND 118
Show the monthly figures
Aldridge, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January35.6
February50.4
March84.7
April107
May117
June114
July118
August104
September89.7
October60.5
November41.5
December34.5

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

6,080kWh a year, 12 panels
750kWh in July, the peak
220kWh in December

For scale: 956 kWh per kWp in Aldridge against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Aldridge 3% above it.

How Aldridge compares

Small towns rarely get published solar figures, so here are the numbers for Aldridge. It is one of 44 Staffordshire towns we track, and it ranks joint 25th of 44 for solar yield, a town of 15,780 people in the House of Commons Library settlement data. PVGIS gives its roofs 956 kWh per kWp a year, 2.62 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £864 of year one benefit, £247 of it from your own generation and £617 from export at 12p.

These are starting numbers, not a quote. The calculator below opens on Aldridge's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.

Aldridge sits within Walsall, its local planning authority, and the House of Commons Library classes it as a small town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£864
£72 a month · payback 7.4 yrs
System price, installed
£6,360
Simple payback
7.4 yrs
Generates a year
6,080 kWh
Exported
5,143 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Generation is modelled from PVGIS satellite data for Aldridge's own coordinates (52.60574, -1.92291), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.

Local grid

Connecting solar to the Aldridge network

Aldridge sits in National Grid Electricity Distribution's West Midlands licence area, so NGED is the network operator (DNO) any solar panels or battery here are registered with.

Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to NGED within 28 days of commissioning, with no prior approval.

Anything bigger is a G99 case and is applied for first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.

Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Aerial view of a residential UK street where several homes have black solar panels fitted to rear roof pitches
Several homes on the same street, all now fitted with solar.
Beyond solar

Adding a heat pump or an EV charger in Aldridge

A heat pump in Aldridge

Solar and a heat pump pull in opposite directions through the year: Aldridge's roofs make 1,030 kWh from November to February on a 12-panel system, and 2,880 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.

In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in Aldridge

From April to September, 68% of a Aldridge roof's yearly output arrives, peaking at about 750 kWh in July on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.

Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.

EV charging explained

FAQs

Aldridge solar questions

What could a roof in Aldridge generate?

PVGIS puts a roof in Aldridge at 956 kWh per kWp a year, 2.62 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,080 kWh a year, most of it between April and September.

How much are solar panels in Aldridge?

The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Aldridge before a battery. What Aldridge changes is the return, about 6,080 kWh a year from that system, and your design call prices your actual roof.

Do I need permission from the DNO for solar in Aldridge?

Usually not in advance. NGED, the network operator for Aldridge, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. "See our DNO explainer.

How much can I earn from exporting solar in Aldridge?

With typical use and no battery, a 12-panel system in Aldridge exports about 5,143 kWh a year. At 12p per kWh that is roughly £617; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.

Do solar panels work in winter in Aldridge?

Yes, at a lower level. PVGIS gives Aldridge 34.5 kWh per kWp in December and 35.6 in January, so a 12-panel system makes about 220 kWh and 230 kWh in those months, against 750 kWh in July. Winter output mostly covers daytime use rather than exporting.

How Aldridge compares with its neighbours

Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.

TownkWh per kWp a yearvs Aldridge
Aldridge956this town
Rushall and Shelfield958+2 kWh
Streetly965+9 kWh
Brownhills957+1 kWh
Pelsall958+2 kWh
Walsall966+10 kWh
Bloxwich958+2 kWh

Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.

All of Staffordshire

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Aldridge. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.