Solar panels in Erskine, designed on a free call.
About 5,480 kWh a year from 12 panels in Erskine, £6,360 installed, with your system designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Sunlight in Erskine, in numbers
From 17.8 kWh per kWp in December to 120.6 in May: a roof in Erskine makes 6.8 times as much in its best month as in its darkest, and 861 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 22.3 |
| February | 41.8 |
| March | 70.6 |
| April | 105 |
| May | 121 |
| June | 113 |
| July | 113 |
| August | 98.9 |
| September | 74.8 |
| October | 51.2 |
| November | 31.4 |
| December | 17.8 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 861, Erskine is 7% below it.
How Erskine compares
Small towns rarely get published solar figures, so here are the numbers for Erskine. It is one of 11 Renfrewshire towns we track, and it ranks joint 1st of 11 for solar yield, a town of 16,363 people in the House of Commons Library settlement data. PVGIS gives its roofs 861 kWh per kWp a year, 2.36 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £792 of year one benefit, £247 of it from your own generation and £545 from export at 12p.
These are starting numbers, not a quote. The calculator below opens on Erskine's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Any planning application in Erskine sits with Renfrewshire, and its official House of Commons Library settlement class is small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Erskine (55.90794, -4.46413), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
SP Energy Networks and your Erskine connection
SP Energy Networks owns and runs the local electricity network in Erskine, as part of its South and Central Scotland licence area.
For a typical home the paperwork is light: a system of up to 3.68kW per phase goes through G98, which means SP Energy Networks is notified within 28 days of switch-on rather than asked beforehand.
Above that, G99 means applying before the work is booked. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Erskine
A heat pump in Erskine
Heating demand peaks when solar is weakest. In Erskine, a 12-panel system makes about 110 kWh in December and 140 kWh in January, a fraction of its 770 kWh in May, which is why a heat pump here is costed on its tariff first.
In Scotland, Home Energy Scotland offers a grant of up to £7,500 towards a heat pump, an optional interest-free loan of up to £7,500 on top, and £1,500 more for rural and island homes (Home Energy Scotland, checked 28 September 2026).
Charging an EV in Erskine
Erskine's May output, about 770 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Erskine
The same sourced benchmarks apply in Erskine as everywhere we cover: honest repair pricing and what a service should include.
Common questions about solar in Erskine
How much electricity do solar panels make in Erskine?
About 5,480 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Erskine: 861 kWh per kWp, or 2.36 peak sun hours a day on average. May is the strongest month, at about 770 kWh.
Is solar more expensive in Erskine?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Erskine, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 5,480 kWh a year here, which is what drives payback.
Which DNO covers Erskine, and what does it need from me?
SP Energy Networks covers Erskine. A home system of up to 3.68kW per phase is notified to SP Energy Networks within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator.
What could I earn from exporting in Erskine?
On the 12p export scenario, a 12-panel system in Erskine sends about 4,539 kWh a year to the grid, worth around £545. The export rates table compares what each supplier pays.
How much solar does Erskine get in December?
December is the low point: about 110 kWh from a 12-panel system in Erskine, on PVGIS data, rising to 770 kWh in May. From November to February the same system makes about 720 kWh in total, which is why a battery charged off-peak does more of the work in winter.
How Erskine compares with its neighbours
The six closest towns we publish, run through the identical PVGIS query as Erskine.
| Town | kWh per kWp a year | vs Erskine |
|---|---|---|
| Erskine | 861 | this town |
| Clydebank | 859 | −2 kWh |
| Bishopton | 857 | −4 kWh |
| Renfrew | 860 | −1 kWh |
| Linwood | 851 | −10 kWh |
| Paisley | 858 | −3 kWh |
| Dumbarton | 856 | −5 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also for Erskine: Solar panels in Erskine from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Guides worth reading before your call
Sourced, dated and written by us. The same ground we cover on your free call.
G98 vs G99: the 28-day form and the eight-week wait, in plain English
One number on your quote decides between a formality and an eight week wait.
Read the guide →GivEnergy in administration: what owners should do now
The sourced timeline, the warranty position, and the owner's checklist for this month.
Read the guide →What it really costs to charge an EV at home versus in public
Home off-peak charging costs a fraction of the public price. The arithmetic, and the tariff it depends on.
Read the guide →Do you need to replace your radiators for a heat pump?
Some change, most do not. The room by room arithmetic that decides which.
Read the guide →Why tariff choice moves payback more than kit choice
Identical kit, five times the export income. The tariff decision worked through with August 2026 rates.
Read the guide →HIES explained: what the badge actually protects, and when
What HIES protects: deposits up to 25 percent capped at 5,000 pounds, and your workmanship guarantee.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.