Solar panels in Wellingborough, with the numbers shown.
About 6,500 kWh a year from 12 panels in Wellingborough, £6,360 installed, with your system designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Wellingborough's solar year
From 36.6 kWh per kWp in December to 124.1 in July: a roof in Wellingborough makes 3.4 times as much in its best month as in its darkest, and 1,022 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 38.5 |
| February | 54.1 |
| March | 89.2 |
| April | 114 |
| May | 123 |
| June | 121 |
| July | 124 |
| August | 112 |
| September | 96.2 |
| October | 66.3 |
| November | 46.9 |
| December | 36.6 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 1,022, Wellingborough is 10% above it.
How Wellingborough compares
Among the places we publish figures for, Wellingborough is one of 16 Northamptonshire towns we track, and it ranks joint 8th of 16 for solar yield. It is a medium town in the House of Commons Library classification, with 56,295 residents, and its roofs see 2.80 peak sun hours a day across the year. That drives the standard 12 panel model to 6,500 kWh of generation, of which around 5,563 kWh is exported at 12p for £668 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Wellingborough's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
North Northamptonshire is the planning authority covering Wellingborough, which the House of Commons Library classes as a medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for Wellingborough's own coordinates (52.30512, -0.70281), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
Who runs the grid in Wellingborough
Wellingborough sits in National Grid Electricity Distribution's East Midlands licence area, so NGED is the network operator (DNO) any solar panels or battery here are registered with.
G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, NGED only has to be told within 28 days after the system is commissioned.
Anything bigger is a G99 case and is applied for first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Wellingborough
A heat pump in Wellingborough
A heat pump does most of its work from November to February. Over those four months, 12 panels in Wellingborough make about 1,120 kWh, against 3,050 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.
The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).
Charging an EV in Wellingborough
From April to September, 68% of a Wellingborough roof's yearly output arrives, peaking at about 790 kWh in July on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
Installed prices, the same in every town
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Wellingborough
Faults, servicing and ageing inverters follow the same economics in Wellingborough as anywhere else, and the guides below price them plainly.
Wellingborough solar questions
What does a solar panel system produce in Wellingborough?
Each kWp of panels in Wellingborough makes 1,022 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,500 kWh, from about 230 kWh in December up to 790 kWh in July.
What would 12 solar panels cost in Wellingborough?
£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Wellingborough differs is output: about 6,500 kWh a year from that system.
Would a system in Wellingborough need approval from the network operator?
Wellingborough is on National Grid Electricity Distribution's network (East Midlands licence area). Systems up to 3.68kW per phase of inverter output follow G98: NGED is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. Our G98 vs G99 guide explains both routes.
How much would export pay on a system in Wellingborough?
It is exported. With typical use and no battery, about 5,563 kWh of the 6,500 kWh a 12-panel system makes in Wellingborough goes to the grid, around £668 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.
Is solar worth it in Wellingborough in winter?
It works, but the year is lopsided. 68% of a Wellingborough roof's output lands between April and September; the four months from November to February give about 1,120 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.
How Wellingborough compares with its neighbours
How the towns nearest Wellingborough compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Wellingborough |
|---|---|---|
| Wellingborough | 1,022 | this town |
| Irthlingborough | 1,021 | −1 kWh |
| Burton Latimer | 1,021 | −1 kWh |
| Rushden | 1,026 | +4 kWh |
| Higham Ferrers | 1,024 | +2 kWh |
| Kettering | 1,022 | level |
| Raunds | 1,031 | +9 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Wellingborough: Solar panels in Wellingborough from OVO Solar & Battery
Also near Wellingborough
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Wellingborough homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
How long does a solar inverter last, and when does replacing it make sense?
The one component you should expect to replace, and the decision tree when it goes.
Read the guide →Does a standalone battery actually pay back?
No panels means one job: buy cheap, use later. The tariff decides whether it pays.
Read the guide →What an EV charger installation actually involves
Main fuse, DNO notification, load balancing and the paperwork. What really happens.
Read the guide →Are air source heat pumps any good? What owners actually report
The UK's largest survey found 80% of heat pump owners satisfied, against 70% for gas boilers.
Read the guide →The price cap explained, and what it does to solar payback
The cap limits unit rates, not bills. That changes what solar payback means.
Read the guide →HIES explained: what the badge actually protects, and when
What HIES protects: deposits up to 25 percent capped at 5,000 pounds, and your workmanship guarantee.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.