Solar panels in Beeston, sized to your roof.
About 6,250 kWh a year from 12 panels in Beeston, £6,360 installed, with your system designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in Beeston can generate
From 34.3 kWh per kWp in December to 121.8 in May: a roof in Beeston makes 3.6 times as much in its best month as in its darkest, and 983 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 35.7 |
| February | 51.4 |
| March | 85.5 |
| April | 111 |
| May | 122 |
| June | 116 |
| July | 121 |
| August | 109 |
| September | 91.3 |
| October | 62.1 |
| November | 43.5 |
| December | 34.3 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Beeston makes 983 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Beeston is 6% above it.
How Beeston compares
Among the places we publish figures for, Beeston is one of 29 Nottinghamshire towns we track, and it ranks joint 13th of 29 for solar yield. It is a medium town in the House of Commons Library classification, with 54,542 residents, and its roofs see 2.69 peak sun hours a day across the year. That drives the standard 12 panel model to 6,252 kWh of generation, of which around 5,315 kWh is exported at 12p for £638 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Beeston's own yield.
Beeston sits within Broxtowe, its local planning authority, and the House of Commons Library classes it as a medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Beeston (52.92266, -1.23363), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
Connecting solar to the Beeston network
Beeston sits in National Grid Electricity Distribution's East Midlands licence area, so NGED is the network operator (DNO) any solar panels or battery here are registered with.
G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, NGED only has to be told within 28 days after the system is commissioned.
A bigger inverter or battery output needs a G99 application in advance. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in Beeston
A heat pump in Beeston
Solar and a heat pump pull in opposite directions through the year: Beeston's roofs make 1,050 kWh from November to February on a 12-panel system, and 2,980 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).
Charging an EV in Beeston
A 12-panel roof in Beeston makes about 770 kWh in May. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Beeston
Guidance is nationwide, so the benchmarks hold in Beeston: repair costs, service scope, and when the inverter is the real fault.
Solar in Beeston: your questions answered
What could a roof in Beeston generate?
PVGIS puts a roof in Beeston at 983 kWh per kWp a year, 2.69 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,250 kWh a year, most of it between April and September.
How much are solar panels in Beeston?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Beeston before a battery. What Beeston changes is the return, about 6,250 kWh a year from that system, and your design call prices your actual roof.
Do I need permission from the DNO for solar in Beeston?
Usually not in advance. NGED, the network operator for Beeston, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. "See our DNO explainer.
How much can I earn from exporting solar in Beeston?
With typical use and no battery, a 12-panel system in Beeston exports about 5,315 kWh a year. At 12p per kWh that is roughly £638; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Do solar panels work in winter in Beeston?
Yes, at a lower level. PVGIS gives Beeston 34.3 kWh per kWp in December and 35.7 in January, so a 12-panel system makes about 220 kWh and 230 kWh in those months, against 770 kWh in May. Winter output mostly covers daytime use rather than exporting.
How Beeston compares with its neighbours
How the towns nearest Beeston compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Beeston |
|---|---|---|
| Beeston | 983 | this town |
| Stapleford | 980 | −3 kWh |
| Sandiacre | 981 | −2 kWh |
| Clifton | 983 | level |
| Long Eaton | 986 | +3 kWh |
| Nottingham | 978 | −5 kWh |
| Ruddington | 985 | +2 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also for Beeston: Solar panels in Beeston from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Beeston homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
Why solar panels stop working, and how to work out which one it is
There is an order to this, and it starts at the inverter display rather than the roof.
Read the guide →Which battery size band does your home fall into?
Where UK homes actually land, why oversizing costs you, and what shifts the band.
Read the guide →Three phase and EV charging: what actually changes
Three phase buys 22kW charging. Most cars cannot use it, and load balancing usually solves the real problem.
Read the guide →Which homes suit a heat pump, and which need work first
The trial data says no property type is unsuitable. Design quality decides the outcome.
Read the guide →Which tariffs are actually built for battery charging
A battery buys cheap and uses dear. The tariff decides how much that is worth.
Read the guide →NAPIT, NICEIC and competent person schemes: who tells building control about your solar
Solar work is notifiable. A competent person scheme means your installation team notifies, not you.