0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Radnorshire, Wales

Solar and batteries in Radnorshire, sized to your roof.

Twelve panels (6.36 kWp) here make about 5,830 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Radnorshire

How much a Radnorshire roof makes, month by month

From 24.9 kWh per kWp in December to 117.6 in May: a roof in Radnorshire makes 4.7 times as much in its best month as in its darkest, and 917 kWh per kWp across the year.

Map showing Radnorshire A simplified outline map of Radnorshire with neighbouring counties shown faintly, and a pin marking the location of Radnorshire.
Radnorshire

Generation per kWp, month by month

Radnorshire, 917 kWh per kWp a year
Radnorshire, monthly generation per kWp Bar chart, twelve months January to December. Peak May at 118 kWh/kWp. Lowest December at 24.9 kWh/kWp. Full values are in the table below this chart. 135 0 JFMAMJJASOND 118
Show the monthly figures
Radnorshire, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January28.4
February46.5
March81.7
April109
May118
June115
July114
August100
September85.9
October57.1
November37.5
December24.9

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

5,830kWh a year, 12 panels
750kWh in May, the peak
160kWh in December

Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 917, Radnorshire is 1% below it.

How Radnorshire compares

Radnorshire ranks joint 47th of the 85 counties we track for solar yield. Self use does the heavy lifting here: of the £834 year one benefit on a typical 12 panel system, £247 comes from replacing 26.32p imports with your own generation, which is why battery sizing matters more than panel count.

These are county-level starting numbers. A town page gives the figure for its own centroid, and your design call replaces both with your roof, its shading and your bills.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£834
£69 a month · payback 7.6 yrs
System price, installed
£6,360
Simple payback
7.6 yrs
Generates a year
5,832 kWh
Exported
4,895 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Generation from PVGIS v5.2 (European Commission JRC, SARAH3), retrieved August 2026 for a representative point in Radnorshire (52.2713, -3.3109), assuming 1 kWp, 14% system loss, 35 degree pitch, due south. Import valued at 26.32p/kWh (Ofgem price cap average, Oct to Dec 2026); off-peak charging at 8.5p/kWh where used (a supplier's published off-peak rate, checked September 2026); export at the scenario you pick, from the dated tariff table. Prices are installed pricing, August 2026, standard installations; 530W LONGi panels at £1,000 per kWp. Estimates for illustration, not a quote: your free design call prices your actual roof.

Local grid

NGED and your Radnorshire connection

On NESO's licence-area map, the middle of Radnorshire falls in South Wales, which National Grid Electricity Distribution (NGED) operates, and so do all the towns we cover in the county.

What decides the paperwork is the inverter and battery output, not the number of panels. Up to 3.68kW per phase, a system follows G98: NGED is notified within 28 days of commissioning and nothing has to be approved first.

Above that, G99 means applying before the work is booked. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.

Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Aerial view of a residential UK street where several homes have black solar panels fitted to rear roof pitches
Several homes on the same street, all now fitted with solar.
Beyond solar

Adding a heat pump or an EV charger in Radnorshire

A heat pump in Radnorshire

In December, the darkest month here, 12 panels in Radnorshire make about 160 kWh. That is when a heat pump runs hardest, so its running cost in Radnorshire comes down to the tariff and the flow temperature rather than the roof.

Grant support in Wales comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in Radnorshire

Radnorshire's May output, about 750 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.

If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.

EV charging explained

FAQs

Radnorshire solar questions

How much energy would 12 solar panels make in Radnorshire?

Radnorshire averages 2.51 peak sun hours a day, which PVGIS turns into 917 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 5,830 kWh, 70% of it between April and September.

Is solar more expensive in Radnorshire?

Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Radnorshire, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 5,830 kWh a year here, which is what drives payback.

Who is the network operator in Radnorshire, and do I need a G99 application?

The operator is National Grid Electricity Distribution (NGED). Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. Your design call checks which route yours needs.

What could I earn from exporting in Radnorshire?

On the 12p export scenario, a 12-panel system in Radnorshire sends about 4,895 kWh a year to the grid, worth around £587. The export rates table compares what each supplier pays.

How does solar perform in Radnorshire in the winter months?

December is the weakest month in Radnorshire: about 160 kWh from 12 panels, against 750 kWh in May. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Radnorshire. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.