Solar panels in Hoo St Werburgh, designed on a free call.
A 12-panel roof in Hoo St Werburgh makes about 6,720 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Sunlight in Hoo St Werburgh, in numbers
Hoo St Werburgh's best month is July, at 130.4 kWh per kWp; December manages 39. Over the year that comes to 1,057 kWh per kWp, 2% below our Kent county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 39.5 |
| February | 52.7 |
| March | 88.7 |
| April | 119 |
| May | 126 |
| June | 127 |
| July | 130 |
| August | 116 |
| September | 101 |
| October | 70.1 |
| November | 49 |
| December | 39 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 1,057 kWh per kWp in Hoo St Werburgh against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Hoo St Werburgh 14% above it.
How Hoo St Werburgh compares
Small towns rarely get published solar figures, so here are the numbers for Hoo St Werburgh. It is one of 44 Kent towns we track, and it ranks 22nd of 44 for solar yield, a town of 9,731 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,057 kWh per kWp a year, 2.90 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £941 of year one benefit, £247 of it from your own generation and £694 from export at 12p.
Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Hoo St Werburgh's own yield.
Any planning application in Hoo St Werburgh sits with Medway, and its official House of Commons Library settlement class is small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Hoo St Werburgh at 51.42223, 0.55895 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
UK Power Networks and your Hoo St Werburgh connection
UK Power Networks owns and runs the local electricity network in Hoo St Werburgh, as part of its South East England licence area.
For a typical home the paperwork is light: a system of up to 3.68kW per phase goes through G98, which means UK Power Networks is notified within 28 days of switch-on rather than asked beforehand.
Above that, G99 means applying before the work is booked. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in Hoo St Werburgh
A heat pump in Hoo St Werburgh
Heating demand peaks when solar is weakest. In Hoo St Werburgh, a 12-panel system makes about 250 kWh in December and 250 kWh in January, a fraction of its 830 kWh in July, which is why a heat pump here is costed on its tariff first.
The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).
Charging an EV in Hoo St Werburgh
Hoo St Werburgh's July output, about 830 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Hoo St Werburgh
If a system in Hoo St Werburgh is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.
Solar in Hoo St Werburgh: your questions answered
How much energy would 12 solar panels make in Hoo St Werburgh?
Hoo St Werburgh averages 2.90 peak sun hours a day, which PVGIS turns into 1,057 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 6,720 kWh, 68% of it between April and September.
Is solar more expensive in Hoo St Werburgh?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Hoo St Werburgh, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,720 kWh a year here, which is what drives payback.
Who is the network operator in Hoo St Werburgh, and do I need a G99 application?
The operator is UK Power Networks. Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator. Your design call checks which route yours needs.
What could I earn from exporting in Hoo St Werburgh?
On the 12p export scenario, a 12-panel system in Hoo St Werburgh sends about 5,786 kWh a year to the grid, worth around £694. The export rates table compares what each supplier pays.
How does solar perform in Hoo St Werburgh in the winter months?
December is the weakest month in Hoo St Werburgh: about 250 kWh from 12 panels, against 830 kWh in July. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.
How Hoo St Werburgh compares with its neighbours
How the towns nearest Hoo St Werburgh compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Hoo St Werburgh |
|---|---|---|
| Hoo St Werburgh | 1,057 | this town |
| Gillingham (Medway) | 1,047 | −10 kWh |
| Rochester | 1,043 | −14 kWh |
| Chatham | 1,043 | −14 kWh |
| Canvey Island | 1,079 | +22 kWh |
| Gravesend | 1,053 | −4 kWh |
| Stanford-le-Hope | 1,074 | +17 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also for Hoo St Werburgh: Solar panels in Hoo St Werburgh from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Hoo St Werburgh homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
DNO application timescales, network by network: from a G98 notification to a G99 approval
Fit and notify within 28 days, or wait ten working days to 45 for a yes. System size decides which.
Read the guide →Tesla Powerwall 3 against the alternatives, and where each one wins
The strongest single box in the market, and the houses it is still wrong for.
Read the guide →What it really costs to charge an EV at home versus in public
Home off-peak charging costs a fraction of the public price. The arithmetic, and the tariff it depends on.
Read the guide →How much does a heat pump cost? The 2026 numbers, before and after the grant
UK median installed cost around £12,908, before the up to £7,500 grant comes off.
Read the guide →Why tariff choice moves payback more than kit choice
Identical kit, five times the export income. The tariff decision worked through with August 2026 rates.
Read the guide →How to check an MCS certificate is genuine, before the deposit leaves your account
A logo proves nothing. Certification is business specific, technology specific and checkable.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.