Solar and batteries in Cheshire, sized to your roof.
A 12-panel roof in Cheshire makes about 6,000 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Cheshire roof makes, month by month
From 30.1 kWh per kWp in December to 120.6 in May: a roof in Cheshire makes 4 times as much in its best month as in its darkest, and 944 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 30.7 |
| February | 50.4 |
| March | 83.8 |
| April | 109 |
| May | 121 |
| June | 115 |
| July | 115 |
| August | 104 |
| September | 86.8 |
| October | 59.4 |
| November | 39.3 |
| December | 30.1 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 944, Cheshire is 2% above it.
How Cheshire compares
Cheshire ranks joint 38th of the 85 counties we track for solar yield, 5% below the England average of our estimates. At 2.59 peak sun hours a day the sums lean on a healthy mix: £247 of the year one benefit here comes from solar you use yourself, with export at 12p adding £608.
Every figure here assumes a clear, south-facing roof at 35 degrees in the middle of Cheshire. Yours will differ; the calculator below lets you test panels, batteries and export rates first.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation from PVGIS v5.2 (European Commission JRC, SARAH3), retrieved August 2026 for a representative point in Cheshire (53.233, -2.5073), assuming 1 kWp, 14% system loss, 35 degree pitch, due south. Import valued at 26.32p/kWh (Ofgem price cap average, Oct to Dec 2026); off-peak charging at 8.5p/kWh where used (a supplier's published off-peak rate, checked September 2026); export at the scenario you pick, from the dated tariff table. Prices are installed pricing, August 2026, standard installations; 530W LONGi panels at £1,000 per kWp. Estimates for illustration, not a quote: your free design call prices your actual roof.
SP Energy Networks and your Cheshire connection
SP Energy Networks is the distribution network operator (DNO) for Cheshire across most of the county, running its North Wales, Merseyside and Cheshire licence area.
What decides the paperwork is the inverter and battery output, not the number of panels. Up to 3.68kW per phase, a system follows G98: SP Energy Networks is notified within 28 days of commissioning and nothing has to be approved first.
Above that, G99 means applying before the work is booked. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator.
Parts of Cheshire are on a different network: some of its towns are served by Electricity North West and NGED. Each town page names its own operator, worked out from that town's own location.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in Cheshire
A heat pump in Cheshire
In December, the darkest month here, 12 panels in Cheshire make about 190 kWh. That is when a heat pump runs hardest, so its running cost in Cheshire comes down to the tariff and the flow temperature rather than the roof.
The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).
Charging an EV in Cheshire
Cheshire's May output, about 770 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
Installed prices, the same across Cheshire
Every system is designed around your roof on the free call before anything is fitted.
Common questions about solar in Cheshire
How much electricity do solar panels make in Cheshire?
About 6,000 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Cheshire: 944 kWh per kWp, or 2.59 peak sun hours a day on average. May is the strongest month, at about 770 kWh.
Is solar more expensive in Cheshire?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Cheshire, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,000 kWh a year here, which is what drives payback.
Which DNO covers Cheshire, and what does it need from me?
SP Energy Networks covers the centre of Cheshire. A home system of up to 3.68kW per phase is notified to SP Energy Networks within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator.
What could I earn from exporting in Cheshire?
On the 12p export scenario, a 12-panel system in Cheshire sends about 5,067 kWh a year to the grid, worth around £608. The export rates table compares what each supplier pays.
How much solar does Cheshire get in December?
December is the low point: about 190 kWh from a 12-panel system in Cheshire, on PVGIS data, rising to 770 kWh in May. From November to February the same system makes about 960 kWh in total, which is why a battery charged off-peak does more of the work in winter.
Towns we cover in Cheshire
45 Cheshire towns have their own page, each with PVGIS figures, a network operator and a monthly curve for its own location.
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Cheshire homeowners
The same guidance we would talk through on your call, written down and sourced.
How long do solar panels last? 25 to 30 years, in practice
The panels outlast the inverter by a wide margin. Plan for that, not for cleaning.
Read the guide →What a battery gateway actually does
Without a gateway your system shuts down when the grid does. Here is what the box actually does.
Read the guide →How time of use charging windows actually work
How a cheap overnight window is metered and billed, and what a battery does inside it.
Read the guide →What MCS certification actually buys you on a heat pump job
The gate on the £7,500 grant, the design standard behind your running costs, and the noise sign-off.
Read the guide →Choosing a tariff when you have solar, a battery and an EV
Solar, battery and EV want different tariffs. How to work out which one to protect.
Read the guide →NAPIT, NICEIC and competent person schemes: who tells building control about your solar
Solar work is notifiable. A competent person scheme means your installation team notifies, not you.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.