0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Northumberland

Solar panels in Berwick-upon-Tweed, with the numbers shown.

About 6,090 kWh a year from 12 panels in Berwick-upon-Tweed, £6,360 installed, with your system designed on a free 30-minute video call.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Berwick-upon-Tweed

What a roof in Berwick-upon-Tweed can generate

Berwick-upon-Tweed's best month is May, at 128.8 kWh per kWp; December manages 25.9. Over the year that comes to 958 kWh per kWp, 7% above our Northumberland county estimate.

Map showing Berwick-upon-Tweed in Northumberland A simplified outline map of Northumberland with neighbouring counties shown faintly, and a pin marking the location of Berwick-upon-Tweed.
Berwick-upon-Tweed in Northumberland

Generation per kWp, month by month

Berwick-upon-Tweed, 958 kWh per kWp a year
Berwick-upon-Tweed, monthly generation per kWp Bar chart, twelve months January to December. Peak May at 129 kWh/kWp. Lowest December at 25.9 kWh/kWp. Full values are in the table below this chart. 148 0 JFMAMJJASOND 129
Show the monthly figures
Berwick-upon-Tweed, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January31.5
February49.5
March83.1
April114
May129
June115
July119
August105
September88.4
October59.4
November39
December25.9

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

6,090kWh a year, 12 panels
820kWh in May, the peak
160kWh in December

Against Great Britain as a whole: Berwick-upon-Tweed makes 958 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Berwick-upon-Tweed is 4% above it.

How Berwick-upon-Tweed compares

Small towns rarely get published solar figures, so here are the numbers for Berwick-upon-Tweed. It is one of 18 Northumberland towns we track, and it ranks 10th of 18 for solar yield, a town of 13,301 people in the House of Commons Library settlement data. PVGIS gives its roofs 958 kWh per kWp a year, 2.62 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £866 of year one benefit, £247 of it from your own generation and £619 from export at 12p.

Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Berwick-upon-Tweed's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.

Berwick-upon-Tweed sits within Northumberland, its local planning authority, and the House of Commons Library classes it as a small town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£865
£72 a month · payback 7.4 yrs
System price, installed
£6,360
Simple payback
7.4 yrs
Generates a year
6,093 kWh
Exported
5,156 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Generation is modelled from PVGIS satellite data for Berwick-upon-Tweed's own coordinates (55.76602, -2.01182), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.

Local grid

Connecting solar to the Berwick-upon-Tweed network

On NESO's licence-area map, Berwick-upon-Tweed is in South and Central Scotland, which SP Energy Networks operates. That makes SP Energy Networks the network operator for any system fitted here.

Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to SP Energy Networks within 28 days of commissioning, with no prior approval.

A bigger inverter or battery output needs a G99 application in advance. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator.

Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Aerial view of a red-brick new-build home with a dark solar panel array on the front roof pitch
A dense panel array fitted to a new-build home's front roof pitch.
Beyond solar

Heat pumps and EV charging in Berwick-upon-Tweed

A heat pump in Berwick-upon-Tweed

Solar and a heat pump pull in opposite directions through the year: Berwick-upon-Tweed's roofs make 930 kWh from November to February on a 12-panel system, and 2,970 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.

In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in Berwick-upon-Tweed

From April to September, 70% of a Berwick-upon-Tweed roof's yearly output arrives, peaking at about 820 kWh in May on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.

Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.

EV charging explained

Already got panels?

Solar panel servicing and repair in Berwick-upon-Tweed

Guidance is nationwide, so the benchmarks hold in Berwick-upon-Tweed: repair costs, service scope, and when the inverter is the real fault.

FAQs

Berwick-upon-Tweed solar questions

What could a roof in Berwick-upon-Tweed generate?

PVGIS puts a roof in Berwick-upon-Tweed at 958 kWh per kWp a year, 2.62 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,090 kWh a year, most of it between April and September.

What would 12 solar panels cost in Berwick-upon-Tweed?

£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Berwick-upon-Tweed differs is output: about 6,090 kWh a year from that system.

Do I need permission from the DNO for solar in Berwick-upon-Tweed?

Usually not in advance. SP Energy Networks, the network operator for Berwick-upon-Tweed, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator. "See our DNO explainer.

How much would export pay on a system in Berwick-upon-Tweed?

It is exported. With typical use and no battery, about 5,156 kWh of the 6,090 kWh a 12-panel system makes in Berwick-upon-Tweed goes to the grid, around £619 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.

Do solar panels work in winter in Berwick-upon-Tweed?

Yes, at a lower level. PVGIS gives Berwick-upon-Tweed 25.9 kWh per kWp in December and 31.5 in January, so a 12-panel system makes about 160 kWh and 200 kWh in those months, against 820 kWh in May. Winter output mostly covers daytime use rather than exporting.

How Berwick-upon-Tweed compares with its neighbours

The six closest towns we publish, run through the identical PVGIS query as Berwick-upon-Tweed.

TownkWh per kWp a yearvs Berwick-upon-Tweed
Berwick-upon-Tweed958this town
Dunbar949−9 kWh
Alnwick971+13 kWh
Haddington925−33 kWh
Galashiels894−64 kWh
North Berwick960+2 kWh
Hawick858−100 kWh

Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.

Also for Berwick-upon-Tweed: Solar panels in Berwick-upon-Tweed from OVO Solar & Battery

All of Northumberland

Also near Berwick-upon-Tweed

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Berwick-upon-Tweed. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.