Solar panels in Leicester Forest East and Kirby Muxloe.

Twelve panels here make about 6,300 kWh a year for £6,360 installed, designed on a free 30-minute video call.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Leicester Forest East and Kirby Muxloe

How much a Leicester Forest East and Kirby Muxloe roof makes, month by month

From 35 kWh per kWp in December to 121.8 in July: a roof in Leicester Forest East and Kirby Muxloe makes 3.5 times as much in its best month as in its darkest, and 990 kWh per kWp across the year.

Map showing Leicester Forest East and Kirby Muxloe in Leicestershire A simplified outline map of Leicestershire with neighbouring counties shown faintly, and a pin marking the location of Leicester Forest East and Kirby Muxloe.
Leicester Forest East and Kirby Muxloe in Leicestershire

Generation per kWp, month by month

Leicester Forest East and Kirby Muxloe, 990 kWh per kWp a year
Leicester Forest East and Kirby Muxloe, monthly generation per kWp Bar chart, twelve months January to December. Peak July at 122 kWh/kWp. Lowest December at 35 kWh/kWp. Full values are in the table below this chart. 140 0 JFMAMJJASOND 122
Show the monthly figures
Leicester Forest East and Kirby Muxloe, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January36.7
February51.7
March85.7
April111
May122
June117
July122
August109
September93
October63.3
November44.1
December35

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

6,300kWh a year, 12 panels
770kWh in July, the peak
220kWh in December

For scale: 990 kWh per kWp in Leicester Forest East and Kirby Muxloe against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Leicester Forest East and Kirby Muxloe 7% above it.

How Leicester Forest East and Kirby Muxloe compares

Small towns rarely get published solar figures, so here are the numbers for Leicester Forest East and Kirby Muxloe. It is one of 26 Leicestershire towns we track, and it ranks joint 12th of 26 for solar yield, a town of 14,649 people in the House of Commons Library settlement data. PVGIS gives its roofs 990 kWh per kWp a year, 2.71 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £890 of year one benefit, £247 of it from your own generation and £643 from export at 12p.

Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Leicester Forest East and Kirby Muxloe's own yield.

Any planning application in Leicester Forest East and Kirby Muxloe sits with Blaby, and its official House of Commons Library settlement class is small town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£890
£74 a month · payback 7.1 yrs
System price, installed
£6,360
Simple payback
7.1 yrs
Generates a year
6,296 kWh
Exported
5,360 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Generation is modelled from PVGIS satellite data for Leicester Forest East and Kirby Muxloe's own coordinates (52.62504, -1.22299), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.

Local grid

NGED and your Leicester Forest East and Kirby Muxloe connection

Leicester Forest East and Kirby Muxloe is served by National Grid Electricity Distribution (NGED): the town's centre falls inside its East Midlands licence area on NESO's boundary map.

Most home systems stay within 3.68kW per phase of inverter output, which puts them on G98, a notification to NGED within 28 days of switch-on. Panel count does not decide it; the inverter and any battery do.

Above that, G99 means applying before the work is booked. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.

Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Aerial view of a flat-roof garden building with a black solar panel array, on a residential street
A flat-roof garden building fitted with its own solar array.
Beyond solar

Beyond the panels: heating and car charging in Leicester Forest East and Kirby Muxloe

A heat pump in Leicester Forest East and Kirby Muxloe

Heating demand peaks when solar is weakest. In Leicester Forest East and Kirby Muxloe, a 12-panel system makes about 220 kWh in December and 230 kWh in January, a fraction of its 770 kWh in July, which is why a heat pump here is costed on its tariff first.

The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in Leicester Forest East and Kirby Muxloe

Leicester Forest East and Kirby Muxloe's July output, about 770 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.

If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.

EV charging explained

Already got panels?

Solar panel servicing and repair in Leicester Forest East and Kirby Muxloe

If a system in Leicester Forest East and Kirby Muxloe is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.

FAQs

Common questions about solar in Leicester Forest East and Kirby Muxloe

How much energy would 12 solar panels make in Leicester Forest East and Kirby Muxloe?

Leicester Forest East and Kirby Muxloe averages 2.71 peak sun hours a day, which PVGIS turns into 990 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 6,300 kWh, 68% of it between April and September.

Is solar more expensive in Leicester Forest East and Kirby Muxloe?

Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Leicester Forest East and Kirby Muxloe, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,300 kWh a year here, which is what drives payback.

Who is the network operator in Leicester Forest East and Kirby Muxloe, and do I need a G99 application?

The operator is National Grid Electricity Distribution (NGED). Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. Your design call checks which route yours needs.

What could I earn from exporting in Leicester Forest East and Kirby Muxloe?

On the 12p export scenario, a 12-panel system in Leicester Forest East and Kirby Muxloe sends about 5,360 kWh a year to the grid, worth around £643. The export rates table compares what each supplier pays.

How does solar perform in Leicester Forest East and Kirby Muxloe in the winter months?

December is the weakest month in Leicester Forest East and Kirby Muxloe: about 220 kWh from 12 panels, against 770 kWh in July. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.

How Leicester Forest East and Kirby Muxloe compares with its neighbours

How the towns nearest Leicester Forest East and Kirby Muxloe compare on the same PVGIS settings, closest first.

TownkWh per kWp a yearvs Leicester Forest East and Kirby Muxloe
Leicester Forest East and Kirby Muxloe990this town
Enderby and Narborough990level
Leicester994+4 kWh
Blaby and Whetstone993+3 kWh
Earl Shilton990level
Wigston997+7 kWh
Birstall981−9 kWh

Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.

All of Leicestershire

Also near Leicester Forest East and Kirby Muxloe

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Leicester Forest East and Kirby Muxloe. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.