Solar panels in Romiley, designed on a free call.
About 5,550 kWh a year from 12 panels in Romiley, £6,360 installed, with your system designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Sunlight in Romiley, in numbers
From 23.6 kWh per kWp in January to 114.2 in May: a roof in Romiley makes 4.8 times as much in its best month as in its darkest, and 873 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 23.6 |
| February | 43.4 |
| March | 76.1 |
| April | 103 |
| May | 114 |
| June | 109 |
| July | 109 |
| August | 96.5 |
| September | 81 |
| October | 55 |
| November | 35.9 |
| December | 25.6 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 873, Romiley is 6% below it.
How Romiley compares
Small towns rarely get published solar figures, so here are the numbers for Romiley. It is one of 45 Cheshire towns we track, and it ranks 38th of 45 for solar yield, a town of 10,991 people in the House of Commons Library settlement data. PVGIS gives its roofs 873 kWh per kWp a year, 2.39 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £801 of year one benefit, £247 of it from your own generation and £554 from export at 12p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Romiley's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Any planning application in Romiley sits with Stockport, and its official House of Commons Library settlement class is small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Romiley (53.41405, -2.08906), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
Electricity North West and your Romiley connection
Romiley sits in Electricity North West's North West England licence area, so Electricity North West is the network operator (DNO) any solar panels or battery here are registered with.
Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to Electricity North West within 28 days of commissioning, with no prior approval.
Above that, G99 means applying before the work is booked. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds Electricity North West as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Romiley
A heat pump in Romiley
Heating demand peaks when solar is weakest. In Romiley, a 12-panel system makes about 160 kWh in December and 150 kWh in January, a fraction of its 730 kWh in May, which is why a heat pump here is costed on its tariff first.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Romiley
Romiley's May output, about 730 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
Installed prices, the same in every town
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Romiley
If a system in Romiley is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.
Romiley solar questions
How much energy would 12 solar panels make in Romiley?
Romiley averages 2.39 peak sun hours a day, which PVGIS turns into 873 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 5,550 kWh, 70% of it between April and September.
Is solar more expensive in Romiley?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Romiley, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 5,550 kWh a year here, which is what drives payback.
Who is the network operator in Romiley, and do I need a G99 application?
The operator is Electricity North West. Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds Electricity North West as it does every network operator. Your design call checks which route yours needs.
What could I earn from exporting in Romiley?
On the 12p export scenario, a 12-panel system in Romiley sends about 4,616 kWh a year to the grid, worth around £554. The export rates table compares what each supplier pays.
How does solar perform in Romiley in the winter months?
January is the weakest month in Romiley: about 150 kWh from 12 panels, against 730 kWh in May. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.
How Romiley compares with its neighbours
The six closest towns we publish, run through the identical PVGIS query as Romiley.
| Town | kWh per kWp a year | vs Romiley |
|---|---|---|
| Romiley | 873 | this town |
| Bredbury and Woodley | 872 | −1 kWh |
| Marple | 866 | −7 kWh |
| Hyde | 859 | −14 kWh |
| Denton | 864 | −9 kWh |
| Hazel Grove | 880 | +7 kWh |
| Stockport | 882 | +9 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also for Romiley: Solar panels in Romiley from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Guides worth reading before your call
Sourced, dated and written by us. The same ground we cover on your free call.
DNO application timescales, network by network: from a G98 notification to a G99 approval
Fit and notify within 28 days, or wait ten working days to 45 for a yes. System size decides which.
Read the guide →Whole home backup or partial backup? The runtime arithmetic
Whole home backup sounds obvious until you do the runtime maths. Here is how to choose the right tier.
Read the guide →Home EV charger types and speeds, explained properly
Granny cable, 7kW wall unit or 22kW three phase. What each adds per hour, and which you need.
Read the guide →What MCS certification actually buys you on a heat pump job
The gate on the £7,500 grant, the design standard behind your running costs, and the noise sign-off.
Read the guide →Choosing a tariff when you have solar, a battery and an EV
Solar, battery and EV want different tariffs. How to work out which one to protect.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.