Solar panels in Castle Donington, designed on a free call.
Twelve panels (6.36 kWp) here make about 6,300 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Castle Donington roof makes, month by month
Castle Donington's best month is May, at 122.8 kWh per kWp; December manages 35.3. Over the year that comes to 991 kWh per kWp, 1% above our Leicestershire county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 36 |
| February | 51.5 |
| March | 86.3 |
| April | 110 |
| May | 123 |
| June | 117 |
| July | 122 |
| August | 110 |
| September | 92.7 |
| October | 63.2 |
| November | 43.8 |
| December | 35.3 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Castle Donington makes 991 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Castle Donington is 7% above it.
How Castle Donington compares
Small towns rarely get published solar figures, so here are the numbers for Castle Donington. It is one of 26 Leicestershire towns we track, and it ranks joint 9th of 26 for solar yield, a town of 8,194 people in the House of Commons Library settlement data. PVGIS gives its roofs 991 kWh per kWp a year, 2.71 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £891 of year one benefit, £247 of it from your own generation and £644 from export at 12p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Castle Donington's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Planning applications here go through North West Leicestershire; nationally, the House of Commons Library classes Castle Donington as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Castle Donington (52.84543, -1.34565), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
The network operator for Castle Donington
The distribution network operator (DNO) for Castle Donington is National Grid Electricity Distribution (NGED), which runs the East Midlands licence area.
For a typical home the paperwork is light: a system of up to 3.68kW per phase goes through G98, which means NGED is notified within 28 days of switch-on rather than asked beforehand.
Above that, G99 means applying before the work is booked. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Castle Donington
A heat pump in Castle Donington
Heating demand peaks when solar is weakest. In Castle Donington, a 12-panel system makes about 220 kWh in December and 230 kWh in January, a fraction of its 780 kWh in May, which is why a heat pump here is costed on its tariff first.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Castle Donington
Castle Donington's May output, about 780 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Castle Donington
If a system in Castle Donington is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.
Solar in Castle Donington: your questions answered
How much energy would 12 solar panels make in Castle Donington?
Castle Donington averages 2.71 peak sun hours a day, which PVGIS turns into 991 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 6,300 kWh, 68% of it between April and September.
Is solar more expensive in Castle Donington?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Castle Donington, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,300 kWh a year here, which is what drives payback.
Who is the network operator in Castle Donington, and do I need a G99 application?
The operator is National Grid Electricity Distribution (NGED). Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. Your design call checks which route yours needs.
What could I earn from exporting in Castle Donington?
On the 12p export scenario, a 12-panel system in Castle Donington sends about 5,366 kWh a year to the grid, worth around £644. The export rates table compares what each supplier pays.
How does solar perform in Castle Donington in the winter months?
December is the weakest month in Castle Donington: about 220 kWh from 12 panels, against 780 kWh in May. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.
How Castle Donington compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Castle Donington |
|---|---|---|
| Castle Donington | 991 | this town |
| Long Eaton | 986 | −5 kWh |
| Sandiacre | 981 | −10 kWh |
| Shepshed | 986 | −5 kWh |
| Stapleford | 980 | −11 kWh |
| Derby | 980 | −11 kWh |
| East Leake | 986 | −5 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Castle Donington: Solar panels in Castle Donington from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Castle Donington
Sourced, dated and written by us. The same ground we cover on your free call.
Why solar panels stop working, and how to work out which one it is
There is an order to this, and it starts at the inverter display rather than the roof.
Read the guide →Tesla Powerwall 3 vs Duracell Dura16: which fits your home?
The two packages we actually price, compared on the numbers that decide it.
Read the guide →What it really costs to charge an EV at home versus in public
Home off-peak charging costs a fraction of the public price. The arithmetic, and the tariff it depends on.
Read the guide →Sizing a heat pump: what a proper survey covers
Sized by calculation, not by rule of thumb. What the survey covers, and what guessing costs.
Read the guide →What the Smart Export Guarantee actually is
The scheme obliges suppliers to pay above zero, and leaves the rate to them.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.