0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Herefordshire

Solar panels in Leominster, with the numbers shown.

Twelve panels (6.36 kWp) here make about 6,260 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Leominster

What a roof in Leominster can generate

PVGIS puts Leominster at 984 kWh per kWp a year, 1% below our Herefordshire county estimate. 68% of it arrives between April and September, peaking in May.

Map showing Leominster in Herefordshire A simplified outline map of Herefordshire with neighbouring counties shown faintly, and a pin marking the location of Leominster.
Leominster in Herefordshire

Generation per kWp, month by month

Leominster, 984 kWh per kWp a year
Leominster, monthly generation per kWp Bar chart, twelve months January to December. Peak May at 123 kWh/kWp. Lowest December at 32.2 kWh/kWp. Full values are in the table below this chart. 141 0 JFMAMJJASOND 123
Show the monthly figures
Leominster, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January36
February52.6
March85.8
April112
May123
June120
July121
August106
September92.1
October61.8
November41.8
December32.2

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

6,260kWh a year, 12 panels
780kWh in May, the peak
200kWh in December

Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 984, Leominster is 6% above it.

How Leominster compares

Small towns rarely get published solar figures, so here are the numbers for Leominster. It is one of 4 Herefordshire towns we track, and it ranks 3rd of 4 for solar yield, a town of 11,230 people in the House of Commons Library settlement data. PVGIS gives its roofs 984 kWh per kWp a year, 2.70 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £886 of year one benefit, £247 of it from your own generation and £639 from export at 12p.

Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Leominster's own yield.

Leominster sits within County of Herefordshire, its local planning authority, and the House of Commons Library classes it as a small town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£885
£74 a month · payback 7.2 yrs
System price, installed
£6,360
Simple payback
7.2 yrs
Generates a year
6,258 kWh
Exported
5,322 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Generation is modelled from PVGIS satellite data for Leominster's own coordinates (52.22493, -2.74347), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.

Local grid

Connecting solar to the Leominster network

Leominster sits in National Grid Electricity Distribution's West Midlands licence area, so NGED is the network operator (DNO) any solar panels or battery here are registered with.

G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, NGED only has to be told within 28 days after the system is commissioned.

A bigger inverter or battery output needs a G99 application in advance. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.

Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

A stone-built UK bungalow with a full all-black solar panel array across the roof pitch
An all-black panel array fitted flush across a stone bungalow's roof.
Beyond solar

Beyond the panels: heating and car charging in Leominster

A heat pump in Leominster

Solar and a heat pump pull in opposite directions through the year: Leominster's roofs make 1,030 kWh from November to February on a 12-panel system, and 2,990 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.

Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in Leominster

From April to September, 68% of a Leominster roof's yearly output arrives, peaking at about 780 kWh in May on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.

The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).

EV charging explained

Already got panels?

Solar panel servicing and repair in Leominster

Guidance is nationwide, so the benchmarks hold in Leominster: repair costs, service scope, and when the inverter is the real fault.

FAQs

Solar in Leominster: your questions answered

What could a roof in Leominster generate?

PVGIS puts a roof in Leominster at 984 kWh per kWp a year, 2.70 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,260 kWh a year, most of it between April and September.

How much are solar panels in Leominster?

The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Leominster before a battery. What Leominster changes is the return, about 6,260 kWh a year from that system, and your design call prices your actual roof.

Do I need permission from the DNO for solar in Leominster?

Usually not in advance. NGED, the network operator for Leominster, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. "See our DNO explainer.

How much can I earn from exporting solar in Leominster?

With typical use and no battery, a 12-panel system in Leominster exports about 5,322 kWh a year. At 12p per kWh that is roughly £639; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.

Do solar panels work in winter in Leominster?

Yes, at a lower level. PVGIS gives Leominster 32.2 kWh per kWp in December and 36 in January, so a 12-panel system makes about 200 kWh and 230 kWh in those months, against 780 kWh in May. Winter output mostly covers daytime use rather than exporting.

How Leominster compares with its neighbours

The six closest towns we publish, run through the identical PVGIS query as Leominster.

TownkWh per kWp a yearvs Leominster
Leominster984this town
Ludlow970−14 kWh
Hereford994+10 kWh
Ledbury1,006+22 kWh
Great Malvern996+12 kWh
Bewdley978−6 kWh
Stourport-on-Severn990+6 kWh

Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.

Also for Leominster: Solar panels in Leominster from OVO Solar & Battery

All of Herefordshire

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Leominster. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.