Solar panels in Leicester Forest East and Kirby Muxloe.
Twelve panels here make about 6,300 kWh a year for £6,360 installed, designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Leicester Forest East and Kirby Muxloe roof makes, month by month
From 35 kWh per kWp in December to 121.8 in July: a roof in Leicester Forest East and Kirby Muxloe makes 3.5 times as much in its best month as in its darkest, and 990 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 36.7 |
| February | 51.7 |
| March | 85.7 |
| April | 111 |
| May | 122 |
| June | 117 |
| July | 122 |
| August | 109 |
| September | 93 |
| October | 63.3 |
| November | 44.1 |
| December | 35 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 990 kWh per kWp in Leicester Forest East and Kirby Muxloe against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Leicester Forest East and Kirby Muxloe 7% above it.
How Leicester Forest East and Kirby Muxloe compares
Small towns rarely get published solar figures, so here are the numbers for Leicester Forest East and Kirby Muxloe. It is one of 26 Leicestershire towns we track, and it ranks joint 12th of 26 for solar yield, a town of 14,649 people in the House of Commons Library settlement data. PVGIS gives its roofs 990 kWh per kWp a year, 2.71 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £890 of year one benefit, £247 of it from your own generation and £643 from export at 12p.
Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Leicester Forest East and Kirby Muxloe's own yield.
Any planning application in Leicester Forest East and Kirby Muxloe sits with Blaby, and its official House of Commons Library settlement class is small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for Leicester Forest East and Kirby Muxloe's own coordinates (52.62504, -1.22299), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
NGED and your Leicester Forest East and Kirby Muxloe connection
Leicester Forest East and Kirby Muxloe is served by National Grid Electricity Distribution (NGED): the town's centre falls inside its East Midlands licence area on NESO's boundary map.
Most home systems stay within 3.68kW per phase of inverter output, which puts them on G98, a notification to NGED within 28 days of switch-on. Panel count does not decide it; the inverter and any battery do.
Above that, G99 means applying before the work is booked. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in Leicester Forest East and Kirby Muxloe
A heat pump in Leicester Forest East and Kirby Muxloe
Heating demand peaks when solar is weakest. In Leicester Forest East and Kirby Muxloe, a 12-panel system makes about 220 kWh in December and 230 kWh in January, a fraction of its 770 kWh in July, which is why a heat pump here is costed on its tariff first.
The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).
Charging an EV in Leicester Forest East and Kirby Muxloe
Leicester Forest East and Kirby Muxloe's July output, about 770 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
Installed prices, the same in every town
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Leicester Forest East and Kirby Muxloe
If a system in Leicester Forest East and Kirby Muxloe is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.
Common questions about solar in Leicester Forest East and Kirby Muxloe
How much energy would 12 solar panels make in Leicester Forest East and Kirby Muxloe?
Leicester Forest East and Kirby Muxloe averages 2.71 peak sun hours a day, which PVGIS turns into 990 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 6,300 kWh, 68% of it between April and September.
Is solar more expensive in Leicester Forest East and Kirby Muxloe?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Leicester Forest East and Kirby Muxloe, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,300 kWh a year here, which is what drives payback.
Who is the network operator in Leicester Forest East and Kirby Muxloe, and do I need a G99 application?
The operator is National Grid Electricity Distribution (NGED). Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. Your design call checks which route yours needs.
What could I earn from exporting in Leicester Forest East and Kirby Muxloe?
On the 12p export scenario, a 12-panel system in Leicester Forest East and Kirby Muxloe sends about 5,360 kWh a year to the grid, worth around £643. The export rates table compares what each supplier pays.
How does solar perform in Leicester Forest East and Kirby Muxloe in the winter months?
December is the weakest month in Leicester Forest East and Kirby Muxloe: about 220 kWh from 12 panels, against 770 kWh in July. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.
How Leicester Forest East and Kirby Muxloe compares with its neighbours
How the towns nearest Leicester Forest East and Kirby Muxloe compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Leicester Forest East and Kirby Muxloe |
|---|---|---|
| Leicester Forest East and Kirby Muxloe | 990 | this town |
| Enderby and Narborough | 990 | level |
| Leicester | 994 | +4 kWh |
| Blaby and Whetstone | 993 | +3 kWh |
| Earl Shilton | 990 | level |
| Wigston | 997 | +7 kWh |
| Birstall | 981 | −9 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also near Leicester Forest East and Kirby Muxloe
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Leicester Forest East and Kirby Muxloe homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
Do solar panels increase home value? What the actual data shows
The largest UK study found a 6.1% to 7.1% sale price premium. Here is the full picture.
Read the guide →GivEnergy in administration: what owners should do now
The sourced timeline, the warranty position, and the owner's checklist for this month.
Read the guide →Three phase and EV charging: what actually changes
Three phase buys 22kW charging. Most cars cannot use it, and load balancing usually solves the real problem.
Read the guide →Sizing a heat pump: what a proper survey covers
Sized by calculation, not by rule of thumb. What the survey covers, and what guessing costs.
Read the guide →The price cap explained, and what it does to solar payback
The cap limits unit rates, not bills. That changes what solar payback means.
Read the guide →NAPIT, NICEIC and competent person schemes: who tells building control about your solar
Solar work is notifiable. A competent person scheme means your installation team notifies, not you.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.