Solar panels in St Andrews, sized to your roof.
A 12-panel roof in St Andrews makes about 6,250 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in St Andrews can generate
From 22.6 kWh per kWp in December to 134.8 in May: a roof in St Andrews makes 6 times as much in its best month as in its darkest, and 983 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 28.5 |
| February | 48.9 |
| March | 84 |
| April | 118 |
| May | 135 |
| June | 123 |
| July | 126 |
| August | 111 |
| September | 88.3 |
| October | 58.9 |
| November | 38.9 |
| December | 22.6 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 983 kWh per kWp in St Andrews against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts St Andrews 6% above it.
How St Andrews compares
Small towns rarely get published solar figures, so here are the numbers for St Andrews. It is one of 10 Fife towns we track, and it ranks 1st of 10 for solar yield, a town of 12,066 people in the House of Commons Library settlement data. PVGIS gives its roofs 983 kWh per kWp a year, 2.69 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £885 of year one benefit, £247 of it from your own generation and £638 from export at 12p.
Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on St Andrews' own yield.
St Andrews sits within Fife, its local planning authority, and the House of Commons Library classes it as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for St Andrews at 56.33941, -2.79503 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
Connecting solar to the St Andrews network
St Andrews sits in SP Energy Networks' South and Central Scotland licence area, so SP Energy Networks is the network operator (DNO) any solar panels or battery here are registered with.
Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to SP Energy Networks within 28 days of commissioning, with no prior approval.
Anything bigger is a G99 case and is applied for first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in St Andrews
A heat pump in St Andrews
Solar and a heat pump pull in opposite directions through the year: St Andrews' roofs make 880 kWh from November to February on a 12-panel system, and 3,150 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
Scottish homes apply through Home Energy Scotland rather than the Boiler Upgrade Scheme: up to £7,500 in grant for a heat pump, up to £7,500 more as an optional interest-free loan, and a £1,500 uplift for rural and island homes (checked 28 September 2026).
Charging an EV in St Andrews
A 12-panel roof in St Andrews makes about 860 kWh in May. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in St Andrews
Guidance is nationwide, so the benchmarks hold in St Andrews: repair costs, service scope, and when the inverter is the real fault.
Solar in St Andrews: your questions answered
What could a roof in St Andrews generate?
PVGIS puts a roof in St Andrews at 983 kWh per kWp a year, 2.69 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,250 kWh a year, most of it between April and September.
How much are solar panels in St Andrews?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in St Andrews before a battery. What St Andrews changes is the return, about 6,250 kWh a year from that system, and your design call prices your actual roof.
Do I need permission from the DNO for solar in St Andrews?
Usually not in advance. SP Energy Networks, the network operator for St Andrews, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator. "See our DNO explainer.
How much can I earn from exporting solar in St Andrews?
With typical use and no battery, a 12-panel system in St Andrews exports about 5,315 kWh a year. At 12p per kWh that is roughly £638; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Do solar panels work in winter in St Andrews?
Yes, at a lower level. PVGIS gives St Andrews 22.6 kWh per kWp in December and 28.5 in January, so a 12-panel system makes about 140 kWh and 180 kWh in those months, against 860 kWh in May. Winter output mostly covers daytime use rather than exporting.
How St Andrews compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs St Andrews |
|---|---|---|
| St Andrews | 983 | this town |
| Cupar | 940 | −43 kWh |
| Broughty Ferry | 917 | −66 kWh |
| Monifieth | 909 | −74 kWh |
| Dundee | 935 | −48 kWh |
| Carnoustie | 921 | −62 kWh |
| Leven | 894 | −89 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for St Andrews
Sourced, dated and written by us. The same ground we cover on your free call.
How many solar panels do I need? The honest way to count
One panel is 2.26 square metres. The rest is measuring your roof honestly.
Read the guide →Which battery size band does your home fall into?
Where UK homes actually land, why oversizing costs you, and what shifts the band.
Read the guide →Three phase and EV charging: what actually changes
Three phase buys 22kW charging. Most cars cannot use it, and load balancing usually solves the real problem.
Read the guide →Are heat pumps worth it? The real 2026 numbers
Electricity costs 3.3x gas per kWh. A heat pump is about 3x as efficient. The numbers nearly cancel out.
Read the guide →Choosing a tariff when you have solar, a battery and an EV
Solar, battery and EV want different tariffs. How to work out which one to protect.
Read the guide →What MCS certification actually is, and why your export payments depend on it
The badge that decides whether your solar earns export payments. It cannot be added later.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.