Solar panels in March, designed on a free call.
About 6,560 kWh a year from 12 panels in March, £6,360 installed, with your system designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a March roof makes, month by month
PVGIS puts March at 1,032 kWh per kWp a year, level with our Cambridgeshire county estimate. 67% of it arrives between April and September, peaking in May.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 38.6 |
| February | 54.7 |
| March | 89.5 |
| April | 115 |
| May | 124 |
| June | 121 |
| July | 124 |
| August | 113 |
| September | 96.6 |
| October | 68.2 |
| November | 49.1 |
| December | 37.5 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: March makes 1,032 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so March is 12% above it.
How March compares
Small towns rarely get published solar figures, so here are the numbers for March. It is one of 11 Cambridgeshire towns we track, and it ranks 9th of 11 for solar yield, a town of 21,175 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,032 kWh per kWp a year, 2.83 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £922 of year one benefit, £247 of it from your own generation and £675 from export at 12p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on March's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Any planning application in March sits with Fenland, and its official House of Commons Library settlement class is small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for March at 52.55176, 0.08659 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
UK Power Networks and your March connection
On NESO's licence-area map, March is in East England, which UK Power Networks operates. That makes UK Power Networks the network operator for any system fitted here.
Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to UK Power Networks within 28 days of commissioning, with no prior approval.
Above that, G99 means applying before the work is booked. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in March
A heat pump in March
In December, the darkest month here, 12 panels in March make about 240 kWh. That is when a heat pump runs hardest, so its running cost in March comes down to the tariff and the flow temperature rather than the roof.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in March
March's May output, about 790 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in March
If a system in March is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.
Solar in March: your questions answered
How much energy would 12 solar panels make in March?
March averages 2.83 peak sun hours a day, which PVGIS turns into 1,032 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 6,560 kWh, 67% of it between April and September.
Is solar more expensive in March?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in March, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,560 kWh a year here, which is what drives payback.
Who is the network operator in March, and do I need a G99 application?
The operator is UK Power Networks. Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator. Your design call checks which route yours needs.
What could I earn from exporting in March?
On the 12p export scenario, a 12-panel system in March sends about 5,627 kWh a year to the grid, worth around £675. The export rates table compares what each supplier pays.
How does solar perform in March in the winter months?
December is the weakest month in March: about 240 kWh from 12 panels, against 790 kWh in May. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.
How March compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs March |
|---|---|---|
| March | 1,032 | this town |
| Chatteris | 1,033 | +1 kWh |
| Wisbech | 1,038 | +6 kWh |
| Whittlesey | 1,035 | +3 kWh |
| Littleport | 1,029 | −3 kWh |
| Ely | 1,029 | −3 kWh |
| Downham Market | 1,026 | −6 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for March: Solar panels in March from OVO Solar & Battery
Also near March
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for March
Sourced, dated and written by us. The same ground we cover on your free call.
DNO application timescales, network by network: from a G98 notification to a G99 approval
Fit and notify within 28 days, or wait ten working days to 45 for a yes. System size decides which.
Read the guide →Inside a home battery: capacity, power and losses
Usable capacity, kW output, round trip losses and chemistry, in plain terms.
Read the guide →Charging an EV from your own solar
Every surplus kWh is 3.6 to 5 miles. Whether that beats a 7p overnight rate is arithmetic.
Read the guide →Do you need to replace your radiators for a heat pump?
Some change, most do not. The room by room arithmetic that decides which.
Read the guide →Why tariff choice moves payback more than kit choice
Identical kit, five times the export income. The tariff decision worked through with August 2026 rates.
Read the guide →NAPIT, NICEIC and competent person schemes: who tells building control about your solar
Solar work is notifiable. A competent person scheme means your installation team notifies, not you.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.