Solar panels in Bradford-on-Avon, designed on a free call.
Twelve panels (6.36 kWp) here make about 6,490 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Bradford-on-Avon roof makes, month by month
PVGIS puts Bradford-on-Avon at 1,020 kWh per kWp a year, 2% below our Wiltshire county estimate. 68% of it arrives between April and September, peaking in July.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 38.9 |
| February | 53 |
| March | 89 |
| April | 116 |
| May | 125 |
| June | 122 |
| July | 126 |
| August | 111 |
| September | 95.2 |
| October | 65.4 |
| November | 45.3 |
| December | 34.5 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Bradford-on-Avon makes 1,020 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Bradford-on-Avon is 10% above it.
How Bradford-on-Avon compares
Small towns rarely get published solar figures, so here are the numbers for Bradford-on-Avon. It is one of 20 Wiltshire towns we track, and it ranks joint 11th of 20 for solar yield, a town of 10,017 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,020 kWh per kWp a year, 2.80 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £913 of year one benefit, £247 of it from your own generation and £666 from export at 12p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Bradford-on-Avon's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Any planning application in Bradford-on-Avon sits with Wiltshire, and its official House of Commons Library settlement class is small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Bradford-on-Avon (51.34585, -2.25021), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
The network operator for Bradford-on-Avon
On NESO's licence-area map, Bradford-on-Avon is in Southern England, which Scottish and Southern Electricity Networks (SSEN) operates. That makes SSEN the network operator for any system fitted here.
Most home systems stay within 3.68kW per phase of inverter output, which puts them on G98, a notification to SSEN within 28 days of switch-on. Panel count does not decide it; the inverter and any battery do.
Above that, G99 means applying before the work is booked. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.
Sources: NESO DNO licence areas (3 May 2024); SSEN, micro-generation connections page, checked 25 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Bradford-on-Avon
A heat pump in Bradford-on-Avon
In December, the darkest month here, 12 panels in Bradford-on-Avon make about 220 kWh. That is when a heat pump runs hardest, so its running cost in Bradford-on-Avon comes down to the tariff and the flow temperature rather than the roof.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Bradford-on-Avon
Bradford-on-Avon's July output, about 800 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Bradford-on-Avon
The same sourced benchmarks apply in Bradford-on-Avon as everywhere we cover: honest repair pricing and what a service should include.
Solar in Bradford-on-Avon: your questions answered
How much electricity do solar panels make in Bradford-on-Avon?
About 6,490 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Bradford-on-Avon: 1,020 kWh per kWp, or 2.80 peak sun hours a day on average. July is the strongest month, at about 800 kWh.
Is solar more expensive in Bradford-on-Avon?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Bradford-on-Avon, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,490 kWh a year here, which is what drives payback.
Which DNO covers Bradford-on-Avon, and what does it need from me?
Scottish and Southern Electricity Networks (SSEN) covers Bradford-on-Avon. A home system of up to 3.68kW per phase is notified to SSEN within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.
What could I earn from exporting in Bradford-on-Avon?
On the 12p export scenario, a 12-panel system in Bradford-on-Avon sends about 5,551 kWh a year to the grid, worth around £666. The export rates table compares what each supplier pays.
How much solar does Bradford-on-Avon get in December?
December is the low point: about 220 kWh from a 12-panel system in Bradford-on-Avon, on PVGIS data, rising to 800 kWh in July. From November to February the same system makes about 1,090 kWh in total, which is why a battery charged off-peak does more of the work in winter.
How Bradford-on-Avon compares with its neighbours
How the towns nearest Bradford-on-Avon compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Bradford-on-Avon |
|---|---|---|
| Bradford-on-Avon | 1,020 | this town |
| Trowbridge | 1,022 | +2 kWh |
| Melksham | 1,031 | +11 kWh |
| Bath | 1,018 | −2 kWh |
| Westbury | 1,029 | +9 kWh |
| Corsham | 1,025 | +5 kWh |
| Frome | 1,008 | −12 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also for Bradford-on-Avon: Solar panels in Bradford-on-Avon from OVO Solar & Battery
Also near Bradford-on-Avon
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Bradford-on-Avon homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
G98 vs G99: the 28-day form and the eight-week wait, in plain English
One number on your quote decides between a formality and an eight week wait.
Read the guide →How much a battery saves by charging on cheap night rates
What charging at 8.5p and using at 26.32p is actually worth over a year.
Read the guide →What it really costs to charge an EV at home versus in public
Home off-peak charging costs a fraction of the public price. The arithmetic, and the tariff it depends on.
Read the guide →Do you need to replace your radiators for a heat pump?
Some change, most do not. The room by room arithmetic that decides which.
Read the guide →Why tariff choice moves payback more than kit choice
Identical kit, five times the export income. The tariff decision worked through with August 2026 rates.
Read the guide →NAPIT, NICEIC and competent person schemes: who tells building control about your solar
Solar work is notifiable. A competent person scheme means your installation team notifies, not you.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.