Solar panels in Stourport-on-Severn, with the numbers shown.
About 6,300 kWh a year from 12 panels in Stourport-on-Severn, £6,360 installed, with your system designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in Stourport-on-Severn can generate
Stourport-on-Severn's best month is July, at 122.4 kWh per kWp; December manages 34.4. Over the year that comes to 990 kWh per kWp, 1% below our Worcestershire county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 36.4 |
| February | 52.7 |
| March | 86.6 |
| April | 112 |
| May | 122 |
| June | 120 |
| July | 122 |
| August | 107 |
| September | 92.5 |
| October | 63.3 |
| November | 42.4 |
| December | 34.4 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 990 kWh per kWp in Stourport-on-Severn against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Stourport-on-Severn 7% above it.
How Stourport-on-Severn compares
Small towns rarely get published solar figures, so here are the numbers for Stourport-on-Severn. It is one of 13 Worcestershire towns we track, and it ranks 6th of 13 for solar yield, a town of 20,593 people in the House of Commons Library settlement data. PVGIS gives its roofs 990 kWh per kWp a year, 2.71 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £890 of year one benefit, £247 of it from your own generation and £643 from export at 12p.
Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Stourport-on-Severn's own yield.
Stourport-on-Severn sits within Wyre Forest, its local planning authority, and the House of Commons Library classes it as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Stourport-on-Severn (52.34104, -2.28177), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
Connecting solar to the Stourport-on-Severn network
National Grid Electricity Distribution (NGED) owns and runs the local electricity network in Stourport-on-Severn, as part of its West Midlands licence area.
What decides the paperwork is the inverter and battery output, not the number of panels. Up to 3.68kW per phase, a system follows G98: NGED is notified within 28 days of commissioning and nothing has to be approved first.
A bigger inverter or battery output needs a G99 application in advance. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in Stourport-on-Severn
A heat pump in Stourport-on-Severn
Solar and a heat pump pull in opposite directions through the year: Stourport-on-Severn's roofs make 1,060 kWh from November to February on a 12-panel system, and 2,990 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Stourport-on-Severn
From April to September, 68% of a Stourport-on-Severn roof's yearly output arrives, peaking at about 780 kWh in July on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
Installed prices, the same in every town
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Stourport-on-Severn
Guidance is nationwide, so the benchmarks hold in Stourport-on-Severn: repair costs, service scope, and when the inverter is the real fault.
Common questions about solar in Stourport-on-Severn
What could a roof in Stourport-on-Severn generate?
PVGIS puts a roof in Stourport-on-Severn at 990 kWh per kWp a year, 2.71 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,300 kWh a year, most of it between April and September.
What would 12 solar panels cost in Stourport-on-Severn?
£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Stourport-on-Severn differs is output: about 6,300 kWh a year from that system.
Do I need permission from the DNO for solar in Stourport-on-Severn?
Usually not in advance. NGED, the network operator for Stourport-on-Severn, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. "See our DNO explainer.
How much would export pay on a system in Stourport-on-Severn?
It is exported. With typical use and no battery, about 5,360 kWh of the 6,300 kWh a 12-panel system makes in Stourport-on-Severn goes to the grid, around £643 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.
Do solar panels work in winter in Stourport-on-Severn?
Yes, at a lower level. PVGIS gives Stourport-on-Severn 34.4 kWh per kWp in December and 36.4 in January, so a 12-panel system makes about 220 kWh and 230 kWh in those months, against 780 kWh in July. Winter output mostly covers daytime use rather than exporting.
How Stourport-on-Severn compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Stourport-on-Severn |
|---|---|---|
| Stourport-on-Severn | 990 | this town |
| Bewdley | 978 | −12 kWh |
| Kidderminster | 982 | −8 kWh |
| Droitwich Spa | 993 | +3 kWh |
| Bromsgrove | 988 | −2 kWh |
| Stourbridge | 949 | −41 kWh |
| Catshill | 969 | −21 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Stourport-on-Severn: Solar panels in Stourport-on-Severn from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Stourport-on-Severn
Sourced, dated and written by us. The same ground we cover on your free call.
Why solar panels stop working, and how to work out which one it is
There is an order to this, and it starts at the inverter display rather than the roof.
Read the guide →Whole home backup or partial backup? The runtime arithmetic
Whole home backup sounds obvious until you do the runtime maths. Here is how to choose the right tier.
Read the guide →Home EV charger types and speeds, explained properly
Granny cable, 7kW wall unit or 22kW three phase. What each adds per hour, and which you need.
Read the guide →How an air source heat pump actually works
It moves heat rather than making it. The cycle, the efficiency numbers and the trade-offs.
Read the guide →What the Smart Export Guarantee actually is
The scheme obliges suppliers to pay above zero, and leaves the rate to them.
Read the guide →HIES explained: what the badge actually protects, and when
What HIES protects: deposits up to 25 percent capped at 5,000 pounds, and your workmanship guarantee.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.