Solar panels in Chatteris, designed on a free call.
A 12-panel roof in Chatteris makes about 6,570 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Chatteris roof makes, month by month
Chatteris' best month is May, at 123.9 kWh per kWp; December manages 37.7. Over the year that comes to 1,033 kWh per kWp, level with our Cambridgeshire county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 38.9 |
| February | 55.5 |
| March | 89.3 |
| April | 115 |
| May | 124 |
| June | 121 |
| July | 124 |
| August | 113 |
| September | 97.7 |
| October | 68.6 |
| November | 49.3 |
| December | 37.7 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Chatteris makes 1,033 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Chatteris is 12% above it.
How Chatteris compares
Small towns rarely get published solar figures, so here are the numbers for Chatteris. It is one of 11 Cambridgeshire towns we track, and it ranks 8th of 11 for solar yield, a town of 10,951 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,033 kWh per kWp a year, 2.83 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £923 of year one benefit, £247 of it from your own generation and £676 from export at 12p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Chatteris' own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Any planning application in Chatteris sits with Fenland, and its official House of Commons Library settlement class is small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for Chatteris' own coordinates (52.45459, 0.04739), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
UK Power Networks and your Chatteris connection
The distribution network operator (DNO) for Chatteris is UK Power Networks, which runs the East England licence area.
For a typical home the paperwork is light: a system of up to 3.68kW per phase goes through G98, which means UK Power Networks is notified within 28 days of switch-on rather than asked beforehand.
Above that, G99 means applying before the work is booked. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Chatteris
A heat pump in Chatteris
In December, the darkest month here, 12 panels in Chatteris make about 240 kWh. That is when a heat pump runs hardest, so its running cost in Chatteris comes down to the tariff and the flow temperature rather than the roof.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Chatteris
Chatteris' May output, about 790 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Chatteris
If a system in Chatteris is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.
Solar in Chatteris: your questions answered
How much energy would 12 solar panels make in Chatteris?
Chatteris averages 2.83 peak sun hours a day, which PVGIS turns into 1,033 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 6,570 kWh, 67% of it between April and September.
Is solar more expensive in Chatteris?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Chatteris, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,570 kWh a year here, which is what drives payback.
Who is the network operator in Chatteris, and do I need a G99 application?
The operator is UK Power Networks. Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator. Your design call checks which route yours needs.
What could I earn from exporting in Chatteris?
On the 12p export scenario, a 12-panel system in Chatteris sends about 5,633 kWh a year to the grid, worth around £676. The export rates table compares what each supplier pays.
How does solar perform in Chatteris in the winter months?
December is the weakest month in Chatteris: about 240 kWh from 12 panels, against 790 kWh in May. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.
How Chatteris compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Chatteris |
|---|---|---|
| Chatteris | 1,033 | this town |
| March | 1,032 | −1 kWh |
| Ely | 1,029 | −4 kWh |
| St Ives | 1,038 | +5 kWh |
| Whittlesey | 1,035 | +2 kWh |
| Littleport | 1,029 | −4 kWh |
| Huntingdon | 1,039 | +6 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for Chatteris: Solar panels in Chatteris from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Chatteris
Sourced, dated and written by us. The same ground we cover on your free call.
Why your inverter is smaller than your panel array, and why that is correct
More panel capacity than inverter capacity is a deliberate design choice.
Read the guide →Inside a home battery: capacity, power and losses
Usable capacity, kW output, round trip losses and chemistry, in plain terms.
Read the guide →Smart charge point regulations, explained
Why your charger arrives pre-set to charge overnight, and why it waits before it starts.
Read the guide →What MCS certification actually buys you on a heat pump job
The gate on the £7,500 grant, the design standard behind your running costs, and the noise sign-off.
Read the guide →Why tariff choice moves payback more than kit choice
Identical kit, five times the export income. The tariff decision worked through with August 2026 rates.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.