Solar and batteries in Lancashire, sized to your roof.
Twelve panels (6.36 kWp) here make about 5,510 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Lancashire's solar year
PVGIS puts Lancashire at 866 kWh per kWp a year, 6% below the mean of our 85 county estimates. 70% of it arrives between April and September, peaking in May.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 24.4 |
| February | 44.9 |
| March | 75.7 |
| April | 104 |
| May | 115 |
| June | 109 |
| July | 109 |
| August | 94.8 |
| September | 78.5 |
| October | 53.2 |
| November | 35.1 |
| December | 23.3 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 866, Lancashire is 6% below it.
How Lancashire compares
Lancashire ranks 58th of the 85 counties we track for solar yield. Self use does the heavy lifting here: of the £795 year one benefit on a typical 12 panel system, £247 comes from replacing 26.32p imports with your own generation, which is why battery sizing matters more than panel count.
Treat these as calibration rather than a quote. The calculator below opens on Lancashire's own PVGIS yield and prices a 12 panel system at £6,360 installed before any battery; your free design call reworks every number for your roof.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation from PVGIS v5.2 (European Commission JRC, SARAH3), retrieved August 2026 for a representative point in Lancashire (53.7073, -2.5989), assuming 1 kWp, 14% system loss, 35 degree pitch, due south. Import valued at 26.32p/kWh (Ofgem price cap average, Oct to Dec 2026); off-peak charging at 8.5p/kWh where used (a supplier's published off-peak rate, checked September 2026); export at the scenario you pick, from the dated tariff table. Prices are installed pricing, August 2026, standard installations; 530W LONGi panels at £1,000 per kWp. Estimates for illustration, not a quote: your free design call prices your actual roof.
Who runs the grid in Lancashire
On NESO's licence-area map, the middle of Lancashire falls in North West England, which Electricity North West operates.
What decides the paperwork is the inverter and battery output, not the number of panels. Up to 3.68kW per phase, a system follows G98: Electricity North West is notified within 28 days of commissioning and nothing has to be approved first.
Anything bigger is a G99 case and is applied for first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds Electricity North West as it does every network operator.
Parts of Lancashire are on a different network: some of its towns are served by SP Energy Networks and Northern Powergrid. Each town page names its own operator, worked out from that town's own location.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Lancashire
A heat pump in Lancashire
A heat pump does most of its work from November to February. Over those four months, 12 panels in Lancashire make about 810 kWh, against 2,720 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Lancashire
A 12-panel roof in Lancashire makes about 730 kWh in May. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar in Lancashire: your questions answered
What does a solar panel system produce in Lancashire?
Each kWp of panels in Lancashire makes 866 kWh a year on PVGIS figures, so a typical 12-panel system produces around 5,510 kWh, from about 150 kWh in December up to 730 kWh in May.
What would 12 solar panels cost in Lancashire?
£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Lancashire differs is output: about 5,510 kWh a year from that system.
Would a system in Lancashire need approval from the network operator?
The centre of Lancashire is on Electricity North West's network (North West England licence area). Systems up to 3.68kW per phase of inverter output follow G98: Electricity North West is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds Electricity North West as it does every network operator. Our G98 vs G99 guide explains both routes.
How much would export pay on a system in Lancashire?
It is exported. With typical use and no battery, about 4,571 kWh of the 5,510 kWh a 12-panel system makes in Lancashire goes to the grid, around £549 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.
Is solar worth it in Lancashire in winter?
It works, but the year is lopsided. 70% of a Lancashire roof's output lands between April and September; the four months from November to February give about 810 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.
Towns we cover in Lancashire
109 Lancashire towns have their own page, each with PVGIS figures, a network operator and a monthly curve for its own location.
Nearby in England
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Lancashire homeowners
The same guidance we would talk through on your call, written down and sourced.
How do solar panels work? The full explanation, from photon to plug socket
Light into silicon, DC into AC, AC into your bill. The whole chain, explained.
Read the guide →Inside a home battery: capacity, power and losses
Usable capacity, kW output, round trip losses and chemistry, in plain terms.
Read the guide →Three phase and EV charging: what actually changes
Three phase buys 22kW charging. Most cars cannot use it, and load balancing usually solves the real problem.
Read the guide →Are air source heat pumps any good? What owners actually report
The UK's largest survey found 80% of heat pump owners satisfied, against 70% for gas boilers.
Read the guide →The price cap explained, and what it does to solar payback
The cap limits unit rates, not bills. That changes what solar payback means.
Read the guide →Your MCS certificate: what it shows, when it arrives, and how a Smart Export Guarantee supplier uses it
The document your export payments hang on. Who issues it, what it shows, and how to get a copy.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.