Solar panels in Beverley, sized to your roof.
Twelve panels (6.36 kWp) here make about 6,320 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Beverley's solar year
Beverley's best month is May, at 125.5 kWh per kWp; December manages 34.2. Over the year that comes to 994 kWh per kWp, 3% above our Yorkshire county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 35 |
| February | 53.1 |
| March | 87.5 |
| April | 112 |
| May | 126 |
| June | 116 |
| July | 121 |
| August | 110 |
| September | 91.8 |
| October | 63.9 |
| November | 43.5 |
| December | 34.2 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Beverley makes 994 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Beverley is 7% above it.
How Beverley compares
Among the places we publish figures for, Beverley is one of 122 Yorkshire towns we track, and it ranks 5th of 122 for solar yield. It is a medium town in the House of Commons Library classification, with 32,955 residents, and its roofs see 2.72 peak sun hours a day across the year. That drives the standard 12 panel model to 6,322 kWh of generation, of which around 5,385 kWh is exported at 12p for £646 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
These are starting numbers, not a quote. The calculator below opens on Beverley's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
East Riding of Yorkshire is the planning authority covering Beverley, which the House of Commons Library classes as a medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Beverley (53.84357, -0.4279), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
Who runs the grid in Beverley
Beverley sits in Northern Powergrid's Yorkshire licence area, so Northern Powergrid is the network operator (DNO) any solar panels or battery here are registered with.
Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to Northern Powergrid within 28 days of commissioning, with no prior approval.
A bigger inverter or battery output needs a G99 application in advance. Northern Powergrid publishes a guaranteed standard of 45 working days to quote for a low voltage generation connection.
Sources: NESO DNO licence areas (3 May 2024); Northern Powergrid, generation connections page, checked 25 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Beverley
A heat pump in Beverley
A heat pump does most of its work from November to February. Over those four months, 12 panels in Beverley make about 1,050 kWh, against 3,010 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.
The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).
Charging an EV in Beverley
A 12-panel roof in Beverley makes about 800 kWh in May. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Beverley
Faults, servicing and ageing inverters follow the same economics in Beverley as anywhere else, and the guides below price them plainly.
Beverley solar questions
What does a solar panel system produce in Beverley?
Each kWp of panels in Beverley makes 994 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,320 kWh, from about 220 kWh in December up to 800 kWh in May.
What would 12 solar panels cost in Beverley?
£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Beverley differs is output: about 6,320 kWh a year from that system.
Would a system in Beverley need approval from the network operator?
Beverley is on Northern Powergrid's network (Yorkshire licence area). Systems up to 3.68kW per phase of inverter output follow G98: Northern Powergrid is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. Northern Powergrid publishes a guaranteed standard of 45 working days to quote for a low voltage generation connection. Our G98 vs G99 guide explains both routes.
How much would export pay on a system in Beverley?
It is exported. With typical use and no battery, about 5,385 kWh of the 6,320 kWh a 12-panel system makes in Beverley goes to the grid, around £646 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.
Is solar worth it in Beverley in winter?
It works, but the year is lopsided. 68% of a Beverley roof's output lands between April and September; the four months from November to February give about 1,050 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.
How Beverley compares with its neighbours
How the towns nearest Beverley compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Beverley |
|---|---|---|
| Beverley | 994 | this town |
| Cottingham | 992 | −2 kWh |
| Willerby, Anlaby and Kirk Ella | 992 | −2 kWh |
| Kingston upon Hull | 993 | −1 kWh |
| Hessle | 997 | +3 kWh |
| Brough and Elloughton | 978 | −16 kWh |
| Market Weighton | 970 | −24 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also for Beverley: Solar panels in Beverley from OVO Solar & Battery
Also near Beverley
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Beverley homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
What a solar service costs, and how often you actually need one
MCS advises a contractor visit at year 10 on a privately owned home. Most plans sell one a year.
Read the guide →Tesla Powerwall 3 vs Duracell Dura16: which fits your home?
The two packages we actually price, compared on the numbers that decide it.
Read the guide →Home EV charger types and speeds, explained properly
Granny cable, 7kW wall unit or 22kW three phase. What each adds per hour, and which you need.
Read the guide →Are heat pumps noisy? The 37 dB(A) answer, in plain terms
The 1 metre boundary rule is gone. A 37 dB(A) sound test replaced it.
Read the guide →The price cap explained, and what it does to solar payback
The cap limits unit rates, not bills. That changes what solar payback means.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote