Solar panels in Newtown, with the numbers shown.
A 12-panel roof in Newtown makes about 5,800 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in Newtown can generate
From 24.2 kWh per kWp in December to 116.8 in May: a roof in Newtown makes 4.8 times as much in its best month as in its darkest, and 912 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 27.1 |
| February | 44.9 |
| March | 79.9 |
| April | 109 |
| May | 117 |
| June | 115 |
| July | 115 |
| August | 101 |
| September | 85.7 |
| October | 57.3 |
| November | 37.2 |
| December | 24.2 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 912, Newtown is 1% below it.
How Newtown compares
Small towns rarely get published solar figures, so here are the numbers for Newtown. It is the only Montgomeryshire town we track so far, with county rankings to follow as its neighbours land, a town of 11,087 people in the House of Commons Library settlement data. PVGIS gives its roofs 912 kWh per kWp a year, 2.50 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £831 of year one benefit, £247 of it from your own generation and £584 from export at 12p.
Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Newtown's own yield.
Newtown sits within Powys, its local planning authority, and the House of Commons Library classes it as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Newtown at 52.51171, -3.31969 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
Connecting solar to the Newtown network
SP Energy Networks owns and runs the local electricity network in Newtown, as part of its North Wales, Merseyside and Cheshire licence area.
For a typical home the paperwork is light: a system of up to 3.68kW per phase goes through G98, which means SP Energy Networks is notified within 28 days of switch-on rather than asked beforehand.
Anything bigger is a G99 case and is applied for first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in Newtown
A heat pump in Newtown
Solar and a heat pump pull in opposite directions through the year: Newtown's roofs make 850 kWh from November to February on a 12-panel system, and 2,840 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
Grant support in Wales comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Newtown
From April to September, 70% of a Newtown roof's yearly output arrives, peaking at about 740 kWh in May on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Newtown
Guidance is nationwide, so the benchmarks hold in Newtown: repair costs, service scope, and when the inverter is the real fault.
Solar in Newtown: your questions answered
What could a roof in Newtown generate?
PVGIS puts a roof in Newtown at 912 kWh per kWp a year, 2.50 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 5,800 kWh a year, most of it between April and September.
How much are solar panels in Newtown?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Newtown before a battery. What Newtown changes is the return, about 5,800 kWh a year from that system, and your design call prices your actual roof.
Do I need permission from the DNO for solar in Newtown?
Usually not in advance. SP Energy Networks, the network operator for Newtown, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator. "See our DNO explainer.
How much can I earn from exporting solar in Newtown?
With typical use and no battery, a 12-panel system in Newtown exports about 4,864 kWh a year. At 12p per kWh that is roughly £584; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Do solar panels work in winter in Newtown?
Yes, at a lower level. PVGIS gives Newtown 24.2 kWh per kWp in December and 27.1 in January, so a 12-panel system makes about 150 kWh and 170 kWh in those months, against 740 kWh in May. Winter output mostly covers daytime use rather than exporting.
How Newtown compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Newtown |
|---|---|---|
| Newtown | 912 | this town |
| Croesoswallt | 968 | +56 kWh |
| Ludlow | 970 | +58 kWh |
| Shrewsbury | 969 | +57 kWh |
| Leominster | 984 | +72 kWh |
| Aberystwyth | 947 | +35 kWh |
| Rhosllannerchrugog | 957 | +45 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for Newtown: Solar panels in Newtown from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Newtown
Sourced, dated and written by us. The same ground we cover on your free call.
Best solar panels UK 2026: what the datasheets actually say
One pick per job, the specs behind each, and what moves payback more than the badge.
Read the guide →What a battery gateway actually does
Without a gateway your system shuts down when the grid does. Here is what the box actually does.
Read the guide →Charging an EV from your own solar
Every surplus kWh is 3.6 to 5 miles. Whether that beats a 7p overnight rate is arithmetic.
Read the guide →The Boiler Upgrade Scheme, explained
A fixed amount, claimed on your behalf by our installation teams, with a real deadline on the £9,000 version.
Read the guide →What the Smart Export Guarantee actually is
The scheme obliges suppliers to pay above zero, and leaves the rate to them.
Read the guide →MCS, HIES, RECC, NAPIT, TrustMark and Flexi-Orb: which badge does what
Six logos, six different jobs. What each scheme covers, and which are actually required.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.