0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Leicestershire

Solar panels in Blaby and Whetstone, with the numbers shown.

A 12-panel roof in Blaby and Whetstone makes about 6,320 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Blaby and Whetstone

Blaby and Whetstone's solar year

From 33.6 kWh per kWp in December to 122.5 in July: a roof in Blaby and Whetstone makes 3.6 times as much in its best month as in its darkest, and 993 kWh per kWp across the year.

Map showing Blaby and Whetstone in Leicestershire A simplified outline map of Leicestershire with neighbouring counties shown faintly, and a pin marking the location of Blaby and Whetstone.
Blaby and Whetstone in Leicestershire

Generation per kWp, month by month

Blaby and Whetstone, 993 kWh per kWp a year
Blaby and Whetstone, monthly generation per kWp Bar chart, twelve months January to December. Peak July at 123 kWh/kWp. Lowest December at 33.6 kWh/kWp. Full values are in the table below this chart. 141 0 JFMAMJJASOND 123
Show the monthly figures
Blaby and Whetstone, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January36.4
February51.1
March86.3
April112
May122
June118
July123
August110
September93.3
October64
November44.3
December33.6

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

6,320kWh a year, 12 panels
780kWh in July, the peak
210kWh in December

Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 993, Blaby and Whetstone is 7% above it.

How Blaby and Whetstone compares

Small towns rarely get published solar figures, so here are the numbers for Blaby and Whetstone. It is one of 26 Leicestershire towns we track, and it ranks 8th of 26 for solar yield, a town of 14,739 people in the House of Commons Library settlement data. PVGIS gives its roofs 993 kWh per kWp a year, 2.72 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £892 of year one benefit, £247 of it from your own generation and £645 from export at 12p.

These are starting numbers, not a quote. The calculator below opens on Blaby and Whetstone's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.

Blaby is the planning authority covering Blaby and Whetstone, which the House of Commons Library classes as a small town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£892
£74 a month · payback 7.1 yrs
System price, installed
£6,360
Simple payback
7.1 yrs
Generates a year
6,315 kWh
Exported
5,379 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Generation is modelled from PVGIS satellite data for Blaby and Whetstone's own coordinates (52.56856, -1.17254), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.

Local grid

Who runs the grid in Blaby and Whetstone

Blaby and Whetstone is served by National Grid Electricity Distribution (NGED): the town's centre falls inside its East Midlands licence area on NESO's boundary map.

What decides the paperwork is the inverter and battery output, not the number of panels. Up to 3.68kW per phase, a system follows G98: NGED is notified within 28 days of commissioning and nothing has to be approved first.

A bigger inverter or battery output needs a G99 application in advance. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.

Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

A stone-built UK bungalow with a full all-black solar panel array across the roof pitch
An all-black panel array fitted flush across a stone bungalow's roof.
Beyond solar

Adding a heat pump or an EV charger in Blaby and Whetstone

A heat pump in Blaby and Whetstone

A heat pump does most of its work from November to February. Over those four months, 12 panels in Blaby and Whetstone make about 1,050 kWh, against 3,000 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.

Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in Blaby and Whetstone

From April to September, 68% of a Blaby and Whetstone roof's yearly output arrives, peaking at about 780 kWh in July on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.

If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.

EV charging explained

Already got panels?

Solar panel servicing and repair in Blaby and Whetstone

Faults, servicing and ageing inverters follow the same economics in Blaby and Whetstone as anywhere else, and the guides below price them plainly.

FAQs

Blaby and Whetstone solar questions

What does a solar panel system produce in Blaby and Whetstone?

Each kWp of panels in Blaby and Whetstone makes 993 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,320 kWh, from about 210 kWh in December up to 780 kWh in July.

What would 12 solar panels cost in Blaby and Whetstone?

£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Blaby and Whetstone differs is output: about 6,320 kWh a year from that system.

Would a system in Blaby and Whetstone need approval from the network operator?

Blaby and Whetstone is on National Grid Electricity Distribution's network (East Midlands licence area). Systems up to 3.68kW per phase of inverter output follow G98: NGED is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. Our G98 vs G99 guide explains both routes.

How much would export pay on a system in Blaby and Whetstone?

It is exported. With typical use and no battery, about 5,379 kWh of the 6,320 kWh a 12-panel system makes in Blaby and Whetstone goes to the grid, around £645 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.

Is solar worth it in Blaby and Whetstone in winter?

It works, but the year is lopsided. 68% of a Blaby and Whetstone roof's output lands between April and September; the four months from November to February give about 1,050 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.

How Blaby and Whetstone compares with its neighbours

How the towns nearest Blaby and Whetstone compare on the same PVGIS settings, closest first.

TownkWh per kWp a yearvs Blaby and Whetstone
Blaby and Whetstone993this town
Countesthorpe996+3 kWh
Enderby and Narborough990−3 kWh
Wigston997+4 kWh
Broughton Astley991−2 kWh
Leicester Forest East and Kirby Muxloe990−3 kWh
Oadby1,005+12 kWh

Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.

All of Leicestershire

Also near Blaby and Whetstone

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Blaby and Whetstone. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.