Solar panels in Castleford, designed on a free call.
Twelve panels (6.36 kWp) here make about 6,120 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Castleford roof makes, month by month
PVGIS puts Castleford at 962 kWh per kWp a year, level with our Yorkshire county estimate. 68% of it arrives between April and September, peaking in May.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 33.2 |
| February | 51.2 |
| March | 84 |
| April | 108 |
| May | 121 |
| June | 113 |
| July | 119 |
| August | 109 |
| September | 88.9 |
| October | 61.4 |
| November | 42.5 |
| December | 31.9 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Castleford makes 962 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Castleford is 4% above it.
How Castleford compares
Among the places we publish figures for, Castleford is one of 122 Yorkshire towns we track, and it ranks joint 40th of 122 for solar yield. It is a medium town in the House of Commons Library classification, with 47,678 residents, and its roofs see 2.64 peak sun hours a day across the year. That drives the standard 12 panel model to 6,118 kWh of generation, of which around 5,182 kWh is exported at 12p for £622 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Castleford's own yield.
Planning applications here go through Wakefield; nationally, the House of Commons Library classes Castleford as a medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Castleford at 53.72026, -1.34458 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
Northern Powergrid and your Castleford connection
Castleford is served by Northern Powergrid: the town's centre falls inside its Yorkshire licence area on NESO's boundary map.
Most home systems stay within 3.68kW per phase of inverter output, which puts them on G98, a notification to Northern Powergrid within 28 days of switch-on. Panel count does not decide it; the inverter and any battery do.
Above that, G99 means applying before the work is booked. Northern Powergrid publishes a guaranteed standard of 45 working days to quote for a low voltage generation connection.
Sources: NESO DNO licence areas (3 May 2024); Northern Powergrid, generation connections page, checked 25 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in Castleford
A heat pump in Castleford
In December, the darkest month here, 12 panels in Castleford make about 200 kWh. That is when a heat pump runs hardest, so its running cost in Castleford comes down to the tariff and the flow temperature rather than the roof.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Castleford
Castleford's May output, about 770 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
Installed prices, the same in every town
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Castleford
The same sourced benchmarks apply in Castleford as everywhere we cover: honest repair pricing and what a service should include.
Common questions about solar in Castleford
How much electricity do solar panels make in Castleford?
About 6,120 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Castleford: 962 kWh per kWp, or 2.64 peak sun hours a day on average. May is the strongest month, at about 770 kWh.
Is solar more expensive in Castleford?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Castleford, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,120 kWh a year here, which is what drives payback.
Which DNO covers Castleford, and what does it need from me?
Northern Powergrid covers Castleford. A home system of up to 3.68kW per phase is notified to Northern Powergrid within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. Northern Powergrid publishes a guaranteed standard of 45 working days to quote for a low voltage generation connection.
What could I earn from exporting in Castleford?
On the 12p export scenario, a 12-panel system in Castleford sends about 5,182 kWh a year to the grid, worth around £622. The export rates table compares what each supplier pays.
How much solar does Castleford get in December?
December is the low point: about 200 kWh from a 12-panel system in Castleford, on PVGIS data, rising to 770 kWh in May. From November to February the same system makes about 1,010 kWh in total, which is why a battery charged off-peak does more of the work in winter.
How Castleford compares with its neighbours
How the towns nearest Castleford compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Castleford |
|---|---|---|
| Castleford | 962 | this town |
| Pontefract | 969 | +7 kWh |
| Normanton | 956 | −6 kWh |
| Featherstone | 965 | +3 kWh |
| Kippax | 953 | −9 kWh |
| Knottingley | 973 | +11 kWh |
| Garforth | 954 | −8 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Castleford: Solar panels in Castleford from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Castleford homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
How to size a solar and battery system, properly
Usage, storage, connection, array. Four decisions, and the order between them matters.
Read the guide →Tesla Powerwall 3 vs Duracell Dura16: which fits your home?
The two packages we actually price, compared on the numbers that decide it.
Read the guide →How solar aware EV charging actually works
The CT clamp, the surplus tracking and the 1.4kW floor that catches people out.
Read the guide →Do you need to replace your radiators for a heat pump?
Some change, most do not. The room by room arithmetic that decides which.
Read the guide →Why tariff choice moves payback more than kit choice
Identical kit, five times the export income. The tariff decision worked through with August 2026 rates.
Read the guide →Your MCS certificate: what it shows, when it arrives, and how a Smart Export Guarantee supplier uses it
The document your export payments hang on. Who issues it, what it shows, and how to get a copy.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.