Solar panels in Tiverton, priced before anyone visits.
A 12-panel roof in Tiverton makes about 6,470 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Sunlight in Tiverton, in numbers
From 34.8 kWh per kWp in December to 123.8 in May: a roof in Tiverton makes 3.6 times as much in its best month as in its darkest, and 1,017 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 38.5 |
| February | 55.3 |
| March | 90.7 |
| April | 118 |
| May | 124 |
| June | 121 |
| July | 123 |
| August | 108 |
| September | 94.8 |
| October | 64.7 |
| November | 45.2 |
| December | 34.8 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 1,017, Tiverton is 10% above it.
How Tiverton compares
Small towns rarely get published solar figures, so here are the numbers for Tiverton. It is one of 23 Devon towns we track, and it ranks 21st of 23 for solar yield, a town of 19,853 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,017 kWh per kWp a year, 2.79 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £911 of year one benefit, £247 of it from your own generation and £664 from export at 12p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Tiverton's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Planning applications here go through Mid Devon; nationally, the House of Commons Library classes Tiverton as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Tiverton at 50.90592, -3.47812 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
NGED and your Tiverton connection
The distribution network operator (DNO) for Tiverton is National Grid Electricity Distribution (NGED), which runs the South West England licence area.
G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, NGED only has to be told within 28 days after the system is commissioned.
Larger systems go through G99 instead, applied for before installation. On timing: NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Tiverton
A heat pump in Tiverton
In December, the darkest month here, 12 panels in Tiverton make about 220 kWh. That is when a heat pump runs hardest, so its running cost in Tiverton comes down to the tariff and the flow temperature rather than the roof.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Tiverton
Summer is where a car earns its place. In May, 12 panels in Tiverton make about 790 kWh, against roughly 70 kWh a typical home uses in daylight that month on our calculator's typical-use settings, so there is surplus a smart charger can put into the car instead of exporting it.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Tiverton
The same sourced benchmarks apply in Tiverton as everywhere we cover: honest repair pricing and what a service should include.
Solar in Tiverton: your questions answered
How much electricity do solar panels make in Tiverton?
About 6,470 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Tiverton: 1,017 kWh per kWp, or 2.79 peak sun hours a day on average. May is the strongest month, at about 790 kWh.
What does a typical solar system cost in Tiverton?
Solar is priced at £1,000 per kWp installed wherever you live, so a 12-panel, 6.36 kWp system costs £6,360 in Tiverton, exactly as it would anywhere else, before any battery. Location changes what the system makes, not what it costs: here that is about 6,470 kWh a year. The final figure comes from your roof on the design call.
Which DNO covers Tiverton, and what does it need from me?
National Grid Electricity Distribution (NGED) covers Tiverton. A home system of up to 3.68kW per phase is notified to NGED within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
What happens to the solar I do not use in Tiverton?
Around £664 a year at 12p per kWh, for the roughly 5,531 kWh a 12-panel system in Tiverton exports with typical use. Rates vary by supplier and some need their own tariff; the export rates table is dated and sourced.
How much solar does Tiverton get in December?
December is the low point: about 220 kWh from a 12-panel system in Tiverton, on PVGIS data, rising to 790 kWh in May. From November to February the same system makes about 1,110 kWh in total, which is why a battery charged off-peak does more of the work in winter.
How Tiverton compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Tiverton |
|---|---|---|
| Tiverton | 1,017 | this town |
| Cullompton | 1,026 | +9 kWh |
| Crediton | 1,020 | +3 kWh |
| Wellington | 1,008 | −9 kWh |
| Exeter | 1,060 | +43 kWh |
| Honiton | 1,060 | +43 kWh |
| Taunton | 1,026 | +9 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for Tiverton: Solar panels in Tiverton from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Tiverton
Sourced, dated and written by us. The same ground we cover on your free call.
Do you need planning permission for solar panels? Usually not
Usually not, provided the installation stays within the limits updated on 27 August 2026.
Read the guide →What a battery gateway actually does
Without a gateway your system shuts down when the grid does. Here is what the box actually does.
Read the guide →Home EV charger types and speeds, explained properly
Granny cable, 7kW wall unit or 22kW three phase. What each adds per hour, and which you need.
Read the guide →Do you need to replace your radiators for a heat pump?
Some change, most do not. The room by room arithmetic that decides which.
Read the guide →Why the best export rates always carry conditions
The top export rates are acquisition offers. Here is how to price the condition.
Read the guide →What MCS certification actually is, and why your export payments depend on it
The badge that decides whether your solar earns export payments. It cannot be added later.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.