0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Derbyshire

Solar panels in Clowne, with the numbers shown.

About 6,180 kWh a year from 12 panels in Clowne, £6,360 installed, with your system designed on a free 30-minute video call.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Clowne

Clowne's solar year

PVGIS puts Clowne at 972 kWh per kWp a year, 3% above our Derbyshire county estimate. 68% of it arrives between April and September, peaking in May.

Map showing Clowne in Derbyshire A simplified outline map of Derbyshire with neighbouring counties shown faintly, and a pin marking the location of Clowne.
Clowne in Derbyshire

Generation per kWp, month by month

Clowne, 972 kWh per kWp a year
Clowne, monthly generation per kWp Bar chart, twelve months January to December. Peak May at 122 kWh/kWp. Lowest December at 32.8 kWh/kWp. Full values are in the table below this chart. 141 0 JFMAMJJASOND 122
Show the monthly figures
Clowne, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January33.6
February51
March85
April109
May122
June114
July119
August110
September91.3
October61.4
November42.5
December32.8

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

6,180kWh a year, 12 panels
780kWh in May, the peak
210kWh in December

Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 972, Clowne is 5% above it.

How Clowne compares

Small towns rarely get published solar figures, so here are the numbers for Clowne. It is one of 28 Derbyshire towns we track, and it ranks 6th of 28 for solar yield, a town of 7,793 people in the House of Commons Library settlement data. PVGIS gives its roofs 972 kWh per kWp a year, 2.66 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £876 of year one benefit, £247 of it from your own generation and £629 from export at 12p.

Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Clowne's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.

Bolsover is the planning authority covering Clowne, which the House of Commons Library classes as a small town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£876
£73 a month · payback 7.3 yrs
System price, installed
£6,360
Simple payback
7.3 yrs
Generates a year
6,182 kWh
Exported
5,245 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Modelled for Clowne at 53.27487, -1.2607 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.

Local grid

Who runs the grid in Clowne

The distribution network operator (DNO) for Clowne is National Grid Electricity Distribution (NGED), which runs the East Midlands licence area.

G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, NGED only has to be told within 28 days after the system is commissioned.

A bigger inverter or battery output needs a G99 application in advance. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.

Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Aerial view of a red-brick new-build home with a dark solar panel array on the front roof pitch
A dense panel array fitted to a new-build home's front roof pitch.
Beyond solar

Heat pumps and EV charging in Clowne

A heat pump in Clowne

A heat pump does most of its work from November to February. Over those four months, 12 panels in Clowne make about 1,020 kWh, against 2,960 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.

In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in Clowne

From April to September, 68% of a Clowne roof's yearly output arrives, peaking at about 780 kWh in May on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.

Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.

EV charging explained

Already got panels?

Solar panel servicing and repair in Clowne

Faults, servicing and ageing inverters follow the same economics in Clowne as anywhere else, and the guides below price them plainly.

FAQs

Clowne solar questions

What does a solar panel system produce in Clowne?

Each kWp of panels in Clowne makes 972 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,180 kWh, from about 210 kWh in December up to 780 kWh in May.

What would 12 solar panels cost in Clowne?

£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Clowne differs is output: about 6,180 kWh a year from that system.

Would a system in Clowne need approval from the network operator?

Clowne is on National Grid Electricity Distribution's network (East Midlands licence area). Systems up to 3.68kW per phase of inverter output follow G98: NGED is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. Our G98 vs G99 guide explains both routes.

How much would export pay on a system in Clowne?

It is exported. With typical use and no battery, about 5,245 kWh of the 6,180 kWh a 12-panel system makes in Clowne goes to the grid, around £629 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.

Is solar worth it in Clowne in winter?

It works, but the year is lopsided. 68% of a Clowne roof's output lands between April and September; the four months from November to February give about 1,020 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.

How Clowne compares with its neighbours

How the towns nearest Clowne compare on the same PVGIS settings, closest first.

TownkWh per kWp a yearvs Clowne
Clowne972this town
Bolsover962−10 kWh
Killamarsh957−15 kWh
Staveley957−15 kWh
Shirebrook966−6 kWh
Brimington954−18 kWh
Worksop959−13 kWh

PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.

Also for Clowne: Solar panels in Clowne from OVO Solar & Battery

All of Derbyshire

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Clowne. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.