Solar panels in Montrose, designed on a free call.
Twelve panels (6.36 kWp) here make about 5,870 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Sunlight in Montrose, in numbers
Montrose's best month is May, at 129.9 kWh per kWp; December manages 22.3. Over the year that comes to 923 kWh per kWp, level with our Angus county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 28.1 |
| February | 44.8 |
| March | 79 |
| April | 111 |
| May | 130 |
| June | 117 |
| July | 119 |
| August | 103 |
| September | 80.5 |
| October | 53.6 |
| November | 34.9 |
| December | 22.3 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 923, Montrose is level with it.
How Montrose compares
Small towns rarely get published solar figures, so here are the numbers for Montrose. It is one of 7 Angus towns we track, and it ranks 4th of 7 for solar yield, a town of 12,334 people in the House of Commons Library settlement data. PVGIS gives its roofs 923 kWh per kWp a year, 2.53 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £839 of year one benefit, £247 of it from your own generation and £592 from export at 12p.
Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Montrose's own yield.
Planning applications here go through Angus; nationally, the House of Commons Library classes Montrose as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Montrose at 56.70925, -2.46721 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
SSEN and your Montrose connection
Montrose is served by Scottish and Southern Electricity Networks (SSEN): the town's centre falls inside its North Scotland licence area on NESO's boundary map.
Most home systems stay within 3.68kW per phase of inverter output, which puts them on G98, a notification to SSEN within 28 days of switch-on. Panel count does not decide it; the inverter and any battery do.
Above that, G99 means applying before the work is booked. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.
Sources: NESO DNO licence areas (3 May 2024); SSEN, micro-generation connections page, checked 25 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in Montrose
A heat pump in Montrose
Heating demand peaks when solar is weakest. In Montrose, a 12-panel system makes about 140 kWh in December and 180 kWh in January, a fraction of its 830 kWh in May, which is why a heat pump here is costed on its tariff first.
In Scotland, Home Energy Scotland offers a grant of up to £7,500 towards a heat pump, an optional interest-free loan of up to £7,500 on top, and £1,500 more for rural and island homes (Home Energy Scotland, checked 28 September 2026).
Charging an EV in Montrose
Montrose's May output, about 830 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Montrose
If a system in Montrose is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.
Solar in Montrose: your questions answered
How much energy would 12 solar panels make in Montrose?
Montrose averages 2.53 peak sun hours a day, which PVGIS turns into 923 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 5,870 kWh, 72% of it between April and September.
Is solar more expensive in Montrose?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Montrose, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 5,870 kWh a year here, which is what drives payback.
Who is the network operator in Montrose, and do I need a G99 application?
The operator is Scottish and Southern Electricity Networks (SSEN). Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW. Your design call checks which route yours needs.
What could I earn from exporting in Montrose?
On the 12p export scenario, a 12-panel system in Montrose sends about 4,934 kWh a year to the grid, worth around £592. The export rates table compares what each supplier pays.
How does solar perform in Montrose in the winter months?
December is the weakest month in Montrose: about 140 kWh from 12 panels, against 830 kWh in May. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.
How Montrose compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Montrose |
|---|---|---|
| Montrose | 923 | this town |
| Arbroath | 940 | +17 kWh |
| Forfar | 943 | +20 kWh |
| Carnoustie | 921 | −2 kWh |
| Stonehaven | 907 | −16 kWh |
| Monifieth | 909 | −14 kWh |
| Broughty Ferry | 917 | −6 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for Montrose: Solar panels in Montrose from OVO Solar & Battery
Also near Montrose
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Montrose
Sourced, dated and written by us. The same ground we cover on your free call.
0% VAT on solar and batteries: what qualifies, and what does not
Zero VAT until 31 March 2027, then 5% returns. What qualifies, and what it is worth.
Read the guide →Does a standalone battery actually pay back?
No panels means one job: buy cheap, use later. The tariff decides whether it pays.
Read the guide →Three phase and EV charging: what actually changes
Three phase buys 22kW charging. Most cars cannot use it, and load balancing usually solves the real problem.
Read the guide →How much does a heat pump cost? The 2026 numbers, before and after the grant
UK median installed cost around £12,908, before the up to £7,500 grant comes off.
Read the guide →Choosing a tariff when you have solar, a battery and an EV
Solar, battery and EV want different tariffs. How to work out which one to protect.
Read the guide →NAPIT, NICEIC and competent person schemes: who tells building control about your solar
Solar work is notifiable. A competent person scheme means your installation team notifies, not you.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.