0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Essex

Solar panels in Witham, with the numbers shown.

About 6,840 kWh a year from 12 panels in Witham, £6,360 installed, with your system designed on a free 30-minute video call.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Witham

What a roof in Witham can generate

From 38 kWh per kWp in December to 129.6 in July: a roof in Witham makes 3.4 times as much in its best month as in its darkest, and 1,075 kWh per kWp across the year.

Map showing Witham in Essex A simplified outline map of Essex with neighbouring counties shown faintly, and a pin marking the location of Witham.
Witham in Essex

Generation per kWp, month by month

Witham, 1,075 kWh per kWp a year
Witham, monthly generation per kWp Bar chart, twelve months January to December. Peak July at 130 kWh/kWp. Lowest December at 38 kWh/kWp. Full values are in the table below this chart. 149 0 JFMAMJJASOND 130
Show the monthly figures
Witham, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January40.4
February55.4
March93.1
April121
May128
June128
July130
August117
September102
October71.7
November50
December38

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

6,840kWh a year, 12 panels
820kWh in July, the peak
240kWh in December

For scale: 1,075 kWh per kWp in Witham against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Witham 16% above it.

How Witham compares

Among the places we publish figures for, Witham is one of 46 Essex towns we track, and it ranks 14th of 46 for solar yield. It is a medium town in the House of Commons Library classification, with 28,618 residents, and its roofs see 2.95 peak sun hours a day across the year. That drives the standard 12 panel model to 6,837 kWh of generation, of which around 5,900 kWh is exported at 12p for £708 a year, with £247 saved on electricity you would otherwise buy at 26.32p.

Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Witham's own yield.

Witham sits within Braintree, its local planning authority, and the House of Commons Library classes it as a medium town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£955
£80 a month · payback 6.7 yrs
System price, installed
£6,360
Simple payback
6.7 yrs
Generates a year
6,837 kWh
Exported
5,900 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Generation is modelled from PVGIS satellite data for Witham's own coordinates (51.80272, 0.63627), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.

Local grid

Connecting solar to the Witham network

On NESO's licence-area map, Witham is in East England, which UK Power Networks operates. That makes UK Power Networks the network operator for any system fitted here.

Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to UK Power Networks within 28 days of commissioning, with no prior approval.

A bigger inverter or battery output needs a G99 application in advance. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.

Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Wide aerial view of a UK new-build housing estate with several homes already fitted with solar panels
A new-build estate where solar is already spreading, roof by roof.
Beyond solar

Beyond the panels: heating and car charging in Witham

A heat pump in Witham

Solar and a heat pump pull in opposite directions through the year: Witham's roofs make 1,170 kWh from November to February on a 12-panel system, and 3,200 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.

The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in Witham

From April to September, 68% of a Witham roof's yearly output arrives, peaking at about 820 kWh in July on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.

Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.

EV charging explained

FAQs

Common questions about solar in Witham

What could a roof in Witham generate?

PVGIS puts a roof in Witham at 1,075 kWh per kWp a year, 2.95 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,840 kWh a year, most of it between April and September.

What would 12 solar panels cost in Witham?

£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Witham differs is output: about 6,840 kWh a year from that system.

Do I need permission from the DNO for solar in Witham?

Usually not in advance. UK Power Networks, the network operator for Witham, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator. "See our DNO explainer.

How much would export pay on a system in Witham?

It is exported. With typical use and no battery, about 5,900 kWh of the 6,840 kWh a 12-panel system makes in Witham goes to the grid, around £708 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.

Do solar panels work in winter in Witham?

Yes, at a lower level. PVGIS gives Witham 38 kWh per kWp in December and 40.4 in January, so a 12-panel system makes about 240 kWh and 260 kWh in those months, against 820 kWh in July. Winter output mostly covers daytime use rather than exporting.

How Witham compares with its neighbours

The six closest towns we publish, run through the identical PVGIS query as Witham.

TownkWh per kWp a yearvs Witham
Witham1,075this town
Tiptree1,077+2 kWh
Maldon1,086+11 kWh
Great Notley1,062−13 kWh
Braintree1,065−10 kWh
Chelmsford1,061−14 kWh
Halstead1,062−13 kWh

Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.

Also for Witham: Solar panels in Witham from OVO Solar & Battery

All of Essex

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Witham. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.