Solar panels in Maldon, designed on a free call.
A 12-panel roof in Maldon makes about 6,910 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Maldon roof makes, month by month
PVGIS puts Maldon at 1,086 kWh per kWp a year, 2% above our Essex county estimate. 68% of it arrives between April and September, peaking in July.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 41.1 |
| February | 56.1 |
| March | 93.7 |
| April | 122 |
| May | 130 |
| June | 130 |
| July | 131 |
| August | 117 |
| September | 103 |
| October | 71.9 |
| November | 51.1 |
| December | 38.6 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 1,086, Maldon is 17% above it.
How Maldon compares
Small towns rarely get published solar figures, so here are the numbers for Maldon. It is one of 46 Essex towns we track, and it ranks 9th of 46 for solar yield, a town of 24,473 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,086 kWh per kWp a year, 2.97 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £963 of year one benefit, £247 of it from your own generation and £716 from export at 12p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Maldon's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Maldon is its own local planning authority area, and its House of Commons Library settlement class is small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Maldon at 51.7312, 0.68372 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
The network operator for Maldon
On NESO's licence-area map, Maldon is in East England, which UK Power Networks operates. That makes UK Power Networks the network operator for any system fitted here.
Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to UK Power Networks within 28 days of commissioning, with no prior approval.
Above that, G99 means applying before the work is booked. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Maldon
A heat pump in Maldon
In December, the darkest month here, 12 panels in Maldon make about 250 kWh. That is when a heat pump runs hardest, so its running cost in Maldon comes down to the tariff and the flow temperature rather than the roof.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Maldon
Maldon's July output, about 840 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Maldon
The same sourced benchmarks apply in Maldon as everywhere we cover: honest repair pricing and what a service should include.
Solar in Maldon: your questions answered
How much electricity do solar panels make in Maldon?
About 6,910 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Maldon: 1,086 kWh per kWp, or 2.97 peak sun hours a day on average. July is the strongest month, at about 840 kWh.
Is solar more expensive in Maldon?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Maldon, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,910 kWh a year here, which is what drives payback.
Which DNO covers Maldon, and what does it need from me?
UK Power Networks covers Maldon. A home system of up to 3.68kW per phase is notified to UK Power Networks within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
What could I earn from exporting in Maldon?
On the 12p export scenario, a 12-panel system in Maldon sends about 5,970 kWh a year to the grid, worth around £716. The export rates table compares what each supplier pays.
How much solar does Maldon get in December?
December is the low point: about 250 kWh from a 12-panel system in Maldon, on PVGIS data, rising to 840 kWh in July. From November to February the same system makes about 1,190 kWh in total, which is why a battery charged off-peak does more of the work in winter.
How Maldon compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Maldon |
|---|---|---|
| Maldon | 1,086 | this town |
| Witham | 1,075 | −11 kWh |
| Tiptree | 1,077 | −9 kWh |
| South Woodham Ferrers | 1,088 | +2 kWh |
| Chelmsford | 1,061 | −25 kWh |
| Burnham-on-Crouch | 1,122 | +36 kWh |
| Hockley and Hawkwell | 1,102 | +16 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for Maldon: Solar panels in Maldon from OVO Solar & Battery
Also near Maldon
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Maldon
Sourced, dated and written by us. The same ground we cover on your free call.
How long do solar panels last? 25 to 30 years, in practice
The panels outlast the inverter by a wide margin. Plan for that, not for cleaning.
Read the guide →Inside a home battery: capacity, power and losses
Usable capacity, kW output, round trip losses and chemistry, in plain terms.
Read the guide →Three phase and EV charging: what actually changes
Three phase buys 22kW charging. Most cars cannot use it, and load balancing usually solves the real problem.
Read the guide →What are the disadvantages of a heat pump? Six honest ones
Six real disadvantages, worth planning around rather than a reason to rule one out.
Read the guide →Why tariff choice moves payback more than kit choice
Identical kit, five times the export income. The tariff decision worked through with August 2026 rates.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.