Solar panels in Denny, sized to your roof.
A 12-panel roof in Denny makes about 5,440 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Denny's solar year
Denny's best month is May, at 119.7 kWh per kWp; December manages 19.1. Over the year that comes to 856 kWh per kWp, 5% above our Stirlingshire county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 23.1 |
| February | 41.4 |
| March | 70.6 |
| April | 103 |
| May | 120 |
| June | 110 |
| July | 110 |
| August | 97.6 |
| September | 76.5 |
| October | 52.3 |
| November | 33.5 |
| December | 19.1 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 856, Denny is 7% below it.
How Denny compares
Small towns rarely get published solar figures, so here are the numbers for Denny. It is one of 9 Stirlingshire towns we track, and it ranks 7th of 9 for solar yield, a town of 10,570 people in the House of Commons Library settlement data. PVGIS gives its roofs 856 kWh per kWp a year, 2.35 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £788 of year one benefit, £247 of it from your own generation and £541 from export at 12p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Denny's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Falkirk is the planning authority covering Denny, which the House of Commons Library classes as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for Denny's own coordinates (56.02284, -3.90751), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
Who runs the grid in Denny
Denny sits in SP Energy Networks' South and Central Scotland licence area, so SP Energy Networks is the network operator (DNO) any solar panels or battery here are registered with.
G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, SP Energy Networks only has to be told within 28 days after the system is commissioned.
Anything bigger is a G99 case and is applied for first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Denny
A heat pump in Denny
A heat pump does most of its work from November to February. Over those four months, 12 panels in Denny make about 740 kWh, against 2,780 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.
Scottish homes apply through Home Energy Scotland rather than the Boiler Upgrade Scheme: up to £7,500 in grant for a heat pump, up to £7,500 more as an optional interest-free loan, and a £1,500 uplift for rural and island homes (checked 28 September 2026).
Charging an EV in Denny
A 12-panel roof in Denny makes about 760 kWh in May. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
Installed prices, the same in every town
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Denny
Faults, servicing and ageing inverters follow the same economics in Denny as anywhere else, and the guides below price them plainly.
Denny solar questions
What does a solar panel system produce in Denny?
Each kWp of panels in Denny makes 856 kWh a year on PVGIS figures, so a typical 12-panel system produces around 5,440 kWh, from about 120 kWh in December up to 760 kWh in May.
What would 12 solar panels cost in Denny?
£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Denny differs is output: about 5,440 kWh a year from that system.
Would a system in Denny need approval from the network operator?
Denny is on SP Energy Networks' network (South and Central Scotland licence area). Systems up to 3.68kW per phase of inverter output follow G98: SP Energy Networks is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator. Our G98 vs G99 guide explains both routes.
How much would export pay on a system in Denny?
It is exported. With typical use and no battery, about 4,507 kWh of the 5,440 kWh a 12-panel system makes in Denny goes to the grid, around £541 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.
Is solar worth it in Denny in winter?
It works, but the year is lopsided. 72% of a Denny roof's output lands between April and September; the four months from November to February give about 740 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.
How Denny compares with its neighbours
The six closest towns we publish, run through the identical PVGIS query as Denny.
| Town | kWh per kWp a year | vs Denny |
|---|---|---|
| Denny | 856 | this town |
| Bonnybridge | 862 | +6 kWh |
| Larbert and Stenhousemuir | 873 | +17 kWh |
| Falkirk | 867 | +11 kWh |
| Cumbernauld | 827 | −29 kWh |
| Stirling | 876 | +20 kWh |
| Kilsyth | 834 | −22 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for Denny: Solar panels in Denny from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Guides worth reading before your call
Sourced, dated and written by us. The same ground we cover on your free call.
Do solar panels increase home value? What the actual data shows
The largest UK study found a 6.1% to 7.1% sale price premium. Here is the full picture.
Read the guide →What a battery gateway actually does
Without a gateway your system shuts down when the grid does. Here is what the box actually does.
Read the guide →Home EV charger types and speeds, explained properly
Granny cable, 7kW wall unit or 22kW three phase. What each adds per hour, and which you need.
Read the guide →Are heat pumps noisy? The 37 dB(A) answer, in plain terms
The 1 metre boundary rule is gone. A 37 dB(A) sound test replaced it.
Read the guide →Will energy prices keep rising, and by how much
The January forecasts jumped fast. What is confirmed, what is guessed, and whether solar is a real hedge.
Read the guide →Your MCS certificate: what it shows, when it arrives, and how a Smart Export Guarantee supplier uses it
The document your export payments hang on. Who issues it, what it shows, and how to get a copy.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.