Solar panels in Tring, sized to your roof.
A 12-panel roof in Tring makes about 6,390 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Tring's solar year
PVGIS puts Tring at 1,005 kWh per kWp a year, 1% below our Hertfordshire county estimate. 68% of it arrives between April and September, peaking in July.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 38 |
| February | 51.1 |
| March | 87.3 |
| April | 113 |
| May | 121 |
| June | 121 |
| July | 124 |
| August | 110 |
| September | 95.2 |
| October | 65 |
| November | 44.7 |
| December | 34.5 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 1,005, Tring is 9% above it.
How Tring compares
Small towns rarely get published solar figures, so here are the numbers for Tring. It is one of 27 Hertfordshire towns we track, and it ranks 27th of 27 for solar yield, a town of 12,612 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,005 kWh per kWp a year, 2.75 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £902 of year one benefit, £247 of it from your own generation and £655 from export at 12p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Tring's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Dacorum is the planning authority covering Tring, which the House of Commons Library classes as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Tring at 51.7975, -0.66212 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
Who runs the grid in Tring
Tring sits in UK Power Networks' East England licence area, so UK Power Networks is the network operator (DNO) any solar panels or battery here are registered with.
G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, UK Power Networks only has to be told within 28 days after the system is commissioned.
Anything bigger is a G99 case and is applied for first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Tring
A heat pump in Tring
A heat pump does most of its work from November to February. Over those four months, 12 panels in Tring make about 1,070 kWh, against 3,030 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Tring
A 12-panel roof in Tring makes about 790 kWh in July. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
Installed prices, the same in every town
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Tring
Faults, servicing and ageing inverters follow the same economics in Tring as anywhere else, and the guides below price them plainly.
Tring solar questions
What does a solar panel system produce in Tring?
Each kWp of panels in Tring makes 1,005 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,390 kWh, from about 220 kWh in December up to 790 kWh in July.
How much are solar panels in Tring?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Tring before a battery. What Tring changes is the return, about 6,390 kWh a year from that system, and your design call prices your actual roof.
Would a system in Tring need approval from the network operator?
Tring is on UK Power Networks' network (East England licence area). Systems up to 3.68kW per phase of inverter output follow G98: UK Power Networks is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator. Our G98 vs G99 guide explains both routes.
How much can I earn from exporting solar in Tring?
With typical use and no battery, a 12-panel system in Tring exports about 5,455 kWh a year. At 12p per kWh that is roughly £655; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Is solar worth it in Tring in winter?
It works, but the year is lopsided. 68% of a Tring roof's output lands between April and September; the four months from November to February give about 1,070 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.
How Tring compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Tring |
|---|---|---|
| Tring | 1,005 | this town |
| Wendover | 1,000 | −5 kWh |
| Berkhamsted | 1,007 | +2 kWh |
| Chesham | 1,009 | +4 kWh |
| Aylesbury | 995 | −10 kWh |
| Prestwood and Great Missenden | 1,002 | −3 kWh |
| Leighton Buzzard | 1,012 | +7 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for Tring: Solar panels in Tring from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Tring
Sourced, dated and written by us. The same ground we cover on your free call.
What is a DNO, and why does a company you have never heard of get a say in your solar?
The company that owns your street's cables decides what solar you can connect.
Read the guide →Tesla Powerwall 3 against the alternatives, and where each one wins
The strongest single box in the market, and the houses it is still wrong for.
Read the guide →Charging an EV from your own solar
Every surplus kWh is 3.6 to 5 miles. Whether that beats a 7p overnight rate is arithmetic.
Read the guide →Are heat pumps noisy? The 37 dB(A) answer, in plain terms
The 1 metre boundary rule is gone. A 37 dB(A) sound test replaced it.
Read the guide →Which tariffs are actually built for battery charging
A battery buys cheap and uses dear. The tariff decides how much that is worth.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.