Solar panels in Catterick Garrison, sized to your roof.
A 12-panel roof in Catterick Garrison makes about 6,000 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in Catterick Garrison can generate
PVGIS puts Catterick Garrison at 944 kWh per kWp a year, 2% below our Yorkshire county estimate. 69% of it arrives between April and September, peaking in May.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 32.2 |
| February | 49.3 |
| March | 84.1 |
| April | 108 |
| May | 121 |
| June | 111 |
| July | 119 |
| August | 107 |
| September | 86.8 |
| October | 57.3 |
| November | 39.9 |
| December | 28.3 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 944, Catterick Garrison is 2% above it.
How Catterick Garrison compares
Small towns rarely get published solar figures, so here are the numbers for Catterick Garrison. It is one of 122 Yorkshire towns we track, and it ranks joint 80th of 122 for solar yield, a town of 13,674 people in the House of Commons Library settlement data. PVGIS gives its roofs 944 kWh per kWp a year, 2.59 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £855 of year one benefit, £247 of it from your own generation and £608 from export at 12p.
These are starting numbers, not a quote. The calculator below opens on Catterick Garrison's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Catterick Garrison sits within North Yorkshire, its local planning authority, and the House of Commons Library classes it as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Catterick Garrison at 54.37483, -1.72312 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
Connecting solar to the Catterick Garrison network
Northern Powergrid owns and runs the local electricity network in Catterick Garrison, as part of its North East England licence area.
What decides the paperwork is the inverter and battery output, not the number of panels. Up to 3.68kW per phase, a system follows G98: Northern Powergrid is notified within 28 days of commissioning and nothing has to be approved first.
A bigger inverter or battery output needs a G99 application in advance. Northern Powergrid publishes a guaranteed standard of 45 working days to quote for a low voltage generation connection.
Sources: NESO DNO licence areas (3 May 2024); Northern Powergrid, generation connections page, checked 25 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Catterick Garrison
A heat pump in Catterick Garrison
Solar and a heat pump pull in opposite directions through the year: Catterick Garrison's roofs make 950 kWh from November to February on a 12-panel system, and 2,920 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Catterick Garrison
A 12-panel roof in Catterick Garrison makes about 770 kWh in May. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
Installed prices, the same in every town
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Catterick Garrison
Guidance is nationwide, so the benchmarks hold in Catterick Garrison: repair costs, service scope, and when the inverter is the real fault.
Catterick Garrison solar questions
What could a roof in Catterick Garrison generate?
PVGIS puts a roof in Catterick Garrison at 944 kWh per kWp a year, 2.59 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,000 kWh a year, most of it between April and September.
How much are solar panels in Catterick Garrison?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Catterick Garrison before a battery. What Catterick Garrison changes is the return, about 6,000 kWh a year from that system, and your design call prices your actual roof.
Do I need permission from the DNO for solar in Catterick Garrison?
Usually not in advance. Northern Powergrid, the network operator for Catterick Garrison, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. Northern Powergrid publishes a guaranteed standard of 45 working days to quote for a low voltage generation connection. "See our DNO explainer.
How much can I earn from exporting solar in Catterick Garrison?
With typical use and no battery, a 12-panel system in Catterick Garrison exports about 5,067 kWh a year. At 12p per kWh that is roughly £608; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Do solar panels work in winter in Catterick Garrison?
Yes, at a lower level. PVGIS gives Catterick Garrison 28.3 kWh per kWp in December and 32.2 in January, so a 12-panel system makes about 180 kWh and 200 kWh in those months, against 770 kWh in May. Winter output mostly covers daytime use rather than exporting.
How Catterick Garrison compares with its neighbours
How the towns nearest Catterick Garrison compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Catterick Garrison |
|---|---|---|
| Catterick Garrison | 944 | this town |
| Richmond | 941 | −3 kWh |
| Northallerton | 930 | −14 kWh |
| Darlington | 934 | −10 kWh |
| Yarm | 921 | −23 kWh |
| Newton Aycliffe | 937 | −7 kWh |
| Shildon | 936 | −8 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Catterick Garrison: Solar panels in Catterick Garrison from OVO Solar & Battery
Also near Catterick Garrison
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Catterick Garrison homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
Back contact solar panels, explained for a UK roof
What back contact changes on a roof, compared fairly with TOPCon, with the makers' own claims labelled.
Read the guide →Tesla Powerwall 3 against the alternatives, and where each one wins
The strongest single box in the market, and the houses it is still wrong for.
Read the guide →What an EV charger installation actually involves
Main fuse, DNO notification, load balancing and the paperwork. What really happens.
Read the guide →Do you need to replace your radiators for a heat pump?
Some change, most do not. The room by room arithmetic that decides which.
Read the guide →Why the best export rates always carry conditions
The top export rates are acquisition offers. Here is how to price the condition.
Read the guide →How to check an MCS certificate is genuine, before the deposit leaves your account
A logo proves nothing. Certification is business specific, technology specific and checkable.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.