Solar panels in Staveley, priced before anyone visits.
About 6,090 kWh a year from 12 panels in Staveley, £6,360 installed, with your system designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Staveley roof makes, month by month
Staveley's best month is May, at 120.5 kWh per kWp; December manages 30.8. Over the year that comes to 957 kWh per kWp, 1% above our Derbyshire county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 32.9 |
| February | 49.8 |
| March | 83.9 |
| April | 108 |
| May | 121 |
| June | 113 |
| July | 118 |
| August | 109 |
| September | 90.2 |
| October | 59.6 |
| November | 40.7 |
| December | 30.8 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Staveley makes 957 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Staveley is 3% above it.
How Staveley compares
Small towns rarely get published solar figures, so here are the numbers for Staveley. It is one of 28 Derbyshire towns we track, and it ranks joint 18th of 28 for solar yield, a town of 15,404 people in the House of Commons Library settlement data. PVGIS gives its roofs 957 kWh per kWp a year, 2.62 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £865 of year one benefit, £247 of it from your own generation and £618 from export at 12p.
Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Staveley's own yield.
Planning applications here go through Chesterfield; nationally, the House of Commons Library classes Staveley as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Staveley at 53.26224, -1.35879 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
The network operator for Staveley
The distribution network operator (DNO) for Staveley is National Grid Electricity Distribution (NGED), which runs the East Midlands licence area.
G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, NGED only has to be told within 28 days after the system is commissioned.
Larger systems go through G99 instead, applied for before installation. On timing: NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in Staveley
A heat pump in Staveley
Heating demand peaks when solar is weakest. In Staveley, a 12-panel system makes about 200 kWh in December and 210 kWh in January, a fraction of its 770 kWh in May, which is why a heat pump here is costed on its tariff first.
The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).
Charging an EV in Staveley
Summer is where a car earns its place. In May, 12 panels in Staveley make about 770 kWh, against roughly 70 kWh a typical home uses in daylight that month on our calculator's typical-use settings, so there is surplus a smart charger can put into the car instead of exporting it.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Staveley
The same sourced benchmarks apply in Staveley as everywhere we cover: honest repair pricing and what a service should include.
Solar in Staveley: your questions answered
How much electricity do solar panels make in Staveley?
About 6,090 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Staveley: 957 kWh per kWp, or 2.62 peak sun hours a day on average. May is the strongest month, at about 770 kWh.
What does a typical solar system cost in Staveley?
Solar is priced at £1,000 per kWp installed wherever you live, so a 12-panel, 6.36 kWp system costs £6,360 in Staveley, exactly as it would anywhere else, before any battery. Location changes what the system makes, not what it costs: here that is about 6,090 kWh a year. The final figure comes from your roof on the design call.
Which DNO covers Staveley, and what does it need from me?
National Grid Electricity Distribution (NGED) covers Staveley. A home system of up to 3.68kW per phase is notified to NGED within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
What happens to the solar I do not use in Staveley?
Around £618 a year at 12p per kWh, for the roughly 5,150 kWh a 12-panel system in Staveley exports with typical use. Rates vary by supplier and some need their own tariff; the export rates table is dated and sourced.
How much solar does Staveley get in December?
December is the low point: about 200 kWh from a 12-panel system in Staveley, on PVGIS data, rising to 770 kWh in May. From November to February the same system makes about 980 kWh in total, which is why a battery charged off-peak does more of the work in winter.
How Staveley compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Staveley |
|---|---|---|
| Staveley | 957 | this town |
| Brimington | 954 | −3 kWh |
| Bolsover | 962 | +5 kWh |
| Chesterfield | 957 | level |
| Clowne | 972 | +15 kWh |
| Killamarsh | 957 | level |
| North Wingfield and Holmewood | 954 | −3 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Staveley: Solar panels in Staveley from OVO Solar & Battery
Also near Staveley
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Staveley
Sourced, dated and written by us. The same ground we cover on your free call.
0% VAT on solar and batteries: what qualifies, and what does not
Zero VAT until 31 March 2027, then 5% returns. What qualifies, and what it is worth.
Read the guide →Whole home backup or partial backup? The runtime arithmetic
Whole home backup sounds obvious until you do the runtime maths. Here is how to choose the right tier.
Read the guide →Charging an EV from your own solar
Every surplus kWh is 3.6 to 5 miles. Whether that beats a 7p overnight rate is arithmetic.
Read the guide →How much does a heat pump cost? The 2026 numbers, before and after the grant
UK median installed cost around £12,908, before the up to £7,500 grant comes off.
Read the guide →Why the best export rates always carry conditions
The top export rates are acquisition offers. Here is how to price the condition.
Read the guide →HIES explained: what the badge actually protects, and when
What HIES protects: deposits up to 25 percent capped at 5,000 pounds, and your workmanship guarantee.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.